A gym needs technical building work: floors that absorb impact, a slab that carries the weight of the machines, powerful ventilation and cooling, proper changing rooms, and sound insulation so you do not fall out with your neighbours.
A gym is a building problem disguised as a lifestyle brand. Three things decide whether it works. The floor: it has to absorb impact, carry the load of racks and machines, and take dropped weights. The air: a room full of people exercising generates heat and humidity that ordinary air conditioning cannot clear. And the noise: dropped weights and music travel through the structure into the flats around you.
The first question for any unit is the slab. Machines and a free-weights area concentrate dead load, and on an upper floor or a lightweight slab that may need calculating and strengthening. Then the services: ventilation and cooling sized for the number of people at peak, and changing rooms with showers that have the hot water and drainage to match.
Acoustics are where most gyms fall out with their neighbours, particularly in a building with homes above. We design a floating floor and insulated ceiling and party walls before the equipment goes in. For the general process of fitting out a unit, see commercial units; for the licence side, permits and drawings.

Typically six to fourteen weeks. The activity licence runs in parallel.
We assess the slab and the loads you intend to place on it, the ceiling heights and the position of the neighbours.
A registered technician drafts the activity project and we file it with the council.
Previous fit-out out, and strengthening where the machines and free weights need it.
A floating floor and insulated ceiling and party walls, built before the equipment is placed.
Ventilation and cooling for peak occupancy, electrics, and hot water and drainage for the showers.
Technical flooring suited to each zone, changing rooms, reception and wall finishes.
Final certificates, technician’s sign-off and handover.
We visit, check the slab and listen to your concept. No cost and no obligation.
A fixed itemised quote, with the activity project shown separately.
One site manager coordinates every trade against a written programme.
Certificates and the documents to open lawfully.
We establish whether the floor can carry your equipment before you commit to the unit.
The floating floor and insulation are planned from the start, so your neighbours do not become your licence problem.
Sized for peak numbers exercising, not for people sitting in an office.
Resilient flooring for weights, a different surface for classes, a different one for the cardio area.
Hot water, drainage and finishes that cope with heavy daily use.
Every trade coordinated by one person.
Per square metre of floor area, VAT excluded. Equipment is separate.
| Specification | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| Basic fit-out | Standard finishes, practical solution | 350 – 600 €/m² | |
| Mid-range | Selected materials, best balance | 600 – 1,000 €/m² | |
| High-end / boutique | Premium materials and high-end interior design | 1,000 – 1,700 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT and equipment excluded.
Training studios and boutique class rooms. Flooring, cooling and soundproofing set the minimum.
The most common size, with a machine area, class rooms and changing rooms.
Large centres with a pool, spa or several rooms. Larger installations.
Strengthening where dead weight and machines accumulate, priced from a calculation.
The cost that surprises first-time gym owners is not the finishes. It is the structure and the acoustics — whether the slab will take the weight, and whether the neighbours will take the noise. We settle both before you commit to a unit.
The scope of a turnkey gym fit-out, and what is separate.
VAT is shown as its own line — normally 21% on works for a business.
A gym draws on most of this list, coordinated by one person.
Gyms and fitness studios in Barcelona and across Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What gym owners ask.
It depends on the slab, and it is the first thing to check. A ground-floor slab on earth is usually fine. An upper floor or a lightweight slab may not be, and a concentrated free-weights area or heavy machines can exceed what it was designed for. A structural engineer calculates it, and if it needs strengthening we price that separately before you commit to the unit.
By building the acoustic work properly: a floating floor with a resilient layer under the weights area, insulated ceilings and party walls, and music kept within the licence. Dropped weights are the hardest noise to contain because they travel through the structure, so the floor is the most important element. A gym below flats is the highest-risk configuration, and we say so plainly at the survey.
More than one kind. Resilient rubber for free weights, a sprung surface for classes, a harder wearing finish for circulation, and an easy-clean, slip-resistant one for changing rooms. Using the same surface everywhere is cheaper at first and wrong in at least two zones.
Roughly 350 to 600 €/m² for a basic fit-out, 600 to 1,000 €/m² for mid-range and 1,000 to 1,700 €/m² for a boutique scheme, excluding VAT and equipment. A 250 m² gym at mid-range comes to around 150,000 to 250,000 € for the works.
Six to fourteen weeks of building, with the activity licence in parallel.
In stages tied to completed work: a deposit on signing, payments at the end of each phase, and a final payment at handover. Never the full amount in advance.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia, including a check of the slab before you sign the lease.