The smallest room with the most that can go wrong. We do the waterproofing, the falls and the ventilation properly, because the bathroom is where a bad renovation shows up in someone else’s ceiling.
A bathroom is two jobs stacked on top of each other. The one you see is tiling, sanitaryware and light. The one that matters is waterproofing, the fall on the waste, and getting humid air out of the room. Get the second one wrong and the first one is irrelevant.
In a flat, that second job has a neighbour attached to it. A shower tray laid without a proper membrane, or a waste with too little fall, reappears as a stain on the ceiling below — and then it is your repair, their decoration, and a conversation with the comunidad. We tank the whole wet zone and we test the falls before anything gets tiled.
The usual change people want is bath out, walk-in shower in. It almost always makes a small bathroom feel bigger and is far easier to use as you get older. The thing to check first is the floor build-up, because a flush tray needs depth that an old slab does not always have.
Ventilation is the part nobody asks about and everybody needs. Many older Barcelona bathrooms have a shaft that no longer pulls, or a window that stays shut all winter. We fit mechanical extraction that runs on a timer, which is what stops the mould coming back after you have paid to remove it. If the bathroom is part of a wider job, see full home renovations, and damp treatment if you already have a problem.

A change many people want, told the way you will live it at home.
We protect the route through the home, remove the bath, its panel and the tiling in the area, and check what is underneath: the waste, the supplies and the state of the base. All the rubble leaves the same day, in sacks.
The new waste goes in position, the falls are formed and the whole shower area is waterproofed. Then a flush or ceramic tray and the new tiling. This is the stage that decides whether it ever leaks.
Taps, a made-to-measure screen, perimeter sealing and a fine check over. You end up with a safer shower and more usable bathroom — and even in a one-bathroom home the disruption is short.
None of them shows in the finished photo. All of them show after a few years.
A built-in tray with too little fall holds water in the corner from the first day. We give the right fall towards a waste with enough flow, and test it with water before any tiling.
Without air renewal, even the best bathroom grows mould in the joints within a single winter. A window where there is one; an extractor with a timer or a humidistat where there is not. It is a small item that protects all the others.
Classic cement grout stains and chips; in wet areas we use technical grout and well-applied quality sealants — the edge of the screen and the junction with the tray are where a bathroom starts to fail.
Concealed taps and hidden cisterns, yes — but with their access panels reachable. A beautiful bathroom where you cannot get to a stopcock ends up broken open with a hammer the day something drips.
Plenty of bathrooms are under five square metres. This is how to get the most out of them.
A wall-hung basin, a wall-mounted unit and a floating WC if the stack allows: an unbroken floor from wall to wall fools the eye and mops in a minute. Few things make a narrow bathroom feel bigger.
A hinged door eats half a square metre of the bathroom and dictates where each fitting can go. Recessed into the partition during the works, a sliding door frees that whole corner — and the works are the perfect moment to fit one.
Suction-cup shelves end up on the floor; a tiled niche inside the wall steals not a centimetre and keeps the bottles in order for good. It is decided before tiling, so ask for it in time.
A single central light throws a shadow right where you look at yourself. We put in general light, mirror light at face height and, if it fits, a generous mirror: the square metres do not change, the feel does.
One to two and a half weeks on site. Two of those stages cannot be rushed: the membrane has to cure and the screed has to dry.
We measure, check the waste positions and the floor depth, and establish what the building will allow. Out of that comes a layout and a fixed quote.
Sanitaryware, tiling and floor out, down to the substrate. This is also when we find out what the previous renovation actually did.
New supply and waste with the correct falls, mechanical extraction, and lighting and socket circuits to the right IP rating for a wet room, with an electrical certificate.
The full wet zone is tanked — floor, shower area and the walls around it — and left to cure. Nothing is tiled until this is done and checked.
Walls and floor tiled, shower tray or formed-in-place base set with the fall running the right way, movement joints where they belong.
WC, basin, vanity unit, shower screen, taps and the shower itself fitted and tested under pressure.
Mirror, lighting, accessories, silicone and a final check for leaks.
Cleaned, walked through with you, certificates handed over, warranty starts.
We come to you, measure the room and check what can move and what cannot. No cost, no obligation, in English.
A layout and an itemised fixed quote naming the tiles, the sanitaryware and the brassware — not a single line saying "bathroom".
Plumber, electrician and tiler coordinated by one person, with progress photos. Most bathrooms are done inside two weeks.
A bathroom tested and ready to use, with the electrical certificate and a written warranty.
The whole wet zone is tanked and the falls are tested before tiling. This is the single thing that decides whether your neighbour ever calls you about it.
Mechanical extraction on a timer, ducted where the building allows. Without it, mould comes back whatever you spend on tiles.
We check the floor build-up before promising a flush tray, and we tell you if the depth is not there rather than discovering it mid-job.
One to three weeks, and we work clean. If it is your only bathroom we plan the sequence around that and say so up front.
Tile, sanitaryware and brassware models written into the quote. You know exactly what you are getting.
Electrical certificate and a written warranty on the work.
Indicative ranges by specification, VAT excluded. The final figure comes from the survey.
| Specification | What it covers | Indicative range (€) | |
|---|---|---|---|
| Functional | Standard finishes, practical solution | 9,500 – 13,000 € | |
| Mid-range | Selected materials, best balance | 14,600 – 19,800 € | |
| Design / high end | Premium materials and high-end interior design | 18,800 – 26,000 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges for a full bathroom renovation, VAT excluded.
A cloakroom WC or a compact bathroom. Good storage and a wall-hung basin make a great deal of difference in a small room.
The usual city-flat bathroom, with a shower or a bath, a vanity unit and good storage. This is the size where swapping the bath for a walk-in shower pays off most.
Large bathrooms with a double basin, a built-in shower and sometimes a freestanding bath. Worth planning the lighting properly at this size.
Replacing the bath with a shower tray, with new tiling and a screen. Quick, and very well received.
If the strip-out reveals damp from a communal riser or from the flat above, that is a separate item and we will show you what we have found before pricing it. Fixing the bathroom without fixing the source is money spent twice; see damp treatment.
The scope of a turnkey bathroom renovation, and what normally sits outside it.
VAT (10% or 21% depending on your case) is always shown as its own line. If you want to supply your own tiles or sanitaryware, that is fine — tell us before we order, and we will price the fitting only and flag anything that will not work with the layout.
Bathrooms are one of our specialities, but we coordinate any trade the job needs.
Bathrooms in Barcelona and across Catalonia. Explore the map or find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What people ask us before committing to a bathroom.
As a guide, 9,500 to 13,000 € excluding VAT for a functional bathroom, 14,600 to 19,800 € for mid-range, and 18,800 to 26,000 € for a design-led one. Simply swapping a bath for a shower starts at around 1,200 €. Because the room is small, the fittings — sanitaryware, taps and tile — are a large share of the total. The structural cost driver is whether the WC and waste move position, since that means opening the floor.
In a small flat, usually yes. You gain floor space, the room reads bigger, and it is much easier to use later in life — which also matters if you ever let or sell the property. The one thing to check first is the floor build-up: a flush, level-access tray needs depth for the waste to run, and older slabs do not always have it. If the depth is not there, a low-profile tray with a small upstand is the honest compromise. We measure this at the survey rather than promising and discovering.
By tanking the whole wet zone rather than relying on the tiles, and by testing the falls before anything is tiled. Tile and grout are not waterproof; the membrane underneath is. We take the membrane up the walls around the shower, not just across the floor, and we flood-test the fall so water goes to the drain rather than to the corner. This is the part of a bathroom you are really paying for, and it is also the part a cheap quote has left out.
One to two and a half weeks depending on scope, and some of those days are waiting rather than working — the waterproofing membrane has to cure and the screed has to dry before tiling. If it is the only bathroom in the property, we say so at the quote stage and sequence the job to shorten the worst of it, but we will not pretend a bathroom can be done properly in a weekend.
Not for work inside your own bathroom. You do need to involve the comunidad if the job touches a communal riser or waste stack, or if you want to alter a ventilation shaft that serves other flats. In practice this comes up when someone wants to move the WC to a wall with no stack behind it. We check the risers at the survey and tell you which of those you are dealing with.
Air movement, not stronger cleaning products. Most recurring bathroom mould in older Barcelona flats is a ventilation problem: a shaft that has stopped pulling, or a window that nobody opens in January. We fit mechanical extraction on a timer so the room clears after every shower, ducted to the outside where the building allows and to the shaft where it does not. Without that, repainting is a yearly ritual.
Sometimes, and it can be good value — new WC, basin, vanity, taps and shower screen onto sound existing tiling transforms how a bathroom looks for a fraction of a full renovation. It only works if the tiles are sound and the waterproofing underneath has not failed, and you will usually be left with holes where the old fittings were. We will tell you honestly at the survey whether your bathroom is a candidate.
In Catalonia it is a comfort item rather than a heating strategy — the winters are short, but a tiled floor is cold underfoot in February and an electric mat is cheap to install while the floor is already up. It is the one upgrade that is genuinely much cheaper now than later, so we price it as an option rather than leaving it out. See heating if you are rethinking the whole property.
For a bathroom where partitions, structure and façade stay as they are, the lightest route your council provides is normally enough (a responsible declaration, an assabentat or a simplified prior notification, depending on the municipality), and we file it as part of the job. Moving partitions or working in a protected building calls for a higher-level procedure. It becomes a bigger piece of paperwork if you are creating a new bathroom where there was not one, because that can change the habitability certificate. We tell you which one you are in before you commit.
In stages tied to completed work: a deposit on signing, a payment once the services and waterproofing are in, and the final payment at handover after the leak test. Never the whole amount up front.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia and a fixed written quote. We reply within 24 hours.