Renovations · Barcelona

Flat renovations in Barcelona

We renovate flats in Barcelona — complete or partial — with a team that knows Eixample flats, homes from the ’60s and ’70s and buildings with specific requirements. Redesign, new services, kitchen, bathrooms and finishes. A fixed quote in writing.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Apartment renovation

Renovating a flat in Barcelona.

Renovating a flat in Barcelona usually means gaining light and space: opening the kitchen to the living room, rearranging bedrooms and bathrooms and renewing services that are often worn out. In Barcelona the usual job is working with Eixample flats, homes from the ’60s and ’70s and buildings with specific requirements, so we adapt each renovation to the type of building.

We take care of everything with a single site manager and a fixed quote item by item. Whether you are buying a flat to renovate, renewing your own or getting it ready to rent, you get clear timescales and a written guarantee on the work.

Living room in progress with a dark stone panel and television, a lamp wrapped in plastic, sofas and table covered and white polished porcelain flooring, in a flat in Bonanova
Prices

What an apartment renovation costs.

Per square metre of floor area, VAT excluded.

What an apartment renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
FunctionalStandard finishes, practical solution520 – 650 €/m²
High specificationPremium materials and high-end interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. The price per square metre is higher in a small apartment than in a large flat, because the bathroom and the kitchen cost almost the same however small the home is. That is why the per-square-metre figure looks high on a studio and low on a three-bedroom flat of the same quality. The fixed quote itemises everything so you can see where the money goes.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of apartment.

Indicative ranges for a full renovation, VAT excluded.

StudioUp to 40 m²22,000 – 45,000 €

A single well-organised space: integrated kitchen, sleeping area and made-to-measure storage. The highest cost per square metre.

One-bedroom apartment40 – 60 m²31,400 – 63,000 €

The most common format for letting. A living room with kitchen, a bathroom and a bedroom, well resolved.

Two-bedroom apartment60 – 80 m²34,400 – 75,300 €

For living in or letting to families. An open kitchen, one or two bathrooms and a good layout.

For lettingTurnkeyAsk us

We tune the project to the return, with hard-wearing materials and a short programme so it reaches the market sooner.

If the apartment is to be let, two things sit outside these figures: furniture and equipment, and whatever licensing the type of letting needs. A long-term let needs a habitability certificate and an energy certificate; a tourist let is a separate licensing question for a lawyer. See habitability certificates.

No small print

What is included and what is not.

The scope of a turnkey apartment renovation, and what normally sits outside it.

✓ Included in the price

  • Precise survey and space plan
  • Strip-out and clearance
  • New plumbing and drainage
  • Electrics with certificate
  • Ventilation and, where specified, air conditioning
  • New layout and made-to-measure storage
  • Flooring and painting throughout
  • Kitchen and bathroom
  • Snagging and a written warranty

✕ Not included — quoted separately

  • Furniture and equipment, unless itemised
  • Appliances, except those itemised in your quote
  • Habitability and energy certificates, which are separate services
  • Licensing for tourist use
  • Council taxes and fees where they apply
  • Decoration and styling

VAT is shown as its own line, and for an investor it needs care: work billed to a company, or on a property being prepared for a commercial activity, can be taxed at 21% rather than 10%. Tell us how the property is held and we will apply the right rate in writing.

In the same town

Other services in Barcelona

The same team and the same fixed quote, for the rest of the home in Barcelona.

Common questions

Frequently asked questions

Flat renovations in Barcelona: what you ask us most.

How much does it cost to renovate a flat in Barcelona?

As a guide, a full renovation runs between 520 and 1,340 €/m² depending on specification and the condition of the services. A partial renovation (kitchen, bathroom or painting) costs less. A fixed quote after the free technical visit.

I have just bought a flat to renovate: where do we start?

With a free technical visit: we check structure, services and real condition, work out the layout and give you a quote fixed item by item so you know exactly what you will pay and in what timescale.

What does your fixed quote include?

Everything, item by item: labour of every trade, materials, waste management, protection of communal areas, site-manager coordination and the final clean. What you sign is what you pay.

Do you work in old and protected buildings in Barcelona?

Yes. In Barcelona we renovate modernista and listed buildings in the Eixample and Ciutat Vella: we restore the elements of value and, when the façade or communal elements have to be touched, we handle the heritage authorisation with the council.

Free quote

Get your flat renovation quote in Barcelona

Free survey anywhere in Catalonia, in English, and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →