Space · Catalonia

Loft (buhardilla) conversions in Catalonia

A buhardilla is a room hidden under the roof. Insulated and with enough light, a dusty attic becomes a bedroom, a study or a den with a lot of charm. The secret is the insulation.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Loft conversion

The space you already own, under the roof.

The attic is the cheapest square metres in any house: the walls and the floor are there, and the roof is already over it. What it needs is to be made comfortable year-round, which is a matter of insulating the roof, getting light in, and building the stair and the services to match.

Insulation is the heart of it. A roof with no insulation turns an attic into an oven in July and a freezer in January, and everything else is wasted if that is not solved. We insulate the pitched roof from the inside or the outside depending on the roof, and treat the thermal bridges at the eaves and the gables, which is where most failures happen.

Light comes from roof windows, and a dormer where you need headroom. Furniture is best made to measure under the slopes. Whether the finished room counts as a habitable room depends on minimum headroom, natural light and ventilation — and that matters for sale and for letting. For a house that also needs work elsewhere, see house renovation; for a terraced house, terraced houses.

White aluminium radiator under a grey-green wall in a bedroom, beside a bed with a green bedspread and dark parquet floor
How it runs

Converting a loft, step by step.

Three to eight weeks for a typical loft. The stair and any dormer are the longest items.

01

Survey and feasibility

We measure headroom, check the roof and the floor structure, and decide whether the space can become a room.

02

Permits

A notification or licence, depending on whether you form a dormer or change the roof.

03

Roof insulation

Insulation of the pitched roof, sealing of thermal bridges at the eaves and gables.

04

Windows and dormers

Roof windows or a dormer to bring in light and ventilation.

05

Stair and floor

A new stair if needed, and a strengthened and insulated floor.

06

Services and bathroom

Electrics, heating and cooling, and a bathroom if you want one, with plumbing run under the roof.

07

Joinery and finishes

Made-to-measure storage under the slopes, flooring and painting.

How we work

How we run a loft conversion.

01

Free survey

We measure and tell you honestly whether the loft can be a room. No cost and no obligation.

02

Fixed quote

An itemised quote with the stair, the windows and the insulation priced separately.

03

Build, with one site manager

One person coordinates the roofer, the carpenter and the electrician.

04

Handover and warranty

Certificates and warranty.

Why us

Why convert your loft with us.

Insulation done properly

A comfortable room in July and in January, not just in May.

Feasibility before design

We tell you if the headroom, the structure or the rules make it impossible.

Light solved early

Roof windows and dormers specified at the start, because they decide the layout.

Storage under the slopes

Made-to-measure joinery that uses the awkward spaces.

One site manager

Every trade coordinated by one person.

Honest about habitability

We say plainly whether the finished room will count as habitable.

Prices

What a loft conversion costs.

Per square metre of floor area, VAT excluded.

What a loft conversion costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
Simple useStandard finishes, practical solution500 – 800 €/m²
Suite with bathroomPremium materials and high-end interior design1,200 – 1,800 €/m²
Indicative prices · VAT not included. The price is set by roof insulation and the roof windows, plus the made-to-measure storage under the slopes. Adding a bathroom raises it because of the plumbing under the roof. Everything is itemised.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate40,000 – 64,000 €Simple use · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of loft.

Indicative ranges, VAT excluded.

Small loftUp to 25 m²12,000 – 28,000 €

A study, playroom or small bedroom with a lot of charm.

Medium loft25 – 50 m²22,000 – 55,000 €

Room for a suite with a bathroom or a large living space under the roof.

Large loftOver 50 m²From 45,000 €

Whole floors under the roof, almost a separate home.

Insulation and light onlyMaking it usableFrom 200 €/m²

Insulating the roof and fitting roof windows so that the space can be used.

Whether the loft counts as a habitable room depends on headroom, natural light and ventilation, and on the local rules. A loft that does not meet them can still be a useful study or storage room, but it will not add a bedroom to the listing.

No small print

What is included and what is not.

The scope of a turnkey loft conversion, and what is separate.

✓ Included in the price

  • Survey and feasibility check
  • Roof insulation and sealing of thermal bridges
  • Roof windows
  • Floor strengthening and insulation
  • Electrics with certificate
  • Heating and cooling
  • Flooring and painting
  • Made-to-measure storage
  • A written warranty

✕ Not included — quoted separately

  • A dormer, unless itemised
  • A new stair, unless itemised
  • A bathroom, unless itemised
  • Furniture and decoration
  • Council taxes and fees
  • Works to the roof structure beyond what the survey foresaw

VAT is shown as its own line — 10% or 21% depending on your case.

Where we work

Where we convert lofts.

Lofts across Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about converting a loft.

Can I turn my loft into a bedroom?

Often, if it meets the conditions. A habitable bedroom generally needs enough headroom over a minimum floor area, natural light and ventilation, and a safe stair. Many lofts qualify with the right roof windows; some do not, and we tell you at the survey. It also depends on the local rules and, in a flat, on the owners’ association.

Why is insulation so important?

Because the roof is where the heat gets in and out. An uninsulated roof makes an attic unbearable in summer and cold in winter, and the heating and cooling bill will cancel the benefit of the extra room. Insulation, done properly with the thermal bridges treated, is the single most important part of the job.

How do I get light into a loft?

With roof windows set into the slope, which give more light than a vertical window of the same size, or with a dormer where you need headroom and a vertical window. We decide which at the survey, because it affects both the layout and the permit.

How much does a loft conversion cost?

Roughly 500 to 800 €/m² for simple use, 800 to 1,200 €/m² for a habitable room and 1,200 to 1,800 €/m² for a suite with a bathroom, excluding VAT. A 35 m² habitable loft comes to around 28,000 to 42,000 €.

How long does it take?

Three to eight weeks of building, plus time for any permit. A dormer or a new stair adds to it.

How is it paid for?

In stages tied to completed work: a deposit on signing, payments at the end of each phase, and a final payment at handover.

Free quote

Find out if your loft can be a room.

Free survey anywhere in Catalonia. We tell you honestly whether the headroom and the rules allow it.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →