Buildings · Catalonia

Technical building inspection (ITE) in Catalonia

The ITE is mandatory for buildings of a certain age. A technician inspects the building and issues the report; if there are deficiencies, we tell you what works are needed and carry them out.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Technical building inspection

The inspection every older residential building must pass.

The ITE — Inspección Técnica de Edificios — is a mandatory inspection of residential buildings once they reach a certain age, repeated periodically. A technician examines the structure, the façade, the roof and the common services, records the condition and issues a report. It is an obligation of the comunidad de propietarios, the owners’ association, not of any single owner.

In Catalonia the general rule is that residential buildings must pass the ITE when they reach 45 years of age, and renew it periodically, although some councils have their own timetables. The practical question for an owners’ association is not whether to do it but what happens if the report finds problems. We confirm whether your building is already obliged.

The report classifies deficiencies by seriousness, from minor to very serious, and the association has to put them right within a set period. That is where the real cost lies. We carry out the inspection with registered technicians, and, if works are needed, quote and carry them out with technical direction until the building has the certificate. See façade restoration and works for residents’ associations.

Exposed hollow brick beside a pillar supported by a yellow prop
How it runs

An ITE, step by step.

The inspection takes days; any repair works take longer and are timed by the deficiencies found.

01

Check the obligation

We confirm whether your building is already required to pass the ITE and by when.

02

Inspection

A registered technician inspects the structure, façade, roof and common services.

03

Report

The official report, classifying any deficiencies by seriousness.

04

Filing

The report is submitted to the administration.

05

Works, if needed

A quote for the repairs and the programme for the owners’ meeting.

06

Repair

The deficiencies are put right, with technical direction.

07

Certificate

The certificate of fitness is obtained.

How we work

How we run an ITE.

01

Free discussion

We confirm your obligation. No cost and no obligation.

02

Fixed fee

A price for the inspection and the report, according to the size of the building.

03

Inspection and report

By a registered technician.

04

Works, if needed

A separate quote for any repairs.

Why us

Why use us for your ITE.

Registered technicians

The inspection and the report are signed by a competent professional.

We also do the repairs

If the report finds deficiencies, the same company can quote and carry them out.

A quote for the meeting

Itemised and comparable, so the owners can decide.

Help with support

We check which grants apply to the repair works.

Honest about what is urgent

We say which deficiencies must be dealt with first.

Clear fees

The inspection and the works priced separately.

Prices

What an ITE costs.

Fees for the inspection and report, VAT excluded. Repair works are separate.

What an ITE costs — Indicative prices · VAT not included
BuildingWhat it coversIndicative fee (€)
Small buildingStandard finishes, practical solution300 – 600 €
ITE plus repairsPremium materials and high-end interior designDepends on deficiencies
Indicative prices · VAT not included. The inspection and report cost depends on the size of the building. If the report finds deficiencies, the repairs are quoted separately, according to what has to be fixed. We give you both clearly so that the association can decide.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Full renovation · functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

By building

What it costs by size of building.

Indicative fees for the inspection and report, VAT excluded.

Small buildingUp to 8 homes300 – 600 €

Blocks of a few storeys. Inspection and official report.

Medium building8 – 20 homes500 – 1,200 €

The most usual case, with the report and its submission to the administration.

Large buildingOver 20 homesAsk us

Large blocks with more elements to inspect.

ITE plus repairsWith deficienciesDepends on works

The inspection plus the works needed to obtain the certificate of fitness.

The repairs an ITE leads to are usually the larger cost, and they are a shared one. Energy-efficiency and accessibility works done at the same time can attract support that reduces each owner’s share. We check what is open.

No small print

What is included and what is not.

The scope of an ITE, and what is separate.

✓ Included in the price

  • Check of the obligation and the deadline
  • Inspection by a registered technician
  • The official report
  • Submission to the administration
  • Advice on what is urgent
  • A quote for any repairs
  • Technical direction of repairs, if you instruct us
  • Obtaining the certificate

✕ Not included — quoted separately

  • The repair works themselves, quoted separately
  • Administration fees for filing
  • Scaffolding or access equipment, where billed separately
  • The administrator’s fees
  • Legal advice
  • Works inside private homes

VAT is shown as its own line — normally 21% on professional fees; repair works may qualify for a reduced rate.

Where we work

Where we carry out ITEs.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What administrators and owners ask about the ITE.

When is an ITE mandatory?

In Catalonia, as a general rule, a residential building must pass the ITE when it reaches 45 years of age and then renew it periodically, although some councils run their own timetables. We confirm whether your building is already obliged and by when.

What happens if the ITE finds deficiencies?

The report classifies them from minor to very serious, and the association is obliged to put them right within a set period. We tell you what works are needed, quote them, and carry them out with technical direction until the building obtains its certificate of fitness.

Who can carry out an ITE?

A competent registered technician, an architect or technical architect. We work with registered technicians who carry out the inspection and sign the official report, and we can also do any works.

How much does an ITE cost?

Roughly 300 to 600 € for a small building and 500 to 1,200 € for a medium one, excluding VAT. Larger buildings are quoted on request, and repair works are separate.

Are there grants for the repairs?

Sometimes, especially where the works include insulation or accessibility. Schemes change and are applied for by the community. We check what is open and prepare the documents, but we will not budget on a grant that is not available.

Free quote

Get an ITE for your building.

Free discussion anywhere in Catalonia. Inspection and report by a registered technician.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →