Building work is the foundation of every job: partitions, floors, tiling, making good and small repairs. Experienced bricklayers so that what is built comes out straight, solid and well finished.
A albañil — the Spanish bricklayer and general builder — does the work that every other trade stands on: building and removing partitions, laying floor and wall tiles, forming shower bases, bedding frames and making good the damage left by plumbers and electricians. If that layer is not straight and solid, nothing built on it will be.
You can hire building work by itself for a specific job, or as part of a wider renovation. As a stand-alone job it is priced by the square metre or by the item: a partition, a floor, a shower base. Inside a larger renovation it is part of the programme and its timing matters, because the bricklayer is usually the first on site and the last to leave.
One practical rule: do not remove a wall without knowing what it holds up. A partition and a load-bearing wall look similar and behave very differently, and the difference is a structural calculation rather than a guess. We check before we cut. For the whole-property version of this, see full home renovations.

From a day for a small repair to several weeks as part of a renovation.
We look at the work, check what the wall or floor is made of and what it carries.
Floors, doors and anything staying are protected before work starts.
Partitions removed, substrates prepared.
New partitions, screeds and bases built to line and level.
Floors and walls tiled, with correct falls where water is involved.
Openings closed, plaster repaired, frames bedded.
Rubble removed and the work left clean.
We look at the job and tell you what it needs. No cost and no obligation.
A price per square metre or per item.
Done tidily by experienced bricklayers.
Cleared up and checked with you.
Experienced bricklayers who set out properly.
A wall is checked for what it carries before it is removed.
A single partition or a repair is not too small.
Waste removed and disposed of lawfully.
Timed so plumbers, electricians and tilers are not kept waiting.
Per square metre or per item.
Indicative ranges, VAT excluded.
| Work | What it covers | Indicative range | |
|---|---|---|---|
| Floor / wall tiling | Standard finishes, practical solution | 25 – 50 €/m² | |
| Brick partition | Selected materials, best balance | 30 – 55 €/m² | |
| Individual jobs | Premium materials and high-end interior design | By the job |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Laying floor and wall finishes to a good standard.
Building or taking out partitions and re-planning the layout.
Forming built-in shower bases, screeds and bedding.
Mending partitions, closing openings and small building repairs.
Anything that involves a wall that may be load-bearing needs a technician to confirm it first, and sometimes a permit. See permits and drawings.
The scope of a building job, and what is separate.
VAT is shown as its own line — 10% or 21% depending on your case.
Building work connects every other trade.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about building work.
Yes. A single partition, a repair or a shower base is not too small. We give a fixed price for the job, and it is often done in a day or two.
Often, but first we must know what the wall holds up. A partition can come out freely; a load-bearing wall needs a calculated beam or lintel, and sometimes a permit. We check before cutting, and tell you the cost of doing it properly.
Roughly 25 to 50 €/m² to tile a floor or wall and 30 to 55 €/m² for a brick partition, excluding VAT. Shower bases and screeds start at about 300 €.
Yes. Waste is removed and disposed of at an authorised site. We say in the quote whether skips and permits are included.
Yes. We time the building work so that the plumber, electrician and tiler are not kept waiting, which is where small renovations lose most time.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia. A fixed price per square metre or per item.