Services · Catalonia

Construction project management in Catalonia

If you have a building project but not the time or the knowledge to coordinate it, we manage it for you: planning, control of time, cost and quality, and one person responsible for it all coming out right.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Project management

Someone on your side of the contract.

A renovation has many parties: the owner, an architect perhaps, a dozen trades and several suppliers. Each is reasonable in isolation. The trouble is the gaps between them, which is where delays, overruns and defects are born. A project manager is the person whose job is those gaps.

The role is straightforward to describe and hard to do well. Plan the sequence of work so that trades do not block each other; check each quote against the scope; control the cost as the job moves; inspect the quality of each stage before it is covered up; and keep you informed in plain language. For an owner who lives elsewhere, it is the difference between a project you can follow and one you have to trust blind.

You can have it in two ways. We can manage the job with our own teams, or we can coordinate and supervise trades you have already hired. In both cases one person is responsible for the whole. Fees are a percentage of the cost of the works. For the contractor’s version of the same idea, see turnkey renovation, and for a job being run from abroad, full home renovations.

Spiral underfloor heating circuits laid on the screed, with a step ladder in the background
How it runs

Managing a project, step by step.

It runs for the whole of the works, from the brief to the final handover.

01

Brief and budget

We agree what you want, what it should cost and when you need it.

02

Programme

A sequence of work that keeps trades from blocking each other, with realistic durations.

03

Procurement

Quotes obtained and compared against the scope, so that you are comparing like with like.

04

Control of cost

Variations priced and approved in writing before they are built, and a running total.

05

Control of quality

Each stage inspected before it is covered, with photographs.

06

Reporting

Regular reports in plain language, whether or not you are in Spain.

07

Completion

Snagging, certificates, final accounts and handover.

How we work

How we run a managed project.

01

Brief

We talk through the project. No cost and no obligation.

02

Fixed fee

A fee quoted as a percentage of the works, according to the scope.

03

Management

One person runs the programme, the cost and the quality.

04

Handover

Documents, certificates and final accounts.

Why us

Why use us to manage your project.

One person responsible

Not a committee, and not you.

Works with your trades or ours

We can supervise contractors you have already chosen.

Cost controlled

Variations priced and approved before they are built.

Quality inspected

Each stage checked before it is covered up.

Suited to owners abroad

Reports and photographs so that you can follow the job from elsewhere.

Plain-language reporting

You know where the project is without reading a spreadsheet.

Prices

What project management costs.

Fees as a percentage of the cost of the works, VAT excluded.

What project management costs — Indicative prices · VAT not included
ServiceWhat it coversFee
Coordination of tradesStandard finishes, practical solution5 – 8% of the works
Complete project managementPremium materials and high-end interior designDepends on project
Indicative prices · VAT not included. Management fees are usually a percentage of the cost of the works, typically between 5% and 12% depending on the scope. A well-managed project avoids the overruns, delays and defects that cost far more than the fee.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Full renovation · functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

By service

What it costs by service.

Fees as a percentage of the works, VAT excluded.

CoordinationTrades and programme5 – 8%

We coordinate your trades and control the programme and the quality.

Full managementThe whole project8 – 12%

Planning, procurement, cost control, quality control and certification.

For investorsRemote managementAsk us

Complete management with reports, so that you do not have to be here.

For developersSeveral unitsDepends on project

Management of developments and larger projects.

The fee is for the management, not the works: the contractors’ prices are separate and are obtained, compared and agreed with you. If we are also the contractor, we say so and show the two separately.

No small print

What is included and what is not.

The scope of project management, and what is separate.

✓ Included in the price

  • Brief, budget and programme
  • Obtaining and comparing quotes
  • Coordination of trades and suppliers
  • Control of variations and cost
  • Inspection of quality at each stage
  • Reports in plain language
  • Snagging and handover
  • Final accounts

✕ Not included — quoted separately

  • The cost of the works themselves
  • Architect’s and engineer’s fees
  • Permits and council taxes
  • Furniture and decoration
  • Legal advice
  • Insurance for the works, unless itemised

VAT is shown as its own line — normally 21% on professional fees.

Where we work

Where we manage projects.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners and investors ask about project management.

What is project management and who is it for?

It is putting a professional in charge of your project to control time, cost and quality on your behalf. It suits owners, investors and developers who have a project but not the time or technical knowledge to coordinate and inspect it, and it suits anyone managing a job from another country.

Can you coordinate trades I have already hired?

Yes. We can run the job with our own teams or supervise the contractors you already have. In both cases one person controls the whole and answers for the result.

How much does it cost?

Usually a percentage of the cost of the works: roughly 5 to 8% for coordination and 8 to 12% for full management, excluding VAT, depending on the scope. On a 100,000 € renovation that is about 5,000 to 12,000 €. A well-managed job tends to pay for itself in avoided overruns, delays and defects.

I live abroad. Will I know what is going on?

Yes, that is much of the point. You receive regular reports in plain language, with photographs of each stage and a running cost, and decisions are made by email or video call and confirmed in writing.

What if you are also doing the building work?

Then we say so, and show the management fee and the contractor’s price separately, so that you can see what you are paying for each.

Free quote

Talk to us about your project.

Free discussion of your brief, anywhere in Catalonia, including from abroad.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →