Hospitality · Barcelona + Catalonia

Café renovations in Catalonia

A café lives on atmosphere and turnover: a space people want to stay in, a coffee bar that works quickly, and details such as light, sockets and wifi that bring them back. And all of it finished fast enough that you can start serving.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Café renovation

A room people want to stay in.

A café has to do two opposing things at once: be somewhere people want to linger, and move customers through fast enough to pay the rent. The design that achieves both is mostly about the coffee bar, the lighting and the seating, and rather less about finishes than the clients tend to expect.

The practical points matter more than they look. Sockets and wifi at tables, because half your customers have a laptop. A coffee bar laid out for the barista’s movement, not for the photograph. Ventilation that clears the smell of the grinder and the kitchen. And, if you plan to cook, the same extraction question that applies to any food venue.

A café generally costs somewhat less to fit out than a restaurant because the kitchen load is lighter, and the speed of the programme matters because rent starts before you do. We plan the licence and the build in parallel. If the venue is kitchen-led, see restaurants; for a unit that is not hospitality, commercial unit fit-out.

Plasterboard arch and curved counter under construction, with an LED strip in the ceiling and material boxes on the worktop
How it runs

Renovating a café, step by step.

Four to ten weeks of building. The licence runs in parallel.

01

Survey and brief

We look at the unit, the footfall and your concept, and check the extraction question if you plan to cook.

02

Activity project and licence

A registered technician drafts the activity project and we file it with the council.

03

Strip-out and services

Previous fit-out out, then electrics, plumbing, drainage, ventilation and air conditioning.

04

Coffee bar and back of house

The coffee bar laid out for the barista’s movement, with a small prep area and storage.

05

Seating, lighting and finishes

Floors, walls, seating and layered lighting, with power and data at tables.

06

Toilets and accessibility

Accessible toilets and entrance, where required.

07

Inspection and handover

Final certificates and technician’s sign-off, then handover on the agreed date.

How we work

How we run a café project.

01

Free survey

We visit and talk through your concept. No cost and no obligation.

02

Fixed quote, separate project

A fixed itemised quote, with the activity project shown separately.

03

Build to a written date

One site manager coordinates the trades against a short written programme.

04

Handover with the paperwork

Certificates and the documents you need to open lawfully.

Why us

Why use us for your café.

Atmosphere that earns its keep

Materials, light and furniture chosen to make people stay, without costing the earth.

A coffee bar built for service

Laid out around the barista, so queues move.

Power and wifi where customers sit

Sockets at tables and a proper network, which cost little now and a lot later.

Short programmes

A café can be done quickly, and we commit to a written date.

Compliance sorted early

Activity licence, accessibility and ventilation planned before the finishes.

One site manager

Every trade coordinated by one person.

Prices

What a café renovation costs.

Per square metre of floor area, VAT excluded. Equipment is separate.

What a café renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
Basic fit-outStandard finishes, practical solution450 – 750 €/m²
Designer / conceptPremium materials and high-end interior design1,200 – 1,900 €/m²
Indicative prices · VAT not included. A café usually costs somewhat less than a restaurant because the kitchen load is smaller. What adds the most value is the atmosphere — materials, light, furniture — plus the coffee bar and, if you cook, extraction. Everything is itemised, with the activity project shown separately.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate36,000 – 60,000 €Basic fit-out · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of café.

Indicative ranges for the building works, VAT and equipment excluded.

Small caféUp to 50 m²25,000 – 70,000 €

Neighbourhood cafés and take-away. The coffee bar and the atmosphere do the work.

Medium café50 – 120 m²55,000 – 150,000 €

The most common size, with a bar, a seating area and a small prep room.

Large café / brunchOver 120 m²From 130,000 €

Large venues with a kitchen for brunch. Extraction and air conditioning on a larger scale.

Activity projectTechnical procedureFrom 1,500 €

The project and supervision for the licence, quoted separately.

The decision that moves a café’s cost most is whether you will cook. A café that serves coffee and pastries is a light fit-out; one that serves brunch from a hot kitchen is a restaurant for extraction and licensing purposes, and we tell you which side of the line your concept is on.

No small print

What is included and what is not.

The scope of a turnkey café fit-out, and what is separate.

✓ Included in the price

  • Survey and brief
  • Strip-out and clearance
  • Electrics and lighting, with certificate
  • Plumbing, drainage and ventilation
  • Air conditioning
  • Coffee bar and prep area
  • Power and data at tables
  • Accessible toilets
  • Floors, walls, seating and finishes
  • Final certificates and a written warranty

✕ Not included — quoted separately

  • Activity project, supervision and licence fees, quoted separately
  • Coffee machines, grinders and other equipment
  • Furniture, crockery and decoration, unless itemised
  • Extraction, unless you cook and it is itemised
  • Council taxes and fees
  • Landlord’s works and approvals

VAT is shown as its own line — normally 21% on works for a business.

Where we work

Where we renovate cafés.

Cafés in Barcelona and across Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What café owners ask before fitting out.

Do I need fume extraction for a café?

Only if you cook. A café that serves coffee, pastries and cold food needs good ventilation but not full extraction. One that serves hot food from a kitchen needs a route for fumes to the roof, which in an existing building can be the hardest item, and it moves the venue towards restaurant-level licensing. We establish which you are at the survey. See restaurants.

How do I make a café feel cosy?

With light more than with decoration. Warm layered lighting at different heights, a mix of seating types, materials with some texture — timber, plaster, tile — and acoustics that keep the room from getting loud. A café that is a little dim and sounds soft in the evening gets stayed in. We design the lighting before the finishes.

How much does a café renovation cost?

Roughly 450 to 750 €/m² for a basic fit-out, 750 to 1,200 €/m² for mid-range and 1,200 to 1,900 €/m² for a concept café, excluding VAT and equipment. A 70 m² café at mid-range comes to around 52,500 to 84,000 € for the works.

Will you provide sockets and wifi for customers with laptops?

Yes, and it is worth specifying properly. Power outlets at tables and walls, plus a business-grade wifi network with access points sized for the room, cost little at the fit-out stage and a lot to add later. Many cafés now depend on customers working from them for part of the day.

How long does it take?

Four to ten weeks of building, with the activity licence in parallel. We commit to a written date and tell you if the licence looks likely to be the constraint.

How is it paid for?

In stages tied to completed work: a deposit on signing, payments at the end of each phase, and a final payment at handover. Never the full amount in advance.

Can you look at a unit before I take the lease?

Yes, and it is free. For a café the things that matter — footfall, the extraction question, the services and the neighbours — decide whether the concept works. Ask for a survey.

Free quote

Get a quote for your café.

Free survey, including before you sign the lease. A fixed quote and a written opening date.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →