Safe, legal gas installations: new installations, alterations, boiler replacement and inspections, by authorised installers, with the certificate the gas company requires. Safety comes first.
Gas work is the one area of building where the law says only an authorised installer may touch it. That is not bureaucracy. A badly made gas joint or a boiler with a poor flue can leak or poison, and the consequences are not repairable. Everything on this page is done by authorised installers, with approved materials, and ends with the certificate that proves the installation is legal.
The certificate matters in practice too. The gas company requires it to connect or reconnect a supply, an insurer may ask for it after a claim, and a buyer’s surveyor will look for it. An installation without one is, in effect, an installation you cannot rely on.
The commonest job is replacing a boiler. Condensing boilers are far more efficient than the units they replace. If you are renovating, it is also the moment to ask whether to move to a heat pump instead, which removes combustion from the home altogether. We lay out both honestly. See heating and heat pumps.

A day for a boiler replacement; a few days for a new installation.
We check the existing installation, the flue and ventilation, and what you want to connect.
Pipework routes, pipe sizes and flue are specified to the regulations.
Pipework, valves and appliances installed by an authorised installer.
A compliant flue and ventilation, which is where unsafe installations go wrong.
Tightness testing and commissioning.
The certificate issued and registered where required.
We look at what you have. Free for larger jobs.
A fixed price, with the certificate included.
Carried out by an authorised installer.
Issued on completion.
It is the law and the whole point.
Not an extra, and not an afterthought.
Where the real dangers are.
Boiler or heat pump, according to your home.
Tightness tested and commissioned.
On the work.
Indicative ranges, VAT excluded.
| Work | What it covers | Indicative range (€) | |
|---|---|---|---|
| Inspection / certificate | Standard finishes, practical solution | 80 – 200 € | |
| Boiler replacement | Selected materials, best balance | 1,500 – 3,500 € | |
| New installation | Premium materials and high-end interior design | From 500 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Periodic inspection and certificate of the gas installation.
Internal installation with connections for the hob, boiler and water heater.
Replacing a boiler or water heater, with the flue.
Altering or extending an existing installation.
A new connection from the street main involves the gas distributor, which has its own fees and timescales. We coordinate it, but the schedule and charges are theirs.
The scope of a gas job, and what is separate.
VAT is shown as its own line — 10% or 21% depending on your case.
Gas connects heating, kitchens and bathrooms.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about gas.
No. By law, and for safety, gas installations may only be made by authorised installers, with approved materials, who issue the corresponding certificate. That certificate is what proves the installation is safe and legal, and it is what the gas company requires. Do not let anyone without the authorisation touch a gas pipe.
An individual natural gas installation has a mandatory periodic inspection, carried out by the distributor, every five years, and it is sensible to have the boiler serviced every year. We carry out inspections and issue the certificate where required.
It depends. If the boiler is at the end of its life, a heat pump is often worth considering, particularly if you are renovating, because it is more efficient and removes combustion from the home. If you would rather keep gas, a condensing boiler is a good replacement. We set both out honestly for your case.
Roughly 1,500 to 3,500 € including the appliance, excluding VAT, depending on the boiler and the flue. The installation certificate is included.
Yes. The authorised installer issues the certificate on completion and registers it where required. It is part of the price.
Small jobs on completion; larger work in stages tied to completed work.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Authorised installers, certificate included, anywhere in Catalonia.