Healthcare · Catalonia

Clinic and medical practice renovations in Catalonia

A clinic has to be renovated to satisfy the health authority: hygiene, easy-to-clean materials, specialist services and accessibility to obtain its authorisation — and to look like somewhere a patient trusts.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Clinic renovation

Built for hygiene, designed for trust.

A clinic is judged twice: by the health authority, which decides whether you can operate, and by the patient, who decides within thirty seconds whether to trust you. Both are influenced by the building. The authority cares about hygiene, finishes that can be cleaned and disinfected, specialist services and accessibility. The patient cares about whether the waiting room feels calm and the treatment room feels clean.

The surfaces matter more than people expect. Seamless, coved flooring, wipeable walls, no joints where dirt collects, and sinks and taps that meet the specialty’s requirements. Behind them sit the services that depend on the specialty: medical gases, radiation protection for X-ray rooms, dental surgeries, and the ventilation and air quality that go with them.

The route to opening runs through a health authorisation, which is applied for with a technical project and inspected. The building work has to match it. We coordinate registered technicians for the project, build to it, and hand over with the certificates the inspection asks for. For the pharmacy next door, see pharmacies; for the general process, commercial unit fit-out.

Entrance hall with a timber sliding door, backlit niche, pendant lamp and a basket of dried flowers on the floor, in a renovated podiatry clinic
How it runs

Renovating a clinic, step by step.

Typically eight to sixteen weeks, depending on the specialty. The health authorisation runs in parallel and often sets the opening date.

01

Survey and brief

We establish the specialty, the rooms you need and the services each depends on, and assess what the premises can support.

02

Health project and authorisation

A registered technician drafts the technical project for the health authorisation, and we help file it.

03

Strip-out and structure

Previous fit-out out, services located, and any structural work for specialist rooms.

04

Specialist services

Medical gases, radiation protection, dental services, electrics with certification and ventilation, as your specialty needs.

05

Hygienic finishes

Seamless flooring, wipeable walls and ceilings, and sinks and taps to the specialty’s requirements.

06

Reception, waiting and treatment rooms

The rooms and their finish and lighting, with accessible routes throughout.

07

Inspection and handover

Certificates, inspection and handover.

How we work

How we run a clinic project.

01

Free survey

We visit and talk through your specialty and your patients. No cost and no obligation.

02

Fixed quote, separate project

A fixed itemised quote, with the health project shown separately.

03

Build to a written date

One site manager coordinates every trade, including the specialist installers.

04

Handover with the paperwork

Certificates and documents for the authorisation.

Why us

Why use us for a clinic.

Built to the authorisation

The finishes and services are specified to what the health authority will inspect.

Hygiene by design

Seamless, cleanable surfaces and detailing that leaves nowhere for dirt to collect.

Specialist installations coordinated

Medical gases, radiation protection and dental services handled by the right specialists under one site manager.

Accessible throughout

Routes, doors and toilets to the current standard.

A calm, trustworthy image

Lighting and materials that make the practice feel professional.

Honest about timing

We tell you when the authorisation, not the build, is the constraint.

Prices

What a clinic renovation costs.

Per square metre of floor area, VAT excluded. Specialist equipment is separate.

What a clinic renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
Consulting roomsStandard finishes, practical solution600 – 900 €/m²
Highly specialisedPremium materials and high-end interior design1,400 – 2,500 €/m²
Indicative prices · VAT not included. The price is set by the specialist services for your specialty — medical gases, radiation protection, treatment rooms — and by the sanitary finishes. A basic consulting room is modest; an operating theatre or an X-ray room costs a great deal more. Everything is itemised, with the health project shown separately.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate48,000 – 72,000 €Consulting rooms · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of clinic.

Indicative ranges, VAT and equipment excluded.

Consulting roomUp to 60 m²From 40,000 €

Individual or small practices. Hygiene and accessibility set the minimum.

Mid-size clinic60 – 150 m²From 90,000 €

Several treatment rooms, a waiting area and sterilisation. The most common size.

Large clinicOver 150 m²Bespoke

Polyclinics and centres with larger installations.

Specialist servicesGases · X-ray · dentalAsk us

Medical gases, radiation protection or dental surgeries, priced by specialty.

Specialist equipment — chairs, imaging, sterilisers — is bought from its own suppliers, who also dictate the services it needs. We coordinate with them early, because a unit that arrives needing a different connection from the one built is a costly mistake.

No small print

What is included and what is not.

The scope of a turnkey clinic fit-out, and what is separate.

✓ Included in the price

  • Survey and brief
  • Strip-out and clearance
  • Electrics with certificate
  • Ventilation and air conditioning
  • Plumbing, drainage and clinical sinks
  • Seamless flooring and wipeable surfaces
  • Accessible routes and toilets
  • Reception, waiting and treatment rooms
  • Final certificates and a written warranty

✕ Not included — quoted separately

  • Health project, authorisation and licence fees
  • Medical gases, radiation protection and dental services, unless itemised
  • Medical and dental equipment
  • Furniture and decoration, unless itemised
  • Council taxes and fees
  • Landlord’s works and approvals

VAT is shown as its own line — healthcare premises are normally 21% on works, and we confirm in writing.

Where we work

Where we renovate clinics.

Clinics in Barcelona and across Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What clinic owners ask.

What do I need to get health authorisation?

A technical project that shows the premises meet the requirements for your specialty, an inspection, and a building that matches the project. The requirements depend on what you do: a consulting room is far lighter than a surgery. We coordinate registered technicians for the project and build to it. The authorisation process is outside our control, so we plan the programme around it and tell you when it is the constraint.

Can you install dental surgeries or an X-ray room?

Yes, with the right specialists. Dental surgeries need compressed air, suction, drainage and equipment-specific connections. An X-ray room needs radiation protection designed by a qualified person, with shielding in the walls and door. We coordinate the specialists and the equipment suppliers so that what is built matches what is delivered.

What finishes are required in a clinic?

Seamless, coved flooring with no joints where dirt collects, walls and ceilings that can be wiped and disinfected, and sinks and taps suited to the specialty. The detail matters more than the material: junctions, corners and penetrations are where hygiene fails.

How much does a clinic renovation cost?

Roughly 600 to 900 €/m² for consulting rooms, 900 to 1,400 €/m² for a mid-size clinic and 1,400 to 2,500 €/m² for a highly specialised one, excluding VAT and equipment. A 100 m² clinic at mid-size comes to around 90,000 to 140,000 € for the works.

How long does it take?

Eight to sixteen weeks of building, depending on the specialty. The authorisation runs in parallel and often sets the opening date.

How is it paid for?

In stages tied to completed work: a deposit on signing, payments at the end of each phase, and a final payment at handover. Never the full amount in advance.

Free quote

Get a quote for your clinic.

Free survey anywhere in Catalonia. Built to the health authorisation.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →