Bathroom renovation with a flush shower in L’Hospitalet de Llobregat
Carrer Major, L'Hospitalet de Llobregat · 5 m² · 2026

Project details
- Floor area
- 5 m²
- Property type
- Flat
- Duration
- 2 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 12,000–13,500 €
- What we did
- Bathroom renovation · Waterproofing · Built-in shower base · Large-format tiling · Unit and sanitaryware
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A bathroom redone from the inside out: a waterproofed built-in shower base, large-format tiling and a wall-hung unit with a heated towel rail.
Here the important part happened before anything could be seen: the wall was opened up to the brick, the plumbing was redone and the built-in shower base was waterproofed with membrane and corner reinforcements before a single tile went on. It is the part of a bathroom that no magazine photo shows and the one that decides whether there are leaks in two years’ time.
On top went large-format tiling — fewer joints, easier cleaning — with the shower area in a darker tone and a fixed glass screen. The wall-hung unit with drawers leaves the floor free, which in a small bathroom is noticed every day, and the electric towel rail saves running a radiator in a damp room.
The result is a sober bathroom, with no stridency, built to last: the expensive part here is hidden behind the tile, which is where it should be.
Thinking of a bathroom renovation in the centre of L’Hospitalet or in any other neighbourhood? Show us yours as it is and we will tell you what can be done and for how much, with a fixed quote.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.
















