71 published projects • Our own photos • Located at street level

Renovation projects in Barcelona and Catalonia: our real work

This page brings together real projects delivered by our own team in Barcelona and Catalonia: full renovations, bathrooms, kitchens and commercial units, each with its floor area, timeline and indicative budget.

Every entry comes from a job we have done, and the photos were taken by our site manager. Where we give a street or a budget, they are the real ones — the range that was signed, excluding VAT; and where we cannot confirm them, we would rather leave them out than invent them. Use it to get a feel for what a renovation like yours costs and how long it takes, before asking us for the free site visit.

  • Free site visit
  • Itemised fixed quote
  • Written warranty
Main bathroom with a freestanding bath and a marble wall in a renovated house in Cerdanyola del Vallès
Where our projects are

Areas with published projects

From Barcelona itself to the Vallès, the Baix Llobregat and inland Catalonia: each area with the jobs we have already delivered there.

Barcelona city

Flats in period buildings, commercial units and bathrooms across the city districts.

Projects in Barcelona.

38 published projects

Metropolitan area and Vallès

Homes and buildings in the Barcelonès, Baix Llobregat, Vallès and Maresme.

Projects in Gavà, El Prat de Llobregat, Cornellà de Llobregat, Montcada i Reixac, Matadepera, L'Hospitalet de Llobregat, Molins de Rei, Terrassa, Sabadell, Sant Cugat del Vallès, Premià de Mar, Barberà del Vallès, Badalona, Rubí, Santa Coloma de Gramenet, Castelldefels, Sant Joan Despí, Sant Boi de Llobregat, Granollers, Cerdanyola del Vallès, Sant Feliu de Llobregat, Santa Perpètua de Mogoda.

26 published projects

The rest of Catalonia

Projects in inland and coastal comarques, with the same team and the same fixed quote.

Projects in Manresa, Vic.

2 published projects
Interactive map

Our projects on the map

Every pin is one of our projects, placed at street level. Filter by status, zoom in, or pick a project from the list.

Loading the project map…

Located at street level, for our clients’ privacy.

What is in the portfolio

The kinds of renovation we carry out

The same teams do the full renovation and the five-metre bathroom. Each kind, with its service page and its projects.

Local coverage

Service areas and local pages

If you are looking for a renovation in your town, here are the specific pages with prices, timelines and nearby projects.

See every area in Catalonia →

Featured projects

Three projects up close

Three renovations from the portfolio, different on each visit: what was there, what we did and how it turned out.

On video

One of our projects, on video

A minute inside a renovation finished by our team: the detailing, close up and untouched.

Frequently asked questions

About our projects

What people ask when they see the entries: photos, addresses, budgets and timelines.

Are the project photos real?

Yes. Every photo on these entries was taken by our own team on site — before, during and at the end. We use no renders and no stock images on project entries: if a photo is ours, it genuinely is.

Why is the exact address of each project not shown?

Out of respect for our clients: we give the street and the neighbourhood, never the number. That lets you see where we work and what kind of building it is without exposing anyone’s home.

Are the budgets on the entries the real ones?

They are the range of the quote that was signed for that job, rounded, and always excluding VAT. They are a guide for a similar job; your own quote is prepared after the free site visit and is fixed and itemised.

How long does a renovation like these take?

In the published portfolio the projects run from 1 to 28 weeks: a bathroom or a floor replacement comes in at two or three, a full flat renovation at around ten, and a whole building can go past twenty. Each entry gives the real number of weeks for that job.

Can I visit a project before deciding?

If we have work in progress nearby and the owner agrees, we arrange a visit by appointment. Ask when you request the quote and we will confirm it.

Do you work in my area?

We work across Catalonia: Barcelona itself, the metropolitan area, the Vallès, the Maresme, the Baix Llobregat and the provinces of Girona, Tarragona and Lleida. The portfolio has 71 published projects in 26 towns, and the site visit is free anywhere in that area.

Want a renovation like this in your home?

Tell us what you want to renovate and we will tell you — with a free visit and no obligation — what it would cost and how long it would take.

✆ Call✦ WhatsAppGet a quote →