Renovations · L'Hospitalet de Llobregat

Full home renovations in L’Hospitalet de Llobregat: dense flats, blocks from the ’50s–’70s and commercial units

We renovate across the whole city — Collblanc-La Torrassa, Santa Eulàlia, La Florida, Bellvitge — where small flats and post-war blocks dominate. We know their worn-out services and their typical faults. A fixed written quote and one site manager from start to finish.

Since 2010Free technical visitItemised quoteWarranty on the work

Fixed written quote
L'Hospitalet de Llobregat
L'Hospitalet de Llobregat
Fixeda written, itemised quote
1 site managera single point of contact for the whole renovation
Freetechnical visit in L’Hospitalet
Warrantyon the work
Renovations in L’Hospitalet

Renovating in L’Hospitalet,
with no surprises.

L’Hospitalet is the second-largest city in Catalonia and one of the densest in Europe. Its housing stock is compact flats and blocks of the ’50s–’70s put up for the migrant workforce — Collblanc, La Torrassa, La Florida — and the Bellvitge towers of the ’60s. Many carry obsolete services, damp and, in some cases, structural faults. We make the most of every square metre, with a fixed quote and a single site manager.

  • Fixed quote before we start
  • A dedicated site manager on your renovation
  • Completion date in writing
  • Full handling of licences and permits
Finished bathroom in a flat in L’Hospitalet: wall-hung vanity unit, mirror and white towel rail
By type of building

Every building in L’Hospitalet calls for a different renovation.

Every type of home asks for a different renovation. We fit the job to what your building really needs, not to a generic script.

01

Post-war blocks (’50s–’70s)

Collblanc, La Torrassa, La Florida: small flats with cast-iron downpipes, consumer units with no earth and worn-out services. We renew everything and gain space by re-planning.

02

Bellvitge and Gornal towers

Large blocks from the ’60s: a check of their condition, better efficiency (windows, insulation) and a full renovation that respects the community.

03

Small flats, made the most of

In flats of 40–60 m² every centimetre counts: open kitchens, bathrooms gained and made-to-measure storage so you can live better in little floor area.

04

Commercial units and changes of use

Ground floors and units in the Centre or Santa Eulàlia: change from unit to home or to a business, with structure, accessibility and the activity licence.

A real job in L’Hospitalet

A 5 m² bathroom on Carrer Major, rebuilt from the inside out

It is the job that best explains how we work in L’Hospitalet: a five-metre bathroom in a flat on Carrer Major. The old tiling was hacked back to the brick, the walls were repaired, a flush built-in shower base was formed with a waterproof membrane and the room was tiled in large format; then came a wall-hung unit, a screen and an electric towel rail.

Two weeks of work and a range of 12,000–13,500 € (indicative · base excluding VAT). What you see in the photos is exactly what was quoted.

  • 5 m² · 2 weeks of work
  • Waterproofed built-in shower base and flush shower
  • Large-format tiling
  • Wall-hung unit, screen and electric towel rail
See the full project page →
Finished bathroom in a flat on Carrer Major, L’Hospitalet: toilet, mirrored cabinet and beige tiling
Bathroom wall opened up to the brick during the works
Before: tiling hacked back to the brick and walls repaired.
Base of the shower tray waterproofed with the drain in place
During: built-in shower base with waterproof membrane and drain.
The finished bathroom seen from the door
After: large format, screen and wall-hung unit.
Flats of 50–70 m²

Renovating a small flat in Collblanc, La Torrassa or La Florida

A good part of L’Hospitalet’s housing is flats of 50 to 70 m² in blocks put up between the ’50s and the ’70s: a long corridor, a closed kitchen and a bathroom with a bath. The job here is rarely about finishes, it is about layout and services: opening the kitchen to the living room or turning the corridor into wardrobes, swapping the bath for a flush shower and redoing the electrics with a new consumer unit and earth, which in many of these flats is still the original.

Two things we always check on the visit: the downpipes — buildings of that period may still have fibre-cement sections, and removing them is done by a firm on the asbestos-risk register (RERA) — and the state of the floors, because some metropolitan blocks of the ’60s and ’70s used high-alumina cement. If there are symptoms, we say so before quoting, not halfway through the job.

  • Open kitchen and flush shower to gain space
  • New consumer unit and earth
  • Fibre-cement downpipes removed by an RERA firm
Renovated bathroom in L’Hospitalet with a white wall-hung unit and a mirror
Bellvitge and El Gornal

Renovating in a ’60s tower: community, lift and working hours

In Bellvitge and El Gornal the typical home is in blocks of more than ten storeys built between the mid-’60s and the ’70s. Here the work is organised differently: we carry materials up and bring rubble down in the lift with protection, agree noise hours with the president or the administrator and warn the neighbours on the staircase before starting. That is what keeps a full renovation in a tower from ending in conflict with the community.

Inside, these flats welcome three things: new windows with a thermal break (the original single-glazed aluminium ones lose a lot of heat), insulating the inside of the façade wall, and renewing the heating or switching to aerothermal when the community allows it.

  • Lift and common areas protected
  • Working hours agreed with the community
  • Efficient windows, insulation and heating
Finished shower with a screen and dark tray in an L’Hospitalet bathroom
L’Hospitalet Ajuntament

Works permits in L’Hospitalet: what is asked for and how long it takes

For an interior renovation that does not touch the structure, L’Hospitalet’s Ajuntament works with prior works notification: you file the documents, pay the fee and can start without waiting for a resolution. If the work affects the structure or the façade, or changes the use of the property, you need a licence with a technical project, and there it is wise to allow weeks for processing. We file everything and include it in the quote.

Two very local details: on narrow streets in Collblanc, La Torrassa or the Centre the rubble skip needs a permit to occupy the public highway, which we also handle; and buildings with homes must pass the building inspection (ITE) in Catalonia before they reach 45 years of age, with some exceptions, so we use the visit to see whether the community has it up to date.

  • Prior notification for interior works
  • Licence with a project if the structure or façade is touched
  • Skip and public-highway occupation handled
Finished beige cloakroom with a basin and a mirror in L’Hospitalet
How we work

How we work with you.

01

A survey wherever you are

We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.

02

Design and a fixed quote

A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.

03

Council paperwork

We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.

04

Works under a site manager, with a warranty

One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.

On video

One of our projects, on video

A minute inside a renovation finished by our team: the detailing, close up and untouched.

Prices

What it costs to renovate in L’Hospitalet.

Indicative ranges in L’Hospitalet, based on real quotes. The final price is always a fixed quote after the visit.

An 80 m² flat41,300 – 52,100 €3 bedrooms, a bathroom, a WC and a kitchen · 520–650 €/m² · VAT not included
A 120 m² house70,100 – 88,600 €4 bedrooms, 2 bathrooms and a kitchen · 580–740 €/m² · VAT not included
What it costs to renovate in L’Hospitalet — Indicative prices · VAT not included
Quality levelWhat it coversPrice per m²
Basic / functionalStandard finishes, layout unchanged520 – 650 €/m²
High-end / luxuryPremium materials and exclusive interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. Not a binding offer: the definitive quote, fixed and broken down item by item, is always given after the free technical visit.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Basic / functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

What changes the price of a renovation in L’Hospitalet

Two homes of the same size can cost very different amounts. Beyond the €/m², these are the factors that move the price most:

Condition of the services

Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.

Age of the building

In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.

Changes to the layout

Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.

Quality of the materials

The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.

Permits needed

A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.

Access to the site

Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.

Councils and regulations

Licences and paperwork, sorted.

Every job has its own procedure: minor works notification, major licence, building inspection, habitability certificate… We deal with it all with the relevant council.

Works notification (minor works)

For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.

Major works licence

If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.

Building inspection (ITE)

The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.

Habitability and energy certificates

Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.

Reduced 10% VAT

On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.

Owners’ community

When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.

What we renovate

Everything we renovate in L’Hospitalet.

From the full renovation to a single trade. These are our most requested services.

See all services →
Pages for this city

Services with a page of their own in L’Hospitalet.

How we handle each of these services in L’Hospitalet, with prices and examples from the area.

Where we work

L’Hospitalet neighbourhoods where we renovate.

We work across the whole area, with crews who know each type of home in L’Hospitalet.

We renovate mainly in:

Collblanc and La Torrassa

Dense, older flats next to Barcelona: services to be renewed completely and space optimised.

Santa Eulàlia and Centre

Old town and expansion district with buildings of different periods, plus the units and shops we also renovate.

Bellvitge and Gornal

Towers of the ’60s, where we prioritise energy efficiency, windows and comfort.

La Florida and Les Planes

Blocks of the great migration: full renovation and an upgrade of damp and services.

And also in:

Neighbourhoods of L’Hospitalet with a page of their own:

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

Everything you need to know about renovating in L’Hospitalet: prices, licences, timescales and grants.

How much does it cost to hire a renovation company in L’Hospitalet?

As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. A flat of 60–80 m², very common in the city, usually lands between 24,000 and 50,000 €. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.

How much does it cost to renovate a bathroom or a kitchen in L’Hospitalet?

As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.

What does your fixed quote include?

Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.

How do you avoid cost overruns?

With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.

How long does a full renovation take?

A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.

Do you work with architects and handle the licences?

Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.

Do you offer a warranty?

Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.

Are there grants or subsidies for renovating in L’Hospitalet?

Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.

My block is old: could it have structural faults?

It is possible in post-war buildings. On the technical visit we check the state of the floors and downpipes and, if we see symptoms, we propose the checks and reinforcement required, coordinating with the community when common elements are affected.

My flat is small: how do you make the most of it?

With smart re-planning: kitchens open to the living room, optimised bathrooms, made-to-measure storage and good lighting. In flats of 40–60 m² the design makes the difference between feeling cramped and living comfortably.

Do you do single bathroom or kitchen renovations in L’Hospitalet, or only full ones?

Both. The job we show on Carrer Major was just a 5 m² bathroom: two weeks, a built-in shower base and new services. For a single bathroom or kitchen the process is the same — visit, a quote fixed item by item and a site manager — and each has its own page of bathroom and kitchen renovations in L’Hospitalet.

Do I need the community’s permission to renovate my flat in Bellvitge?

For work inside your home you do not need the community’s permission, but the Civil Code of Catalonia requires you to tell the president or the administrator beforehand (art. 553-36.3), and it is wise to keep to the building’s working hours. The owners’ meeting’s agreement is only needed when common elements are touched: main downpipes, the façade, balcony enclosures or the structure. We talk it through with the administrator before starting.

Can the work be done while I live in the flat?

In partial renovations, yes: a bathroom or a kitchen is done in phases and we protect the rest of the home. In a full renovation of a small flat we do not recommend it: there are two or three weeks without water or services that are better spent elsewhere. We tell you plainly at the visit.

What does a full renovation in L’Hospitalet include and how much does it cost?

The price of a full renovation in L’Hospitalet is the one in the price section above, taken from our own quotes and excluding VAT. We cover everything from a flat renovation and the full restoration of a home to the complete renovation of a house in L’Hospitalet de Llobregat; the full-renovation quote comes with full management of the works — licences, trades and a single site manager. If you need a quote to restore a home or to renovate a full kitchen in L’Hospitalet, the technical visit is free.

However it is searched for, is it the same service?

Yes: “full renovation in L’Hospitalet”, “flat renovation”, “home refurbishment”, “house renovation” and “renovation company in L’Hospitalet de Llobregat” are different ways of writing the same need, and all of them get the same quote fixed item by item.

Do you renovate entrance halls and stairwells of communities in L’Hospitalet?

Yes. In the blocks of the ’50s–’70s this is work communities often need: new flooring and wall finishes, letterboxes, lighting and, when needed, removing steps with a ramp or a stair lift. The work is approved at the owners’ meeting, quoted item by item and organised so neighbours can come and go every day. We describe it on our page on entrance-hall renovations.

Do you renovate interior courtyards and light wells in L’Hospitalet?

Yes. In the courtyards of the city’s dense blocks, old downpipes, damp walls and floors that do not drain water well pile up. We renew the paving and the waterproofing, put downpipes and drains in order and, if the courtyard is private to a ground-floor home, make it usable. When the courtyard is a common element, the community approves the work.

Can a full renovation in L’Hospitalet include changing the floors?

Yes, and it is a common one: a full renovation with new floors in L’Hospitalet de Llobregat, because many flats keep their original paving. If the base is sound, the new floor can go over the old one, with less rubble and fewer days of work; if not, it is removed and levelled before laying. The option chosen is written into the fixed quote.

Do you carry out full renovations of commercial units in L’Hospitalet de Llobregat?

Yes. We carry out full renovations of commercial units in L’Hospitalet de Llobregat, both to open a business and to turn a ground-floor unit into a home when the planning allows it: services, accessibility, ventilation and the activity licence or the notification that applies at the Ajuntament, all in a single fixed quote.

Free quote

Ask for your quote, no strings attached.

A free technical visit in L’Hospitalet and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →