Renovations · Tarragona

Full home renovations in Tarragona: Roman Part Alta, Eixample and neighbourhoods

We renovate across the city: the Roman and medieval Part Alta, the Rambla Nova Eixample, the fishing neighbourhood of the Serrallo and the residential neighbourhoods. From heritage to the flat to renew. A fixed written quote and one site manager from start to finish.

Since 2010Free technical visitItemised quoteWarranty on the work

Fixed written quote
Tarragona
Tarragona
Fixeda written, itemised quote
1 site managera single point of contact for the whole renovation
Freetechnical visit in Tarragona
Warrantyon the work
Renovations in Tarragona

Renovating in Tarragona,
with no surprises.

Tarragona keeps one of the most important Roman ensembles in Europe (a World Heritage Site): the Part Alta — wall, cathedral, medieval centre — is heavily regulated and any job may run into archaeological remains. Around it, the Eixample of the Rambla Nova, the fishing Serrallo and the neighbourhoods of the expansion. We know that housing stock and its regulations, with a fixed quote and a single site manager.

  • Fixed quote before we start
  • A dedicated site manager on your renovation
  • Completion date in writing
  • Full handling of licences and permits
Archway with rope pendant light and wooden ladder during works in an old flat in Barcelona
Who it is for

Full renovations built around you.

These are the people we mostly work with in Tarragona. If you recognise yourself in one of them, we are a good fit:

Owners buying an older home

You have just bought — or are about to — an older building or house and want to make it yours, with new services and no surprises.

Families who want to re-plan their home

You need more light, one more bedroom or an open kitchen: we reorganise the layout so the house fits the way you live.

Investors looking to add value

You buy to renovate and sell or to let: we balance cost and finishes to get the most value out of the property.

Second-home owners

You are preparing a holiday home or a rental: a durable, low-maintenance renovation, with the habitability certificate and the energy certificate in order.

By type of building

Every building in Tarragona calls for a different renovation.

Every type of home asks for a different renovation. We fit the job to what your building really needs, not to a generic script.

01

Part Alta buildings

A heavily protected Roman and medieval centre, with a wall and possible archaeological remains: careful restoration, heritage paperwork and narrow access.

02

Eixample buildings (Rambla Nova)

Early-twentieth-century housing with high ceilings and mouldings: we renew services and layout while keeping what gives value.

03

Houses in the Serrallo and fishing neighbourhoods

Houses between party walls beside the fishing port, with old structure and damp.

04

Flats in residential neighbourhoods

Sant Pere i Sant Pau, Bonavista, Torreforta: housing of the expansion with services to renew.

How we work

How we work with you.

01

A survey wherever you are

We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.

02

Design and a fixed quote

A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.

03

Council paperwork

We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.

04

Works under a site manager, with a warranty

One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.

Why Tu Nuevo Piso

Why renovate with us in Tarragona.

We know the housing stock here

From the stone masía to the flat of the 1970s: we know what each type of building in Tarragona hides and what has to be renewed whatever happens.

Planning rules and the council

We file works notifications and licences with the relevant council, and coordinate with the community when common elements or the façade are touched.

A dedicated site manager

A single contact for the whole renovation, with regular photos and video of progress. No chasing five trades.

Fixed quote

A fixed price broken down item by item after the survey. What we sign is what you pay, with no last-minute extras.

Trusted trades in the area

Bricklayers, plumbers, electricians and joiners we already know, under one contract and one programme.

Warranty and technical support

A written warranty on the work, with a registered technical architect when the project needs one.

Prices

What it costs to renovate in Tarragona.

Indicative ranges in Tarragona, based on real quotes. The final price is always a fixed quote after the visit.

An 80 m² flat41,300 – 52,100 €3 bedrooms, a bathroom, a WC and a kitchen · 520–650 €/m² · VAT not included
A 120 m² house70,100 – 88,600 €4 bedrooms, 2 bathrooms and a kitchen · 580–740 €/m² · VAT not included
What it costs to renovate in Tarragona — Indicative prices · VAT not included
Quality levelWhat it coversPrice per m²
Basic / functionalStandard finishes, layout unchanged520 – 650 €/m²
High-end / luxuryPremium materials and exclusive interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. Not a binding offer: the definitive quote, fixed and broken down item by item, is always given after the free technical visit.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Basic / functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

What changes the price of a renovation in Tarragona

Two homes of the same size can cost very different amounts. Beyond the €/m², these are the factors that move the price most:

Condition of the services

Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.

Age of the building

In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.

Changes to the layout

Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.

Quality of the materials

The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.

Permits needed

A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.

Access to the site

Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.

Councils and regulations

Licences and paperwork, sorted.

In the Part Alta the work lives alongside Roman heritage and protection, and may require archaeological monitoring; in the rest of the city, the usual procedure. We handle everything with the Ajuntament.

Works notification (minor works)

For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.

Major works licence

If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.

Building inspection (ITE)

The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.

Habitability and energy certificates

Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.

Reduced 10% VAT

On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.

Owners’ community

When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.

Grants

Grants for renovating in Tarragona.

If your renovation improves energy efficiency, you can recover part of the investment. We help you apply.

Next Generation funds

Grants for energy retrofits (insulation, windows, aerothermal heating), managed in Catalonia by ICAEN. We prepare the certificate and the application.

Agència de l’Habitatge de Catalunya

The Generalitat and the county councils publish calls for the renovation of homes and buildings. We assemble the technical documentation needed.

Income-tax deduction

For works that reduce the energy demand or consumption of the home. They apply according to the call and with the right documentation; we guide you.

What we renovate

Everything we renovate in Tarragona.

From the full renovation to a single trade. These are our most requested services.

See all services →
Pages for this city

Services with a page of their own in Tarragona.

How we handle each of these services in Tarragona, with prices and examples from the area.

Where we work

Tarragona neighbourhoods where we renovate.

We work across the whole area, with crews who know each type of home in Tarragona.

We renovate mainly in:

Part Alta

Protected Roman and medieval centre: careful restoration, with archaeology and heritage paperwork.

Eixample (Rambla Nova)

Buildings of character from the early twentieth century that we renovate while keeping mouldings and galleries.

El Serrallo

Fishing neighbourhood by the port with houses of old structure to restore.

Sant Pere i Sant Pau

Residential neighbourhoods where we renew services and efficiency.

And also in:

Part AltaEixampleRambla NovaEl SerralloSant Pere i Sant PauBonavistaTorrefortaNou Eixample
Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

Everything you need to know about renovating in Tarragona: prices, licences, timescales and grants.

How much does it cost to hire a renovation company in Tarragona?

As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. An Eixample flat of 80–100 m² usually lands between 32,000 and 62,000 €; restoring a Part Alta building goes higher. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.

How much does it cost to renovate a bathroom or a kitchen in Tarragona?

As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.

What does your fixed quote include?

Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.

How do you avoid cost overruns?

With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.

How long does a full renovation take?

A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.

Do you work with architects and handle the licences?

Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.

Do you offer a warranty?

Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.

Are there grants or subsidies for renovating in Tarragona?

Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.

Can you renovate in Tarragona’s Part Alta?

Yes, with the care it demands. It is a setting of heavily protected Roman and medieval heritage, where a job can come across archaeological remains: we coordinate with the heritage authorities, apply for the authorisations and plan access along narrow streets.

Do you keep the features of Eixample buildings?

Yes. When the building has mouldings, encaustic tiles, galleries or joinery of value, we decide with you what is restored and what is modernised, and we apply for the authorisation if anything is protected.

How much does it cost to renovate a home in Tarragona?

What a home renovation costs in Tarragona is in the price section above, excluding VAT. In the Part Alta the reading of the building is added; in Ponent, the renewal of services. A quote fixed item by item after the free visit.

However it is searched for, is it the same service?

Yes: “home renovation in Tarragona” and “full renovation in Tarragona” are different ways of writing the same need, and all of them get the same quote fixed item by item after the free visit.

Do you carry out the complete renovation of commercial units in Tarragona?

Yes. The complete renovation of commercial units in Tarragona includes fitting out services, accessibility and ventilation, smoke extraction if the business needs it, and the activity licence or the notification at the Ajuntament. We coordinate it with registered technicians and a single site manager, with a fixed quote.

Free quote

Ask for your quote, no strings attached.

A free technical visit in Tarragona and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →