We renovate flats, houses and commercial premises in Barcelona with a team that knows the specifics of the city: apartment blocks in the Eixample, flats from the 60s and 70s and buildings with specific requirements. Fixed quote in writing, a dedicated site manager and full management of the renovation from start to finish.
Renovating in Barcelona has its own rules: Eixample blocks with high ceilings, mouldings and interior courtyards; buildings from the 60s and 70s with worn-out services; cast-iron drainpipes, electrical panels with no earth connection and window frames with no insulation. At Tu Nuevo Piso we know that housing stock and the rules of the Ajuntament de Barcelona: we handle the prior notification or licence that applies, coordinate with the community when shared elements are affected, and give you a fixed quote, itemised by item, with one site manager from start to finish.

We mainly work with these profiles in Barcelona. If one of them describes you, we are a good fit:
You have just bought, or are about to buy, an older building and want to make it your own, with new services and no surprises.
You need more light, another bedroom or an open kitchen. We rearrange the layout so the flat suits the way you live.
Properties bought to renovate and sell or rent out. We adjust cost and finishes to maximise the value of the property.
You are putting the flat up for rent and want a lasting, practical renovation, with the habitability certificate (cédula de habitabilidad) and energy certificate in order.
Each period of the city was built differently, and the renovation depends on what is behind the wall. These are the things we usually find, and what we do about them.
Ceilings over three metres high, Catalan vaults (bóveda catalana), load-bearing walls and, with luck, hydraulic tiles under three layers of flooring. The installations almost always need to be redone in full, and the wiring is rarely certified for today's power demand.
What we do: We redo entire installations, restore the original hydraulic tiles and mouldings where it makes sense, and handle the heritage paperwork when a building is listed.
Buildings put up with tough period materials: joist floors that are worth checking (including aluminosis, which is tested for, not assumed), narrow light-well courtyards, and machetón brick partitions that can be moved.
What we do: Probe the floors first, reinforce where needed and re-plan the layout, as almost no partition walls are load-bearing.
Blocks from the boom years: terrazzo throughout, uninsulated aluminium window frames, late heating systems and roller shutter boxes that let energy escape. Structurally they are usually sound; energetically they leak like a sieve.
What we do: Focus on efficiency: windows, interior insulation, heat pumps. If the terrazzo is in good condition, it is polished rather than covered.
Structure and drainage can often be reused, but the layout is chopped up (long corridors, closed-off kitchens) and the finishes are basic developer standard. The potential lies in opening up, not rebuilding.
What we do: We knock down the right partition walls, join the kitchen and living room, and renew the finishes. The installations can often be partly kept.
The city’s housing stock is very varied. We adapt the works to what your type of building really needs, not a generic script.
Ceilings of 3.5 m, mouldings, hydraulic tiles and galleries facing the block courtyard. We help you decide what to keep and what to modernise; façades and courtyards are regulated and often protected.
Cast-iron soil stacks, electrical panels without earthing, and window frames without insulation. Full installations almost always need replacing and, sometimes, the floor slabs need checking for aluminosis.
A quick, good-value renovation focused on kitchen, bathroom, paintwork, flooring and energy efficiency, with the habitability and energy certificates in order. We prioritise what adds the most value in Barcelona.
Single-family houses and duplexes, ground-floor units with a patio, and changes of use from commercial premises to homes or businesses: structure, damp, accessibility and activity licence where it applies.
We come to your flat in Barcelona, measure up and check the real condition of the installations and structure. Free and no obligation.
A fixed written quote, broken down by item, with the finishes specified. No “from” prices that shoot up later.
We prepare the prior works notification or the works licence and, where needed, coordinate with the owners' community and the building administrator.
One site manager coordinates the trades and sends you regular photos and video. Handover comes with the electrical certificates (CIE), the habitability certificate and the warranty.
A minute inside a renovation finished by our team: the detailing, close up and untouched.
From modernista Eixample buildings to 60s and 70s blocks, each type hides its own surprises, and some parts must be renewed no matter what.
We handle prior works notifications and works licences with the Ajuntament de Barcelona, and coordinate with the owners' community when shared elements or the façade are affected.
One point of contact for the whole renovation, with regular photos and video of the progress. No chasing five different trades.
A fixed price, broken down by item after the visit. What you sign is what you pay, with no last-minute extras.
Bricklayers, plumbers, electricians and carpenters, working under one contract and one schedule.
A written warranty on the works, with a registered technical architect when the project needs one.
Indicative ranges for renovations in Barcelona, based on real quotes. The final price is always a fixed quote after the visit.
| Quality level | What it covers | Price per m² | |
|---|---|---|---|
| Economy / functional | Standard finishes, layout unchanged | 520 – 650 €/m² | |
| Mid-range quality | Selected materials, possible layout changes | 750 – 940 €/m² | |
| High-end / luxury | Premium materials and exclusive design interiors | 1,060 – 1,340 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Two flats of the same size can cost very different amounts. Beyond the €/m², these are the factors that move the price of a renovation in Barcelona most:
Old plumbing, electrics and drainage are often replaced in full. If they are in good condition, a significant part of the cost is saved.
Old buildings in the Eixample and the ensanche can hold surprises such as timber joists, damp and outdated services, which need to be dealt with.
Knocking down partition walls, moving the kitchen or bathroom or opening up spaces involves plumbing, electrics and sometimes structure, and it pushes up the budget.
The same flat can cost half or double depending on the finishes: standard ceramic tiles versus large-format porcelain, joinery, sanitaryware and kitchen.
A prior works notification is inexpensive. A major works licence needs a project, technical management and fees, which add to the budget.
Buildings without a lift, narrow streets in the old town or upper floors all raise the cost of carrying materials, unloading and removing rubble.
Every job in Barcelona comes with its paperwork. We take care of all of it so yours can start, and finish, without hold-ups.
For interior works, the Barcelona Ajuntament uses an assabentat if the layout, structure and façade stay as they are in a non-listed building; an immediate comunicat, with a signed technical project, if the layout changes without touching the structure; and a deferred comunicat, with a one-month review, if the works partly affect the structure or cover two or more homes in the building. We prepare and file the one that applies.
A major-works licence is required for a global intervention in the structure or foundations, a change of use, new dwellings, an external lift or works on the façades of listed or protected buildings; in those buildings the heritage report extends the deadline to three months. A partial or one-off structural change, or restoring the façade of a non-listed building, goes through a comunicat. We tell you at the site visit whether your renovation needs a licence.
The building inspection (ITE) is compulsory once a building reaches a certain age. If your block's inspection is outstanding or has found defects, we can help with the inspection and the repair work.
Needed to sell or rent. We arrange the habitability certificate and the energy certificate, before and after the renovation.
For a private home (or an owners’ community) finished at least two years before the works start, provided the materials supplied do not exceed 40% of the taxable base. From 1 December 2026, if Congress validates Royal Decree-law 29/2026, it will also cover homes let as a main residence, and payment will have to be by card, transfer, nominal cheque or bank deposit. We show this clearly in the quote.
When shared elements are affected (drainage stacks, façade, courtyards, roof), we coordinate with the community and its administrator.
If your renovation improves energy efficiency, you may be able to recover part of the cost. We help you apply.
Grants for energy renovation (insulation, windows, aerothermal heat pumps), managed in Catalonia by ICAEN. We prepare the certificate and the paperwork.
The Barcelona Housing Consortium (Consorci de l’Habitatge) publishes calls for grants for building and home renovation. We gather the technical documents you need.
For works that cut a home's energy demand or consumption. Eligibility depends on the rules in force and the right paperwork; we will guide you.
From a full home renovation to a single trade, these are the services we offer in the city.
How we handle each of these services in the city, with prices and examples of work from the neighbourhood.
Each pin is one of our jobs in Barcelona, at street level. Tap one to open the project.
Located at street level, for our clients’ privacy.
We work across the whole city and the metropolitan area, with teams that know every type of building in Barcelona.
We mainly renovate in:
Modernist flats in the Cerdà Eixample: high ceilings, mouldings, galleries and hydraulic tiles. We renovate the services and layout while keeping what gives them character.
Large houses and high-end homes in the upper part of the city: full renovations with interior design, climate control and top-quality finishes.
More recent residential blocks (Poblenou, Diagonal Mar): practical flats where we optimise the layout and energy efficiency.
Historic buildings in the old town (Gòtic, Born, Raval): listed buildings and difficult access, which call for specialist trades and specific permits.
And also in the rest of the districts:
Barcelona neighbourhoods with their own page:
Official boundary data for comarques and municipalities (ICGC, 2025).
Everything you need to know about renovating in Barcelona: prices, licences, timescales and grants.
Realistic prices in Barcelona run from 520 to 1,340 €/m² excluding VAT. The building matters more than the neighbourhood: original services that must be completely redone, stairs without a lift where all the rubble has to be carried down, and protected features that need slow, careful work. As a rough guide, an 80 m² flat in an old building with everything to redo comes to around 41,300–52,100 €. The same flat in a seventies block with the risers already renewed can come in well below that. After the free technical visit, you get a fixed quote broken down by item: what you sign is what you pay.
The Ajuntament de Barcelona has four routes. The assabentat covers interior works that change neither the layout, the structure nor the façade of a non-listed building, and needs no documents. The immediate comunicat (minor works type II) covers, for example, a layout change that does not touch the structure: it is filed with a signed project and work can start the next day if the documents are complete. The deferred comunicat (type I) has a one-month review and applies, for example, to works that partly affect the structure or to renovations of two or more homes in the building. And the llicència d’obra major, resolved in two months (three if a fire-service or heritage report is needed), is required for global interventions in the structure or foundations, changes of use, new dwellings, external lifts or the façades of listed or protected buildings. At the visit we tell you which one applies to your case, and we handle the paperwork.
Allow 10 to 16 weeks of works for a 70–100 m² flat. In Barcelona you should also allow for council processing: an assabentat is immediate, but a deferred comunicat or a licence can add weeks before work starts, and for listed buildings the heritage review is separate. That is why we provide a written timetable with the two phases kept apart: paperwork and works.
For a full renovation, honestly, no. There are days without water or power, dust, and trades working on top of each other, and it is harder to work around furniture. Staying put is common in partial renovations, working in phases and sealing off the work area. We will tell you plainly at the visit, depending on what needs doing.
No. The technical visit in Barcelona and the fixed quote broken down by item are free and without obligation, and we usually deliver the quote within 24–48 hours. We would rather you compare quotes item by item.
By measuring before quoting. The technical visit checks for what usually causes surprises in Barcelona buildings, such as shared drainage stacks, joists, damp from the courtyard and shared services, and the fixed quote already allows for it. If you decide on a change during the works, it comes with a written price and only goes ahead once you approve it. No ‘we’ll look at it later’.
Every item with its price: labour from each trade, materials, waste management with a skip and a street occupation permit if needed, protection of shared areas in the building, the site manager and final cleaning. If your renovation needs a project or licence, you will see it as a separate item, not as a surprise.
Yes. Many Eixample buildings keep protected or valuable features, such as glazed galleries, mouldings, hydraulic mosaic tiles and original joinery, and a good renovation does not cover them up. We decide with you what is kept and what is modernised, and we handle the authorisation when protected or shared elements are affected.
Yes. Listed buildings, communities with strict rules, limited working hours, narrow stairs and flats without a lift are common conditions when renovating in Barcelona. We build them into the timescale and budget from the start, not when a problem appears.
Yes. When the works affect shared elements such as drainage stacks, the façade, courtyards or the roof, we talk to the community and its managing agent, agree working hours, and protect the stairwell and entrance hall. In Barcelona buildings this is not an extra. It is part of the job.
Yes. We work with qualified architects and technical architects for the design and technical management when the works require it: structural work, significant layout changes or a works licence (llicència d’obres). If your renovation does not need them, we do not charge you for them.
For renovations of a private home (or of an owners’ community) finished at least two years before the works start, the reduced 10% VAT rate applies if the materials supplied by the company do not exceed 40% of the taxable base. If they do, or for new-build work, the rate is 21%. From 1 December 2026, if Congress validates Royal Decree-law 29/2026, the reduced rate will also cover homes let as a main residence, and payment will have to be by card, transfer, nominal cheque or bank deposit. Our prices are always shown without VAT, and your quote reflects the rate that applies to your case.
Yes. Energy-efficiency improvements, such as insulation, windows and aerothermal heat pumps, may qualify for Next Generation funds managed by the ICAEN and for income tax (IRPF) deductions. The Consorci de l’Habitatge de Barcelona also publishes its own refurbishment calls. We prepare the technical documentation they ask for.
Yes. A written works guarantee. We also stay answerable after you have paid, which is when it becomes clear who is who.
A fixed quote broken down by item, with no “from” prices. One named site manager who sends you regular photos and video of the progress. A written guarantee. Anyone can promise an easy job; this is what you sign.
All over the city: Eixample, Gràcia, Sarrià-Sant Gervasi, Sant Martí, Sants-Montjuïc, Ciutat Vella, Les Corts, Horta-Guinardó, Nou Barris and Sant Andreu. And in the metropolitan area: l’Hospitalet, Badalona, Santa Coloma, Sant Cugat and nearby towns.
Yes. As well as flats, we renovate apartment buildings in Barcelona: shared areas, entrance halls, staircases and building services. We coordinate with the owners’ community and handle the licence. Book a visit and we will prepare an itemised quote.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free technical visit in Barcelona and a fixed quote in writing. Reply within 24 h.