Property type · Barcelona

Luxury penthouse renovations in Barcelona

A penthouse is a top-floor flat taken to its limit: a designed interior, integrated technology and a terrace that lives like another room. We renovate high-end penthouses where detail and discretion are everything.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Penthouse renovation

A top-floor flat in another league.

A penthouse shares with any top-floor flat the last storey and the terrace, but it plays in another league: a designed interior, fine materials and an impeccable standard of living. It is not a good renovation. It is a full interior design project where nothing is left to chance, from the grain of the stone to the way the lights come on when you walk in.

The terrace stops being an outdoor space and becomes an open-air living room: an outdoor kitchen, a lounge, perhaps a hot tub or a plunge pool, lighting in scenes and carefully chosen planting, with the Barcelona skyline as the backdrop. Inside, a designed kitchen with an island, fine materials, architectural lighting and a home automation system that disappears into the building.

High-end work asks for two further things: discretion and reliability. We coordinate designers, specialist trades and premium suppliers under one site manager, with complete confidentiality and the dates and finishes agreed in writing. For the general approach to high-end projects, see luxury renovations; for an ordinary top-floor flat, top-floor flats.

Bathroom of a luxury flat under construction, with a freestanding carved stone basin, chrome wall-mounted tap, wall-hung toilet and unfinished garnet walls
How it runs

Renovating a penthouse, phase by phase.

Six to twelve months on site, with a long design period before it. The roof and the structure decide what the terrace can do.

01

Private survey and design

We visit in confidence and assess the flat, the terrace and the structure, then work with the interior designer on concept, materials and lighting.

02

Committed quote and discretion protocol

Itemised quote, programme committed in writing, and a discretion protocol covering staff and access.

03

Demolition, structure and roof

Selective demolition, structural strengthening and large openings, and the roof and terrace waterproofing and insulation that everything on the terrace depends on.

04

Services and integrated control

Air-source heat pump, radiant heating and cooling, lighting scenes, sound, security and app control, with invisible cabling and a separate circuit and water supply for the terrace.

05

Fine materials and bespoke joinery

Stone, timber and large-format surfaces, a designed kitchen with an island, spa-level bathrooms and made-to-measure joinery.

06

The terrace as a room

Outdoor kitchen, lounge, shade, scene lighting and, where the structure allows, a hot tub or small pool.

07

Commissioning and handover

The control system is commissioned with you, the design is snagged against the drawings, and the warranty is handed over.

How we work

How we run a penthouse project.

01

A private first visit

We visit in confidence and listen to what you want the home to feel like. No marketing follow-up.

02

Design and a committed quote

We work with your designer or propose one, coordinate premium suppliers and commit the price and the programme.

03

Execution, watched closely

One site manager coordinates every trade and checks the detail, respecting your privacy and the building’s.

04

Turnkey handover

Technology tuned, interior finished and a written warranty in place.

Why us

Why penthouse owners use us.

Design realised faithfully

We build your designer’s scheme as drawn, and raise anything that will not work on site before it becomes expensive.

A terrace engineered to be lived on

Waterproofing, structure, drainage and services for the terrace are designed in from the start, so it can carry what you plan to put on it.

Invisible technology

Lighting scenes, climate, sound and security from premium systems, with cabling you never see.

Detail as the deliverable

Junctions, reveals and bespoke joinery at millimetre tolerances.

Absolute discretion

Identified staff, controlled access and total respect for your privacy and the building’s.

Committed dates

A written programme and coordinated suppliers to keep it.

Prices

What a penthouse renovation costs.

Per square metre of interior floor area, VAT excluded. The terrace is quoted separately.

What a penthouse renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
High specificationStandard finishes, practical solution1,500 – 2,200 €/m²
Fully bespokePremium materials and high-end interior designFrom 3,000 €/m²
Indicative prices · VAT not included. The price sits in bespoke joinery and stone, integrated services and the terrace. An outdoor kitchen, a hot tub, scene lighting and planting are all quoted as separate items, so you can see what each part of the scheme costs and where to economise if you need to.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate120,000 – 176,000 €High specification · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of penthouse.

Indicative ranges for a complete high-end renovation, VAT excluded.

PenthouseUp to 120 m²From 180,000 €

A fully designed interior, integrated technology and fine materials. The terrace is designed as another room.

Large penthouse120 – 200 m²From 300,000 €

Several suites, a designed kitchen with an island, architectural lighting and a large terrace.

Luxury penthouseOver 200 m²Bespoke

Wellness, a home cinema and a wraparound terrace. The figure is set in the design stage.

Terrace as a roomKitchen · lounge · hot tubFrom 40,000 €

Outdoor kitchen, hot tub or plunge pool, pergola and scene lighting, quoted separately.

Anything heavy on a roof terrace — a hot tub, a plunge pool, a mature tree — needs the structure assessed and, usually, strengthened before it is specified, and it is the first question we ask. The building may also restrict what you can put on a terrace that is common property for your private use, and we check that at the survey.

No small print

What is included and what is not.

The scope of a turnkey penthouse renovation, and what normally sits outside it.

✓ Included in the price

  • Coordination with your interior designer and premium suppliers
  • Selective demolition, strengthening and large openings
  • Roof and terrace waterproofing and insulation
  • Air-source heat pump, radiant heating and cooling
  • Lighting design, scene control and invisible cabling
  • Fine materials, bespoke joinery, designed kitchen and bathrooms
  • Permit filing and technical supervision
  • Commissioning of the control system
  • A written warranty on the work
  • Discretion protocol

✕ Not included — quoted separately

  • Interior design fees, if commissioned as a separate service
  • Art, premium appliances and AV equipment not itemised in the quote
  • Outdoor kitchen, hot tub or plunge pool, unless itemised
  • Structural strengthening for heavy terrace loads, quoted once calculated
  • Council taxes and fees
  • Furniture and styling

VAT is shown as its own line. On a high-end penthouse the share of materials often takes the job past the 40% threshold on which the reduced rate depends, so we assess it explicitly rather than assuming 10%.

Where we work

Where we renovate penthouses.

Penthouses in Barcelona and along the coast. Find your area.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What penthouse owners ask before appointing a contractor.

How is a penthouse different from an ordinary top-floor flat?

Both are on the top floor with a terrace, but a penthouse is specified and executed at a higher level: a designed interior, fine materials, integrated technology, and a terrace treated as a room. The difference is not just price. It is the coordination of design, specialist trades and suppliers, the standard of detailing and the discretion. See top-floor flats for the standard case.

Do you work with my interior designer, or do you propose one?

Both. If you have a designer we build their scheme as drawn, coordinating all trades and suppliers. If you do not, we introduce designers we have worked with. Either way, one site manager is accountable for the result matching the drawings.

Can you install high-end home automation?

Yes. Lighting scenes, climate, sound, blinds and security from premium systems, with the cabling designed in at first fix so nothing is surface-mounted later. We treat the control layer as replaceable and the cabling as permanent, which is what keeps the system useful after the first generation of apps has been superseded.

How do payments and confidentiality work?

Payments are staged against verified work, with long-lead procurement handled transparently. Never the full amount in advance. Confidentiality is handled by a discretion protocol: identified staff, controlled access and total respect for your privacy. If you would like a confidentiality agreement, raise it when you enquire and we will discuss it.

Can I have a hot tub, plunge pool or outdoor kitchen on the terrace?

Often, but only after the structure has been assessed. A hot tub or plunge pool is a heavy concentrated load, and the roof slab may need strengthening, plus power, water and drainage. The building may also restrict what you can do on a terrace that is common property. We check both at the survey and tell you honestly what is feasible.

How long does a penthouse renovation take?

Six to twelve months on site, with a design period of three to five months before it. The dates hold when the design is finished before demolition begins and long-lead items are ordered against the programme.

Do you handle the roof and terrace waterproofing as part of the job?

Yes, and it comes first. Every outdoor feature depends on the membrane underneath it, so the roof and terrace are waterproofed, insulated and flood-tested before anything is built on top. See terrace renovation.

Free quote

Discuss your penthouse in confidence.

A private survey, a discretion protocol and a committed programme. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →