Services · Catalonia

Electrical installations and rewiring in Catalonia

Electricity is the part you cannot see and the part that matters most: an old installation is a hazard and a nuisance. We renew consumer units and circuits, increase supply capacity and issue the certificate, with authorised electricians.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Electrical installations

The wiring behind the walls.

The electrics of an old Barcelona flat are often the same wiring that was installed when the building went up: a single small circuit for the whole flat, no earth, and a fuse board that predates modern protection. It was adequate for a few lamps and a radio. It is not adequate for an induction hob, air conditioning and a washing machine running together, and it is a genuine fire and shock risk.

A modern installation is divided into separate circuits for lighting, sockets, the kitchen, the washing machine and air conditioning, each with its own protection, all earthed, behind a consumer unit with a residual-current device. Rewiring is cheapest when the walls are open, which is why it is part of every full renovation.

The paperwork matters. The electrical installation certificate — the boletín or CIE — is issued by an authorised installer and is what legalises the installation with the supplier. You need it to connect or increase the supply, and a buyer or a letting agent will ask for it. See full home renovations and EV charging.

Room under construction with grey walls and laminate flooring already laid, recessed ceiling spotlights, a double switch, sockets and an unconnected cable on the wall
How it runs

Rewiring, step by step.

A day for a new consumer unit; one to two weeks for a whole flat.

01

Survey and testing

We test the existing installation, record its circuits and agree what you need.

02

Design

A circuit layout sized for your appliances and for growth.

03

Chasing and first fix

New cable routes formed in the walls and floors, conduits and boxes fitted.

04

Cabling

New cables drawn, all circuits earthed.

05

Consumer unit

A new consumer unit with protection devices for each circuit.

06

Second fix

Sockets, switches and light fittings.

07

Testing and certificate

The installation tested and the certificate issued.

How we work

How we run an electrical job.

01

Survey

We test and report. Free for larger jobs.

02

Fixed quote

A fixed price, with the certificate included.

03

The work

Done by authorised electricians, with minimal disruption.

04

Certificate and warranty

Issued on completion.

Why us

Why use us for electrics.

Authorised electricians

And a certificate on every job.

Designed for how you live

Circuits sized for your appliances, not copied from a template.

Room to grow

Spare ways in the consumer unit and conduits for later additions.

Supply increases handled

We adapt the installation and arrange the increase with your supplier.

Tidy

Chasing and making good done cleanly.

Warranty

On the work.

Prices

What electrical work costs.

Indicative ranges, VAT excluded.

What electrical work costs — Indicative prices · VAT not included
WorkWhat it coversIndicative range (€)
New consumer unit + certificateStandard finishes, practical solution400 – 900 €
Supply increasePremium materials and high-end interior designFrom 300 €
Indicative prices · VAT not included. Renewing the whole electrical installation of a home depends on the floor area and the number of points and circuits. Changing only the consumer unit with its certificate is more affordable. A supply increase also involves the paperwork with your supplier. Everything is itemised.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Full renovation · functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

By work

What it costs by type of work.

Indicative ranges, VAT excluded.

Targeted workConsumer unit or points300 – 900 €

Changing the consumer unit, adding circuits or points, with the certificate.

Average flatComplete installation2,500 – 6,000 €

Renewing all the electrics in a flat, with consumer unit, circuits and certificate.

Large homeHouse or large flatFrom 5,000 €

More floor area and more points and circuits.

Supply increaseWith the supplierFrom 300 €

Adapting the installation and arranging more power with the supplier.

More power from the supplier is a request that the supplier processes, with its own charges and timescales. The installation has to be able to take it first, and we make sure it can.

No small print

What is included and what is not.

The scope of an electrical job, and what is separate.

✓ Included in the price

  • Survey and testing of the existing installation
  • Circuit design
  • New cabling, all circuits earthed
  • New consumer unit with protection devices
  • Sockets, switches and fittings, where itemised
  • Testing
  • The installation certificate (CIE)
  • A written warranty

✕ Not included — quoted separately

  • Supplier charges for increasing the supply
  • Light fittings and appliances, unless itemised
  • Making good and redecoration after chasing, unless itemised
  • Council fees where they apply
  • Works needing the owners’ association’s consent
  • Upgrades to the building’s communal supply

VAT is shown as its own line — 10% or 21% depending on your case.

Where we work

Where we do electrical work.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about electrics.

When does the electrical installation need renewing?

If the flat is decades old and has never been touched, almost certainly. Old installations without an earth connection or modern protection are a risk and cannot cope with today’s loads — air conditioning, an induction hob, several appliances at once. In a full renovation it is essential. We assess it at the survey.

What is the boletín (CIE) and do I need one?

The electrical installation certificate is the document an authorised installer issues to legalise the installation with the supplier. It is needed to connect or to increase the supply, and a buyer or letting agent will ask for it. We issue it, and it is included in the price.

Can you increase the power in my home?

Yes. We adapt the installation to the new power and arrange the increase with your supplier. It is what you need if the trip switch operates when you use several appliances together, or if you are adding air conditioning, an induction hob or an EV charger.

How much does it cost to rewire a flat?

Roughly 2,500 to 6,000 € for an average flat, excluding VAT, including the consumer unit, the circuits and the certificate. Changing only the consumer unit with its certificate is around 400 to 900 €.

Do you use authorised electricians?

Yes, always. Electrical work that is certified must be done by an authorised installer, and every job ends with the certificate.

How is it paid for?

Small jobs on completion; larger work in stages tied to completed work.

Free quote

Get a quote for your electrics.

Free survey and testing for larger jobs anywhere in Catalonia. Certificate included.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →