Outdoors · Catalonia

Garden renovations in Catalonia

A good garden is another room outdoors: seating areas, lawn or gravel, an irrigation system that looks after itself, lighting for the evening, and planting designed for a Mediterranean climate that asks for little water.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Garden renovation

Designed for the climate you actually have.

A garden in Catalonia has to deal with long dry summers, occasional heavy rain and a legal and practical interest in saving water. A garden designed for the English weather — thirsty lawn, borders needing constant watering — struggles here. A garden designed for Mediterranean conditions — drought-tolerant planting, gravels, well-chosen shade and smart irrigation — stays good-looking with a fraction of the maintenance.

The cost sits in three places: the hard landscaping (paving, steps, walls), the irrigation, and the lighting. Planting is the cheapest part and the most visible. Getting the hard landscaping and the services right first is what lets the planting thrive, and what avoids digging up new paving to fit a pipe.

If you want a pool, a porch or a covered terrace, the sensible thing is to plan them with the garden rather than separately. For a house project as a whole, see detached houses; for a hard-surfaced outdoor room, terraces; for a very small outdoor space, courtyards.

Steel reinforcement inside a trench, against a rubble stone wall
How it runs

Renovating a garden, step by step.

Two to eight weeks, depending on size. Planting is best done in autumn or spring.

01

Survey and design

We look at the plot, the soil, the sun and how you want to use the garden, and draw a plan.

02

Earthworks and drainage

Levels, drainage and any retaining walls, so that water goes where it should.

03

Hard landscaping

Paving, steps, walls, a terrace or a pergola base.

04

Irrigation and lighting

Pipes and cabling laid before the planting, with an automatic irrigation system and outdoor lighting.

05

Soil and planting

Soil preparation and planting chosen for the climate.

06

Lawn or gravel

Natural or artificial lawn, or gravel and mulch for a low-maintenance finish.

07

Handover

We explain how to care for it and when to water it.

How we work

How we run a garden project.

01

Free survey

We visit and discuss how you want to use the garden. No cost and no obligation.

02

Design and a fixed quote

A plan and an itemised quote, with the planting priced separately.

03

Build, with one site manager

One person coordinates the landscaper, the irrigation installer and the electrician.

04

Handover

A garden ready to enjoy and a plan for looking after it.

Why us

Why renovate your garden with us.

Designed for the climate

Drought-tolerant planting and low-water design that looks good in August.

Services before surfaces

Pipes and cables go in before the paving, not through it.

Irrigation that looks after itself

An automatic system on a timer, sized and zoned for the planting.

Garden, pool and porch together

Planned as one project so they relate to each other and to the house.

Low maintenance by design

We tell you honestly what each choice will cost you in time.

One site manager

Every trade coordinated by one person.

Prices

What a garden renovation costs.

Per square metre of garden, VAT excluded.

What a garden renovation costs — Indicative prices · VAT not included
ScopeWhat it coversPer m² (excl. VAT)
Basic landscapingStandard finishes, practical solution40 – 90 €/m²
Designer landscapingPremium materials and high-end interior designFrom 180 €/m²
Indicative prices · VAT not included. The price depends on paving, irrigation, lighting and planting, and on whether there is earth moving. A low-maintenance garden costs a little more at the start and saves water and labour every year. Everything is itemised.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate3,200 – 7,200 €Basic landscaping · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of garden.

Indicative ranges, VAT excluded.

Small gardenUp to 50 m²2,500 – 9,000 €

City gardens and patios. The design and the lighting make the difference.

Medium garden50 – 200 m²6,000 – 30,000 €

The most common size at a detached house, with seating areas, lawn and irrigation.

Large gardenOver 200 m²From 25,000 €

Large plots with landscaping, mature trees and several areas.

Irrigation and lawn onlyRenovationFrom 30 €/m²

Installing automatic irrigation and renewing the lawn, without heavy building work.

A pool, a covered porch or an outdoor kitchen is a separate project with its own permits, and we quote it separately even where we build it in the same programme.

No small print

What is included and what is not.

The scope of a garden renovation, and what is separate.

✓ Included in the price

  • Survey and design plan
  • Earthworks and drainage
  • Paving, steps and walls
  • Automatic irrigation
  • Outdoor lighting on its own circuit
  • Soil preparation and planting
  • Lawn, artificial lawn or gravel
  • A care plan
  • A written warranty

✕ Not included — quoted separately

  • Swimming pool, porch and outdoor kitchen, unless itemised
  • Mature trees, unless itemised
  • Ongoing garden maintenance
  • Council taxes and fees
  • Boundary walls and fences, unless itemised
  • Water and electricity connections not already present

VAT is shown as its own line — 10% or 21% depending on your case.

Where we work

Where we renovate gardens.

Gardens across Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about gardens.

Natural or artificial lawn?

Natural grass looks and feels best and needs a lot of water, which is a real cost and sometimes a restriction in a dry year. Artificial lawn needs no water and little upkeep, is good for small gardens and children, and gets hot in summer. For many gardens in Catalonia, a mix of a small natural patch, gravel and drought-tolerant planting is the practical answer.

How do I make a garden that is not a lot of work?

By choosing plants adapted to the climate, mulching to keep the soil moist, using gravel or paving where grass would be a chore, and fitting automatic irrigation on a timer. Low-maintenance does not mean no maintenance: we tell you honestly what each choice costs in time.

Do you install automatic irrigation?

Yes, and it is one of the best-value items in a garden. A system zoned for lawn, beds and pots, with a timer and a rain sensor, saves water and keeps the plants alive when you are away. It goes in before the paving and planting.

How much does it cost?

Roughly 40 to 90 €/m² for basic landscaping, 90 to 180 €/m² for a complete garden and from 180 €/m² for designer landscaping, excluding VAT. A 100 m² garden at the complete level comes to around 9,000 to 18,000 €.

Can you plan the pool and the porch with the garden?

Yes. It is far better to design them together, so that levels, services and access work. The pool and porch are separate projects with their own permits and are quoted separately. See swimming pool construction.

How long does it take?

Two to eight weeks depending on the size. Planting is best in autumn or spring.

Free quote

Get a quote for your garden.

Free survey anywhere in Catalonia. A plan designed for the climate.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →