Renovations · El Masnou

Full home renovations in El Masnou: summer villas, flats beside the N-II and hillside houses

We renovate in this small, steep town of the Maresme, between the mountains, the N-II and the sea: summer villas of the Barcelona bourgeoisie, flats from the sixties and seventies and hillside houses. Before designing anything we check whether the building has protection, whether the façade faces the N-II or the railway and how much slope there is up to the door. A fixed written quote and one site manager from start to finish.

Since 2010Free technical visitItemised quoteWarranty on the work

Fixed written quote
El Masnou
El Masnou
Fixeda written, itemised quote
1 site managera single point of contact for the whole renovation
Freetechnical visit in El Masnou
Warrantyon the work
Renovations in El Masnou

Renovating in El Masnou,
with no surprises.

El Masnou is a small, steep municipality: the Serralada Litoral comes down almost to the coast, the N-II runs through the whole town and the train stops at two stations, El Masnou and Ocata. What mixes here are the summer villas that the Barcelona bourgeoisie built in the nineteenth century, the odd indiano house (built by an emigrant returned from the Americas) and the flats that came with the population jump of the sixties and seventies. Renovating here starts with protection, noise, the slope and the salt air of the first line. We know that housing stock, with a fixed quote and a single site manager.

  • Fixed quote before we start
  • A dedicated site manager on your renovation
  • Completion date in writing
  • Full handling of licences and permits
Living room with orange painted walls, tiled column and niche, floor with protective tape
Who it is for

Full renovations built around you.

These are the people we mostly work with in El Masnou. If you recognise yourself in one of them, we are a good fit:

Owners buying an older home

You have just bought — or are about to — an older building or house and want to make it yours, with new services and no surprises.

Families who want to re-plan their home

You need more light, one more bedroom or an open kitchen: we reorganise the layout so the house fits the way you live.

Investors looking to add value

You buy to renovate and sell or to let: we balance cost and finishes to get the most value out of the property.

Second-home owners

You are preparing a holiday home or a rental: a durable, low-maintenance renovation, with the habitability certificate and the energy certificate in order.

By type of building

Every house in El Masnou calls for a different renovation.

Every type of home asks for a different renovation. We fit the job to what your building really needs, not to a generic script.

01

Summer villas and the odd indiano house

Summer houses from the late nineteenth and early twentieth centuries. First we find out whether the building has any form of protection; then we restore what deserves restoring and update the rest.

02

Home with windows facing the N-II or the railway

The road runs through the whole town and the train stops at two stations: if your window faces either of them, acoustic joinery with a vent comes before the kitchen. On the front line, ironmongery and railings chosen for the salt air.

03

Hillside house in the upper part

The streets climb towards the mountains: we work out where the lorry can park, what has to be retained and what state the roof is in. In these houses logistics weighs as much as the finishes.

04

Flat from the sixties and seventies

The blocks of that period have already passed the age at which the ITE (the mandatory building inspection) is due, forty-five years. In order: electrics, down-pipes and slab, and then the design.

How we work

How we work with you.

01

A survey wherever you are

We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.

02

Design and a fixed quote

A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.

03

Council paperwork

We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.

04

Works under a site manager, with a warranty

One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.

Why Tu Nuevo Piso

Why renovate with us in El Masnou.

We know the housing stock here

From the stone masía to the flat of the 1970s: we know what each type of building in El Masnou hides and what has to be renewed whatever happens.

Planning rules and the council

We file works notifications and licences with the relevant council, and coordinate with the community when common elements or the façade are touched.

A dedicated site manager

A single contact for the whole renovation, with regular photos and video of progress. No chasing five trades.

Fixed quote

A fixed price broken down item by item after the survey. What we sign is what you pay, with no last-minute extras.

Trusted trades in the area

Bricklayers, plumbers, electricians and joiners we already know, under one contract and one programme.

Warranty and technical support

A written warranty on the work, with a registered technical architect when the project needs one.

Prices

What it costs to renovate in El Masnou.

Indicative ranges in El Masnou, based on real quotes. The final price is always a fixed quote after the visit.

An 80 m² flat41,300 – 52,100 €3 bedrooms, a bathroom, a WC and a kitchen · 520–650 €/m² · VAT not included
A 120 m² house70,100 – 88,600 €4 bedrooms, 2 bathrooms and a kitchen · 580–740 €/m² · VAT not included
What it costs to renovate in El Masnou — Indicative prices · VAT not included
Quality levelWhat it coversPrice per m²
Basic / functionalStandard finishes, layout unchanged520 – 650 €/m²
High-end / luxuryPremium materials and exclusive interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. Not a binding offer: the definitive quote, fixed and broken down item by item, is always given after the free technical visit.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Basic / functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

What changes the price of a renovation in El Masnou

Two homes of the same size can cost very different amounts. Beyond the €/m², these are the factors that move the price most:

Condition of the services

Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.

Age of the building

In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.

Changes to the layout

Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.

Quality of the materials

The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.

Permits needed

A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.

Access to the site

Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.

Councils and regulations

Licences and paperwork, sorted.

Every job has its own procedure: minor works notification, major licence, building inspection, habitability certificate… We deal with it all with the relevant council.

Works notification (minor works)

For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.

Major works licence

If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.

Building inspection (ITE)

The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.

Habitability and energy certificates

Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.

Reduced 10% VAT

On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.

Owners’ community

When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.

Grants

Grants for renovating in El Masnou.

If your renovation improves energy efficiency, you can recover part of the investment. We help you apply.

Next Generation funds

Grants for energy retrofits (insulation, windows, aerothermal heating), managed in Catalonia by ICAEN. We prepare the certificate and the application.

Agència de l’Habitatge de Catalunya

The Generalitat and the county councils publish calls for the renovation of homes and buildings. We assemble the technical documentation needed.

Income-tax deduction

For works that reduce the energy demand or consumption of the home. They apply according to the call and with the right documentation; we guide you.

What we renovate

Everything we renovate in El Masnou.

From the full renovation to a single trade. These are our most requested services.

See all services →
Where we work

Areas of El Masnou where we renovate.

We work across the whole area, with crews who know each type of home in El Masnou.

We renovate mainly in:

Centre

Summer villas and heritage such as the neoclassical Town Hall, the Modernista Casino or the Casa del Marquès del Masnou: the first thing is the building’s planning information.

Ocata and seafront

Ocata has its own station and, between the houses and the sea, run the N-II and the railway: acoustic windows and ironmongery that stands up to salt air.

Els Vienesos and El Masnou Alt

A sector that climbs towards the Serralada Litoral, with the most rugged terrain in the town: sloping streets, retaining walls and lorries that do not always reach the door.

Sant Felip

Residential housing with a renovation from start to finish.

And also in:

CentreOcataEls VienesosEl Masnou AltSant FelipLa Bòbila
Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

Everything you need to know about renovating in El Masnou: prices, licences, timescales and grants.

How much does it cost to hire a renovation company in El Masnou?

As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. A flat of 80–100 m² usually lands between 34,000 and 66,000 €. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.

How much does it cost to renovate a bathroom or a kitchen in El Masnou?

As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.

What does your fixed quote include?

Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.

How do you avoid cost overruns?

With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.

How long does a full renovation take?

A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.

Do you work with architects and handle the licences?

Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.

Do you offer a warranty?

Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.

Are there grants or subsidies for renovating in El Masnou?

Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.

Do you restore protected summer villas in El Masnou?

Yes. Before quoting we ask the Ajuntament for the building’s planning information to find out whether it has any protection. Then we restore protected galleries, sgraffito, mouldings and joinery, modernise services and comfort, and apply for the heritage authorisation at El Masnou’s Ajuntament.

How much does a full renovation in El Masnou cost?

The price of a full renovation in El Masnou is the one in the price section above, taken from our own quotes and excluding VAT. Near the sea we take care over joinery and ironmongery that stand up to salt air; the fixed figure comes from the free technical visit.

However it is searched for, is it the same service?

Yes: “full renovation in El Masnou” and “home renovation in El Masnou” are different ways of writing the same need, and all of them get the same quote fixed item by item after the free visit.

Free quote

Ask for your quote, no strings attached.

A free technical visit in El Masnou and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →