Finishes · Barcelona + Catalonia

Painting and decorating in Barcelona and Catalonia

A good coat of paint transforms a home in a weekend. We paint interiors and exteriors with clean finishes, protecting your furniture and floors, and we also smooth walls and remove textured plaster.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Painting and decorating

The preparation is the paint job.

Everybody knows that the quality of a paint job depends on the preparation, and almost nobody prices it that way. Cheap painting is paint on an unprepared wall: it shows every crack, the old texture and the previous patches, and it peels in two years. Good painting is mostly filling, sanding, priming and masking, with the paint itself the quick part.

That is why the price depends less on the number of coats than on the starting condition of the walls. Painting a wall in good condition is inexpensive. What raises the cost is the work beforehand: skimming rough walls, removing textured plaster, repairing cracks and dealing with damp. See wall skimming for the first two.

A few practical points. Paint cannot fix a damp wall, and painting over one traps the moisture and blisters. Finish matters: matt hides imperfections but marks easily, satin is washable and suits corridors and kids’ rooms, and a moisture-resistant paint belongs in bathrooms. And furniture and floors are protected before a brush is lifted, which is a sign of a professional. For a damp problem, see damp treatment.

Bedroom with walls painted lime green, a spotlight track on the ceiling, a chest of drawers with cables on top and a radiator, with part of the bed on the right
How it runs

A painting job, step by step.

A room in a day or two; a whole flat in four to ten days.

01

Survey and colour

We check the walls and agree colours and finishes, with sample patches if you want them.

02

Protection

Floors, furniture, windows and fittings covered before work starts.

03

Preparation

Cracks filled, rough areas sanded, stains sealed and damp problems flagged.

04

Priming

Primer where needed, so the paint holds evenly.

05

Paint

Two coats, cut in cleanly at the edges.

06

Details

Doors, skirting and radiators finished.

07

Clean-up

Protection removed and the rooms cleaned.

How we work

How we run a painting job.

01

Free survey

We look at the walls and colours. No cost and no obligation.

02

Fixed quote

A price per square metre or per room, with the preparation itemised.

03

The work

Done tidily, room by room, so you can keep living there.

04

Handover

Checked with you, with touch-ups included.

Why us

Why use us for painting.

Preparation priced honestly

You see what is paint and what is preparation.

Protection as standard

Your furniture and floors are covered before we start.

Clean lines

Edges cut in properly, which is what shows.

Right paint for the room

Matt, satin or moisture-resistant according to use.

Damp flagged, not painted over

We tell you if a wall needs treating first.

Skimming and painting together

One team, one visit.

Prices

What painting costs.

Per square metre of wall and ceiling, VAT excluded.

What painting costs — Indicative prices · VAT not included
WorkWhat it coversPer m² (excl. VAT)
Paint (smooth walls)Standard finishes, practical solution6 – 12 €/m²
Remove texture and paintPremium materials and high-end interior design15 – 28 €/m²
Indicative prices · VAT not included. Painting a wall in good condition is inexpensive; what raises the price is the work beforehand — skimming, removing texture, repairing damp. It is priced per square metre or per room, with preparation itemised so you can see where the money goes.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate500 – 1,000 €Paint (smooth walls) · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of job.

Indicative ranges, VAT excluded.

One roomBedroom or living room150 – 500 €

Painting a room, with protection and preparation.

Average flat70 – 90 m²900 – 2,500 €

Painting a whole flat, walls and ceilings. It costs more if skimming or de-texturing is added.

Large homeHouse or large flatFrom 2,200 €

More area and, often, more joinery and detail.

Façade / exteriorWith scaffoldingAsk us

Façades, courtyards and exteriors, with access equipment extra.

A new coat on a damp wall will blister within a season. If we see a moisture problem, we say so and quote for dealing with it first, rather than painting over it.

No small print

What is included and what is not.

The scope of a painting job, and what is separate.

✓ Included in the price

  • Survey and colour advice
  • Protection of floors and furniture
  • Filling and sanding
  • Primer where needed
  • Two coats of paint
  • Painting of doors, skirting and radiators, where itemised
  • Cleaning
  • A written warranty

✕ Not included — quoted separately

  • Skimming and removal of texture, unless itemised
  • Damp treatment
  • Moving furniture out of the rooms
  • Scaffolding for exteriors
  • Council taxes and fees
  • Works needing the owners’ association’s consent

VAT is shown as its own line — 10% or 21% depending on your case.

Where we work

Where we paint.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about painting.

How much does it cost to paint a flat?

Roughly 900 to 2,500 € for an average 70 to 90 m² flat, walls and ceilings, excluding VAT, if the walls are in good condition. Skimming or removing textured plaster raises it. Per square metre it is about 6 to 12 € for smooth walls and 15 to 28 € including removing texture.

Can you remove the textured plaster (gotelé)?

Yes, and we recommend doing it before painting rather than painting over it. See wall skimming.

Do I need to empty the house?

No. We move furniture to the middle of each room and cover it, and work room by room. For a whole flat it is easier if the rooms are mostly clear, but living there is possible.

Can I just paint over damp?

No. Paint over a damp wall traps the moisture and blisters, and it does not fix the cause. If you have damp, deal with the source first. See damp treatment.

Which paint is best?

It depends on the room. Matt hides imperfections but marks easily; satin is more washable and suits corridors and children’s rooms; a moisture-resistant paint belongs in bathrooms and kitchens. We recommend by room rather than selling one product for everything.

Free quote

Get a quote for painting.

Free survey anywhere in Catalonia. Preparation itemised, protection as standard.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →