Full or partial renovation of your flat with a fixed quote in writing, a dedicated site manager and warranty. Free technical visit across Catalonia.
A flat renovation is much more than changing floors and painting: it means redoing the services (plumbing, electrics and heating), rethinking the layout and recovering light, space and insulation. At Tu Nuevo Piso we do full and partial renovations in Barcelona and across Catalonia with a simple approach: a free technical visit, a fixed quote itemised by chapter, and one site manager who coordinates all the trades and handles licences and permits, so you don't have to chase anyone.

These are the technical phases of a full renovation. We coordinate all the trades so they follow this order without dead time.
We measure the flat, check the state of the services and structure, and set out the new layout. The project and the fixed quote come from here.
Removing partition walls, floors, wall tiles, old sanitaryware and joinery, with waste management and protection of shared areas.
Plumbing, drainage, electrics (new consumer unit and circuits, electrical certificate CIE), gas and heating or aerothermal. It is the phase you do not see, but it matters most.
New layout in masonry or plasterboard, screeds, shower formation, service chases and wall preparation.
Tiling in kitchens and bathrooms, flooring (porcelain, wood flooring, microcement), suspended ceilings and insulation.
Doors, wardrobes, windows (PVC or aluminium with thermal break), kitchen units, worktops and sanitary ware.
Skim coat and painting, switches and sockets, lighting, taps and final touches.
Final clean, a walk-through with you, handover of certificates and activation of the guarantee.
We come to your flat, measure up and listen to what you want. No cost and no obligation, anywhere in Catalonia.
You get a fixed quote, broken down by item and in writing. No small print and no last-minute extras.
One site manager coordinates all the trades and sends you regular photos and video of the real progress.
We hand over on schedule, with certificates. The works are backed by a written guarantee.
A fixed price, itemised after the visit. The price you sign is the price you pay.
One point of contact for the whole renovation. No chasing up five different trades.
A written guarantee on the works.
Bricklayers, plumbers, electricians and carpenters under one contract and one schedule.
We handle prior works notifications and licences, and help you with Next Generation grants and income tax (IRPF) deductions.
A realistic timetable from the start, and we tell you if anything could affect it.
Indicative market ranges to help you get your bearings. The final price is a fixed quote, given after the visit.
| Quality level | What it covers | Price per m² | |
|---|---|---|---|
| Basic / functional | Standard finishes, layout unchanged | 520 – 650 €/m² | |
| Mid-range quality | Selected materials, possible changes to the layout | 750 – 940 €/m² | |
| High end / luxury | Premium materials and exclusive interior design | 1,060 – 1,340 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges for a full renovation, from functional to mid-range. VAT is extra, and high-end work goes beyond these figures.
Studios and compact flats. Even a small flat needs a full kitchen and bathroom, so the price per m² is somewhat higher.
The most common size in Barcelona. Full renovation with a kitchen, one or two bathrooms and a new layout.
Family homes: more flooring and wall finishes to cover and, quite often, two full bathrooms.
Large homes, penthouses and duplexes. The budget depends a lot on the finishes and on how much the layout changes.
In smaller flats the price per m² is higher: the kitchen and bathroom cost almost the same whether the flat is 45 or 90 m². The exact figure comes from the fixed quote after the free technical visit.
What a turnkey full renovation covers, and what to keep in mind separately.
The VAT (10% or 21%, depending on the case) is always shown separately on the quote. What is and is not included is put in writing before work starts.
We coordinate any work within the renovation, from the whole flat down to a single trade.
From the whole flat down to a single room. We redesign your kitchen, bathroom, terrace or any corner you want to transform, with finishes to your taste.
Full home renovationEverything that protects and serves your flat: façade, roof and windows, plus water, electricity, gas and heating and air conditioning, up to date and up to code.
InstalacionesEvery trade and every procedure under one person responsible: from the licence and project through to site management and the final coat of paint.
Project and permitsA flat in a building, a detached house with a plot or a penthouse with a terrace is not renovated in the same way. Each type of home has its own page.
Types of homeWorks in a shop or office with an activity licence and an opening date, and across whole buildings for owners' communities.
Shops and officesEach guide includes the quote itemised by chapter for that size, with timescales and our reference projects.
Each city has its own housing stock, buildings and permits. These pages explain how we work in each one.
Barcelona and across Catalonia. Explore the map or search for your city and neighbourhood.
Official boundary data for comarques and municipalities (ICGC, 2025).
Everything you need to know about renovating your flat in Catalonia and nearby.
A full flat renovation in Barcelona typically costs, as a guide, between 520 and 1,340 €/m², depending on the finishes: about 520–650 €/m² for basic, 750–940 €/m² for mid-range and 1,060–1,340 €/m² for high end. A flat of 80–100 m² usually falls between 41,300 and 103,000 €. The exact price is always a fixed quote after the free technical visit.
A full renovation of a medium flat (70–100 m²) usually takes between 10 and 16 weeks. Bespoke furniture and, above all, major works licences can add several weeks. We give you a timetable in writing before work starts.
With a clear payment schedule set out in the contract. We work with a modest initial deposit to secure the date and buy the first materials, part payments tied to real site milestones (not calendar dates), and a final retention that you pay once the snagging is resolved. That way the money follows the actual progress of the works. We never ask for disproportionate deposits: if a company asks for more than 40% upfront, be wary.
We reply within 24 working hours. We arrange the technical visit at a time that suits you, usually within a few days. It is free and without obligation, anywhere in Catalonia. The fixed, itemised quote usually reaches you 3 to 5 working days after the visit, because we prepare it item by item rather than giving you a figure out of thin air.
In three concrete ways. First, a fixed quote, itemised by chapter and in writing: no “from” prices that climb later. Second, one identifiable site manager who coordinates all the trades and sends you regular photos and video of progress, rather than subcontracting blind. And third, a written guarantee. You pay as the works progress, and you always know who is responsible.
A full renovation renews the whole home: layout, complete services, kitchen, bathrooms and finishes. A partial one covers only part of it, for example the kitchen or one bathroom, without touching the rest. If the flat is old and the services need renewing, a full renovation almost always makes sense.
With a technical visit and a plan. First you define what you want and what the flat allows (structure, services, community rules), and from that comes the fixed quote. The works always follow the same order: demolition, services, masonry, wall and floor finishes, joinery, then painting and final finishes.
It depends on the council and on what you touch, because each Ajuntament regulates it in its own bylaw. A renovation without a significant structural impact usually goes through the lightest route your municipality provides (a responsible declaration, an assabentat or a prior notification, with or without a technical project). A licence, minor or major, is needed for a change of use, a significant structural change, works in a listed building or an extension. We handle whichever applies with the Ajuntament.
For private homes (or owners’ communities) finished at least two years before the works start, the reduced 10% VAT rate applies if the materials supplied by the company do not exceed 40% of the taxable base. If they do, or for new-build work, 21% applies. From 1 December 2026, if Congress validates Royal Decree-law 29/2026, the reduced rate will also cover homes let as a main residence, and payment will have to be by card, transfer, nominal cheque or bank deposit. We show this clearly on the quote.
Usually the services (plumbing, electrics, air conditioning and heating), then the kitchen and bathrooms, followed by joinery and windows. Labour usually makes up between 35% and 55% of the total.
In a full renovation it is not recommended: there is dust, cuts to water and power, and noise. With partial renovations done in stages, it is possible to live alongside the works by sectioning off the area. We will assess this with you during the visit.
Always ask for a fixed, itemised quote in writing, check what the written guarantee covers, and be wary of prices well below market or deposits above 40%. An identifiable site manager and a written guarantee are good signs.
We hand over the works with a guarantee covering the workmanship and materials. When the works require a project under the Spanish Building Act (LOE), it sets longer liability periods: ten years for structural damage, three for habitability defects and one for finishes. On works without a project those periods do not apply automatically.
A well-done full renovation can add around 15–30% to the value of a home, especially if it improves the kitchen, bathrooms, windows and energy efficiency. If you plan to sell or rent, a good facelift usually has a high return.
Demolition and rubbish removal, new services (water, drainage, electrics with electrical certificates, gas and air conditioning), a new layout, wall and floor coverings, complete kitchen and bathrooms, joinery, windows, painting and finishes, plus a final clean, the electrical certificates and the guarantee.
Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heat pumps), you may be eligible for Next Generation funds managed in Catalonia by ICAEN, and for Spanish income tax (IRPF) deductions. We help you with the energy certificates before and after the works, and with the paperwork. Deadlines and percentages depend on the current call for applications.
The LOE requires a project, and with it site supervision, for interventions that alter the architectural configuration of the building; a renovation that does not significantly affect the structure or layout usually does not reach that point. Even so, some Ajuntaments, such as Barcelona’s, ask for a project signed by a technician even for layout changes that leave the structure alone, so it is confirmed case by case with the Ajuntament. We have a registered technical architect on hand.
It depends on use and budget. For floors, porcelain stoneware tiles and laminate flooring give great results at a modest price, and microcement is on trend. For windows, PVC or aluminium with a thermal break makes a big difference to comfort. We advise you item by item during the visit.
With a fixed quote and a thorough prior visit that checks the real condition of the services and structure. Even so, it is wise to set aside a 10–15% margin for hidden issues such as damp, aluminosis or obsolete services. We photograph and document them before touching them.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free technical visit across Catalonia and a fixed quote in writing. Reply within 24 h.