Building envelope · Catalonia

Window replacement and glazing in Catalonia

Changing the windows is the renovation you notice soonest and pay back soonest: less cold, less noise, a lower bill. And it is often done in a day, without building work, using the existing opening.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Windows and glazing

The fastest improvement a flat can have.

Old windows do three bad things at once: they leak air, they pass noise, and they let heat in and out through the glass and the frame. Replacing them fixes all three, and it is one of the few renovations you feel on the first night. In a city flat, the drop in street noise is often what people mention first.

The work is usually quick and clean. In most flats the new frames are fitted over the existing frame or in the existing opening, without removing the old surround or redoing the plaster, so a whole flat can be done in a day or two. That depends on the old frame being sound and on matching the opening, which we check at the survey.

The choices that matter are the frame material, the glass and the opening system. See aluminium joinery for the material question in detail, and energy efficiency for how windows fit into a larger plan. If the façade is protected or the windows are visible from the street, the community and sometimes the council have a say in what you can fit.

Empty room with oak parquet, a vertical white radiator and, on the right, a floor-to-ceiling French window with black frame
How it runs

Replacing the windows, step by step.

One to three days for a flat. Manufacturing takes two to six weeks beforehand.

01

Survey and measurement

We measure every opening exactly, check the old frames and agree frame, glass and opening types.

02

Order

Windows are made to measure, which takes two to six weeks.

03

Removal

Old sashes removed and, where possible, the frames retained.

04

Fitting

New frames fitted, levelled and sealed on all four sides.

05

Sealing and finishing

Silicone and trims, and making good internally.

06

Adjustment

Every opening checked and adjusted.

How we work

How we run a window project.

01

Free survey

We measure and show samples. No cost and no obligation.

02

Fixed quote

A price per window, itemised, with the glass specification written in.

03

Fitting

A clean, quick installation, usually in a day.

04

Handover and warranty

Warranty on the windows and the fitting.

Why us

Why replace your windows with us.

Measured exactly

A window that is a few millimetres out leaks air and sound. We measure every opening.

The right glass

Acoustic and thermal glass specified for your street and your orientation.

Quick and clean

Usually a day or two for a flat, without removing the surrounds.

Honest about frames

We explain PVC against aluminium for your situation, rather than selling the one we prefer.

Check on permissions

We check whether the façade or the community restricts what you can fit.

Warranty

On the windows and the fitting.

Prices

What new windows cost.

Per window, supplied and fitted, VAT excluded.

What new windows cost — Indicative prices · VAT not included
FrameWhat it coversPer window (excl. VAT)
PVCStandard finishes, practical solution350 – 700 €
Timber / mixedPremium materials and high-end interior design700 – 1,500 €
Indicative prices · VAT not included. The price per window depends on material, size, glass and opening system. Replacing every window in a flat works out cheaper per unit. Window replacement can qualify for support and a tax deduction for energy efficiency. Everything is itemised.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Full renovation · functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of job.

Indicative ranges, VAT excluded.

A few windows2 – 4 openings1,200 – 3,500 €

Replacing the windows of one façade or of the bedrooms. An immediate improvement.

Average flat5 – 8 openings3,000 – 7,000 €

Replacing every window in a flat. Comfort and savings jump.

Large homeOver 8 openingsFrom 6,500 €

Houses and large flats, often with big aluminium glazing.

Terrace enclosureGlass curtainFrom 250 €/m²

Closing a terrace or balcony with glass curtain or glazed enclosure.

On a street-facing façade, the community’s statutes and sometimes the council decide the colour and style of the windows you may fit. We check before we order, because a window that has to be replaced twice is a very expensive window.

No small print

What is included and what is not.

The scope of a window replacement, and what is separate.

✓ Included in the price

  • Survey and measurement of every opening
  • Windows made to measure
  • Removal of old sashes
  • Fitting, levelling and sealing
  • Handles, hinges and fittings
  • Making good internally
  • Adjustment of every opening
  • A written warranty

✕ Not included — quoted separately

  • Blinds and shutters, unless itemised
  • Redecoration of the surrounds
  • Removal of old frames where the whole surround must be taken out
  • Council fees where a licence is required
  • Works needing the owners’ association’s consent
  • Curtains and decoration

VAT is shown as its own line. Window replacement that improves energy efficiency can attract a reduced rate and an income tax deduction in some cases, and we tell you what applies when we quote.

Where we work

Where we replace windows.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about windows.

Can the windows be replaced without building work?

Usually, yes. The new frame is fitted over the old one or in the existing opening, without removing the surround or replastering. That makes a flat a one- or two-day job and keeps the dust down. It depends on the old frames being sound and the openings being regular, which we check at the survey.

PVC or aluminium?

Both are good when properly made. PVC insulates well and is the better value for most flats. Aluminium with a thermal break is slimmer, stronger and better for large glazed areas, and costs more. The decision is often about the look and the size of the opening rather than performance. See aluminium joinery.

Will it really show in my bill?

Yes, if the old windows were poor. Air leakage and heat loss through single glazing or a worn frame are a big part of a flat’s heating and cooling load. How much you save depends on the flat, the orientation and how you use it, so we do not quote a percentage, but the comfort improvement is immediate.

I live on a very noisy street. Is there a solution?

Yes — acoustic glass, with laminated panes and different thicknesses, in a well-sealed frame. It makes a large difference to traffic noise. We specify the glass for your street, and tell you honestly what to expect.

How much does it cost to replace the windows in a flat?

Roughly 3,000 to 7,000 € for an average flat of five to eight openings, excluding VAT. A few windows cost 1,200 to 3,500 €. The material and the glass move the figure most.

Can I close my terrace with a glass curtain?

Often, from about 250 €/m². It usually needs the community’s consent because it changes the façade, and sometimes a council licence. We check the rules for your building before you order.

Free quote

Get a quote for your windows.

Free survey and measurement anywhere in Catalonia. A price per window, itemised.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →