Joinery · Catalonia

Joinery and carpentry in Catalonia

Doors, wardrobes, wood flooring and made-to-measure furniture that make the most of every corner. Joinery is what gives a home warmth and the bespoke finish that tells a well-built home from an ordinary one.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Joinery and carpentry

The part of a renovation you touch every day.

You open a door or a drawer dozens of times a day, and the quality of that moment is joinery. Doors that close with weight, drawers that run smoothly, skirting that meets the floor without gaps are what make a renovated home feel properly done, and they are invisible when they are right.

The work falls into four groups. Doors: internal, sliding and front doors, supplied, hung and adjusted. Flooring: floating timber, parquet and solid boards. Fitted storage: wardrobes and dressing rooms. And bespoke furniture: bookcases, TV units, vanity units and living-room pieces, made to the room.

The material decides price and behaviour. Melamine-faced board is economical and practical; veneered board looks like timber for less money; solid wood is the most durable and repairable. Which one is right depends on where it goes: a bathroom vanity and a living-room bookcase want different things. See fitted wardrobes, flooring and full home renovations.

White lacquered wardrobe front, floor to ceiling and without handles, with drawers below, next to a white interior door; on the right hangs a black-painted window sash
How it runs

A joinery job, step by step.

From a day to fit doors to several weeks for bespoke pieces.

01

Survey and brief

We measure, look at the walls and floors, and agree the design and the materials.

02

Design

Drawings of any bespoke pieces, and a finish schedule.

03

Manufacture

Made to measure in the workshop.

04

Doors

Frames, doors and ironmongery fitted and adjusted.

05

Flooring

Timber flooring laid on a prepared base, with skirting.

06

Fitted pieces

Wardrobes, units and furniture fitted and scribed to the walls.

07

Handover

Everything adjusted and checked with you.

How we work

How we run a joinery job.

01

Free survey

We measure and discuss materials. No cost and no obligation.

02

Design and fixed quote

A price per piece or per metre, itemised.

03

Making and fitting

Made to measure and fitted by experienced joiners.

04

Handover

Warranty on the joinery.

Why us

Why use us for joinery.

Made to your room

Bespoke pieces fit; standard ones almost fit.

Honest about materials

We say when solid wood is worth it and when veneer is fine.

Doors that close well

Hung and adjusted properly, with good ironmongery.

Flooring laid on a prepared base

The base decides whether a timber floor creaks.

Fitted properly

Doors hung, units scribed to the walls and everything adjusted before we leave.

Warranty

On the joinery and the fitting.

Prices

What joinery costs.

Supplied and fitted, VAT excluded.

What joinery costs — Indicative prices · VAT not included
ItemWhat it coversIndicative range
Internal door, fittedStandard finishes, practical solution180 – 500 €
Timber flooringPremium materials and high-end interior design30 – 90 €/m²
Indicative prices · VAT not included. Bespoke joinery is priced by the piece or the linear metre according to material (melamine, veneer, solid wood) and finish. A fitted wardrobe starts at around 400 €/m; a fitted door from 180 €. We itemise everything.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate2,400 – 7,200 €Timber flooring · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

By item

What it costs by item.

Indicative ranges, VAT excluded.

DoorsInternal and entrance180 – 900 €

Internal, sliding and entrance doors, fitted and adjusted.

Wardrobes and dressing roomsMade to measureFrom 400 €/m

Fitted wardrobes and dressing rooms that use every recess.

Timber flooringPer m² of floor30 – 90 €/m²

Floating floor, parquet or solid boards, laid and finished.

Bespoke furnitureLiving, bathroomAsk us

Bookcases, TV units, vanity units and living-room furniture made to measure.

The cost of timber flooring depends heavily on the base: a level, dry screed costs little to lay on; an uneven or damp one needs levelling or treatment first. We check before we quote.

No small print

What is included and what is not.

The scope of a joinery job, and what is separate.

✓ Included in the price

  • Survey and measurement
  • Design drawings for bespoke pieces
  • Manufacture to measure
  • Fitting by experienced joiners
  • Ironmongery and fittings
  • Adjustment and finishing
  • A written warranty

✕ Not included — quoted separately

  • Painting or varnishing of surrounding walls
  • Preparation of an unsound floor base
  • Removal of old doors or flooring, unless itemised
  • Appliances built into units
  • Council taxes and fees
  • Works needing the owners’ association’s consent

VAT is shown as its own line — 10% or 21% depending on your case.

Where we work

Where we do joinery.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about joinery.

Do you make bespoke furniture and wardrobes?

Yes. Wardrobes, dressing rooms, bookcases, TV units, vanity units and living-room furniture are made to measure and fitted by experienced joiners. See fitted wardrobes for the most common job.

Which material is best for a wardrobe or unit?

It depends on where it goes. Melamine-faced board is economical, practical and fine for most wardrobes. Veneered board gives the look of timber for less. Solid wood is the most durable and repairable but costs the most and moves with humidity. For a bathroom, moisture-resistant board is essential.

Do you lay timber and engineered floors?

Yes. Floating floors, parquet and solid boards, laid on a prepared base with skirting. The base decides whether the floor creaks or lifts, so we check it for flatness and moisture before we quote. See flooring.

How much does a made-to-measure wardrobe cost?

From about 400 €/m, excluding VAT, depending on the material, the doors and the interior. A fitted internal door starts around 180 €.

How long does it take?

A day or two to fit doors; two to five weeks for bespoke pieces including manufacture.

Free quote

Get a quote for joinery.

Free survey anywhere in Catalonia. Drawings and a fixed price for bespoke pieces.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →