Tiling, bevelled tile and mosaic in L’Hospitalet de Llobregat

Rambla Just Oliveras, L'Hospitalet de Llobregat · 5 m² · 2026

Wall of bevelled metro tile laid in herringbone, with the bevel marking the joint

Project details

Floor area
5 m²
Property type
Flat
Duration
2 weeks
Year
2026
Status
Completed
Budget
2,100–2,300 €
What we did
Bevelled metro tile laid in herringbone and with aligned joints · White hexagon with a contrasting grout line · Built-in mosaic shower trays · Glass mosaic in a cloakroom

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

Tiling in white metro tile, bevelled tile in herringbone, hexagon with a contrasting grout line and shower trays done in mosaic over a fall formed on site.

Metro tile is the cheapest to buy and the most expensive to lay badly. It is small, so it multiplies the joints, and any deviation builds up along the wall until it is visible to the naked eye.

Laid in herringbone, as in these photos, the difficulty doubles: each piece rests in two directions and the bevel marks the joint with a shadow of its own, so there is nowhere to hide an unevenness. The axis is set out again, the first diagonal is laid dry and only then does the fixing begin.

In the shower trays the mosaic is not an aesthetic decision but a construction one: being a small piece, it absorbs the fall towards the drain without needing to be cut, something a large slab does not allow. The fall is formed beforehand, in the mortar layer, and the mosaic follows it.

This is tiling work in L’Hospitalet, measured on site piece by piece.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.