Building envelope · Catalonia

Roof renovations and re-roofing in Catalonia

The roof protects everything beneath it. When it fails, leaks and cold are unforgiving. We rebuild the roof — tiles, waterproofing, insulation and structure — so that water stays out and heat stays in.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Roof renovation

Do the roof once, and do it properly.

A roof is a system, not a layer of tiles. Under the tiles are the waterproofing, the insulation, the battens and the structure — in an old Catalan house, timber rafters that have often been carrying the load for a century. The tiles are the part you see. The part that decides whether it leaks is underneath them.

So the first question is whether to repair or to rebuild. A few cracked tiles and a failed flashing is a repair. A roof with sagging rafters, rotted battens and a patchwork of previous fixes is a rebuild, and economising on it means paying for scaffolding twice. Where the roof is being rebuilt, insulating at the same time is the cheapest it will ever be, and it is the biggest single improvement to a house’s comfort and energy bill.

One special case is the roof made of fibre-cement sheets, common on older buildings and units. Much of it contains asbestos and has to be removed by an authorised company under an approved plan, as a separate line. For repairs and maintenance, see roof repairs; for a flat roof, rooftops; for a masia, masia restoration.

Work-in-progress room with the floor slab removed and new steel joists in place, a builder’s bucket and unplastered walls
How it runs

Renovating a roof, step by step.

Two to six weeks for a house. Roofing depends on dry weather.

01

Survey and diagnosis

We go up and examine the tiles, the flashings, the battens and, from below, the timbers, to decide between repair and rebuild.

02

Scaffolding and protection

Safe access and protection for the building and the street.

03

Strip-off

Tiles and battens removed, and any asbestos handled by an authorised company first.

04

Structure

Rafters and timbers repaired or replaced where they have failed.

05

Waterproofing and insulation

A waterproof underlay and insulation laid before the tiles.

06

Tiling and details

New or reclaimed tiles laid, with flashings, ridges, valleys and gutters.

07

Handover

The roof tested, scaffolding removed, warranty handed over.

How we work

How we run a roof project.

01

Free survey

We go up, photograph what we find and tell you whether to repair or rebuild. No cost and no obligation.

02

Fixed quote

An itemised quote, with the structure and any asbestos priced separately.

03

Build, with one site manager

One person runs the job and watches the weather.

04

Handover and warranty

A warranty on the roof.

Why us

Why re-roof with us.

Honest about repair or rebuild

We tell you when a repair is enough and when it is money wasted.

Photographs of what we find

You see the condition of your roof before you decide.

Insulation while it is open

The cheapest time to insulate, and the biggest comfort gain.

Asbestos handled lawfully

Authorised removal, an approved plan and managed waste, as a separate line.

Safe working at height

Scaffolding and protection for the crew, the residents and the street.

Warranty on the roof

The waterproofing and the tiling carry a warranty.

Prices

What a roof renovation costs.

Per square metre of roof, VAT excluded.

What a roof renovation costs — Indicative prices · VAT not included
ScopeWhat it coversPer m² (excl. VAT)
Local repairStandard finishes, practical solution40 – 90 €/m²
With insulation and structurePremium materials and high-end interior design150 – 280 €/m²
Indicative prices · VAT not included. The price depends on the condition of the structure, the tile chosen and whether it is insulated. Rebuilding with insulation costs more at the start and saves energy and a second visit with the scaffolding. Asbestos removal, if present, is a separate line.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate3,200 – 7,200 €Local repair · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of roof.

Indicative ranges, VAT excluded.

Small roofUp to 80 m²5,000 – 15,000 €

Small houses and detached houses. Repair or renewal of the covering.

Medium roof80 – 200 m²12,000 – 40,000 €

The most common case, with waterproofing, insulation and new tiles.

Large roofOver 200 m²From 35,000 €

Large roofs on masies and buildings, often with timber structures.

Asbestos removalFibre-cementFrom 25 €/m²

Removal by an authorised company under an approved plan, with waste management. Quoted separately.

If the roof contains asbestos, do not drill, cut, walk on or pressure-wash it before it has been surveyed. The first step is an approved removal plan, and it comes before everything else.

No small print

What is included and what is not.

The scope of a re-roofing, and what is separate.

✓ Included in the price

  • Survey and written condition report
  • Scaffolding and protection
  • Stripping of tiles and battens
  • Repair of rafters and timbers
  • Waterproof underlay
  • Insulation, where chosen
  • New or reclaimed tiles with flashings, ridges and valleys
  • Gutters and downpipes
  • A written warranty

✕ Not included — quoted separately

  • Asbestos removal, quoted separately
  • Major structural replacement not foreseen at the survey
  • Solar panels, unless itemised
  • Council taxes and fees
  • Works to the façade or chimneys, unless itemised
  • Works needing the owners’ association’s consent

VAT is shown as its own line — 10% or 21% depending on your case, and the reduced rate can apply to energy-efficiency work in a home.

Where we work

Where we re-roof.

Roofs across Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about roofs.

I have a leak. Do I repair or re-roof?

It depends on the condition of the whole roof, and the honest answer comes from looking at it. A single cracked tile or failed flashing is a repair. A roof with sagging rafters, rotten battens and a history of patching is not, and repairing it again is money thrown away. We photograph what we find so that you can see.

Is it worth insulating when I re-roof?

Yes, almost always. With the roof open the insulation is cheap to add, and it is the biggest single improvement to the comfort and energy use of a house: a cool upper floor in summer and a warm one in winter. It can also qualify for energy-efficiency support. Adding it later means taking the roof apart again.

My roof is fibre-cement. What does that mean?

It very probably contains asbestos. It is not an immediate hazard if intact, but it cannot be drilled, cut or demolished by an ordinary builder: removal must be done by an authorised company working to an approved plan. We survey it, quote the removal as a separate line and coordinate the authorised firm. See industrial units for a common case.

How much does it cost?

Roughly 40 to 90 €/m² for a local repair, 97 to 222 €/m² for a complete roof and 150 to 280 €/m² with insulation and structure, excluding VAT. A 120 m² roof rebuilt with insulation comes to around 18,000 to 33,600 €.

How long does it take?

Two to six weeks for a house, depending on the size and on the weather. We cannot lay a roof in the rain.

How is it paid for?

In stages tied to completed work: a deposit on signing, payments at the end of each phase and a final payment at handover.

Free quote

Get a survey of your roof.

Free survey with photographs anywhere in Catalonia. An honest view on repair or rebuild.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →