What renovation can you do with your budget: 10,000 € to 150,000 €
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
What renovation can I do with my budget, between 10,000 € and 150,000 €?
About 10,000 € buys one wet room: a complete bathroom at functional specification (9,500-13,000 €) or a functional kitchen (4,800-7,500 €). A flat of 60 m² or more starts at 34,400 € at functional level and, at high specification, reaches 154,600 € at 120 m². Indicative prices · VAT not included; not a binding offer.
A budget doesn't decide whether you renovate. It decides how much you renovate. Between 10,000 and 150,000 € what changes is the scope, from a single room to a whole flat or a house. This guide steps through it, using the figures already published on our price pages.
Key takeaways
- Every figure here excludes VAT: 10,000 € before VAT becomes 11,000 € at the 10% rate and 12,100 € at 21%.
- Up to 20,000 € buys one wet room: a bathroom or a kitchen, depending on the specification.
- From 30,000 to 50,000 € you can do a bathroom and a kitchen together or, from 34,400 €, a flat of 60 to 70 m² at functional level.
- From 75,000 to 150,000 € you are in flat territory for 80 to 120 m² at mid-range or high specification, or in house territory.
- Plan with the top of the range: ours runs to 20% above the calculated total.
Indicative prices · VAT not included. Not a binding offer.
Your budget and our figures don't count the same euro
Every figure in this guide is before VAT, so the first job is to separate the base from the tax. Spain's general rate is 21% and the reduced rate is 10%. In exact numbers: 10,000 € before VAT becomes 11,000 € at 10% and 12,100 € at 21%. If your ceiling is the total you will actually pay, the base you can contract is smaller.
The 10% rate isn't automatic. Article 91.Uno.2.10º of the VAT law (Ley 37/1992) applies it to renovation and repair works on homes when three conditions are met:
- The client is a private individual using the home for personal use, or an owners' community.
- The home's construction or refurbishment was completed at least two years before the works start.
- The contractor supplies no materials or, if they do, their cost doesn't exceed 40% of the taxable base.
Royal Decree-law 29/2026, published in the BOE on 7 October 2026, amends that paragraph with effect from 1 December 2026. Its wording also covers homes let as a main residence and makes the reduced rate conditional on payment by card, bank transfer, named cheque or deposit into a bank account.
Like any royal decree-law, it has to be validated by the Congress of Deputies, so check the BOE for the text in force on the day you sign. This is a summary, not tax advice. Ask for the VAT rate to be written into the quote.
What each piece costs, from our price pages
Our ranges come from an example budget calculated line by line, with 5% below and 20% above the total. It's lopsided on purpose: the real figure depends on the condition of the home, and it's better for the quote to land under what you expected than over.
| Room | Functional | Mid-range | Design or high specification |
|---|---|---|---|
| Complete bathroom | 9,500-13,000 € | 14,600-19,800 € | 18,800-26,000 € |
| Complete kitchen | 4,800-7,500 € | 6,600-10,300 € | 13,300-19,500 € |
Indicative prices · VAT not included. Not a binding offer: the fixed figure comes after the free technical visit.
| Surface | Functional | Mid-range | High specification |
|---|---|---|---|
| 60 m² | 34,400-43,500 € | 49,900-63,000 € | 71,500-90,300 € |
| 80 m² | 41,300-52,100 € | 59,700-75,300 € | 85,000-107,300 € |
| 100 m² | 56,100-70,800 € | 81,500-103,000 € | 113,200-143,000 € |
| 120 m² | 61,100-77,200 € | 88,500-111,800 € | 122,400-154,600 € |
Indicative prices · VAT not included. Not a binding offer: the fixed figure comes after the free technical visit.
Two things stand out in the tables. A complete functional bathroom already starts at 9,500 €, which is why a whole flat can't fit into 10,000 €. And at 100 m² the flat is planned with four bedrooms and two full bathrooms, which is why the price per metre rises again.
From 10,000 to 20,000 €: one wet room, done properly
With 10,000 € before VAT you choose one room, not a flat. A complete functional bathroom costs 9,500-13,000 € (for a 3 m² bathroom, 9,500-12,000 €) and a functional kitchen 4,800-7,500 €. Together they already go over that figure.
If the bathroom and kitchen are fine, you can spend the 10,000 € on single line items for the flat. The table shows the ones from our example 80 m² flat, each at its own specification. In a flat of another size, the items that depend on surface area change, such as flooring and painting.
| Line item | Functional | Mid-range | High specification |
|---|---|---|---|
| Flooring throughout (AC5 timber laminate) | 2,960 € | 3,440 € | 3,840 € |
| Internal joinery (7 doors) | 1,750 € | 4,025 € | 5,460 € |
| Windows (5 units) | 2,765 € | 5,750 € | 11,080 € |
| Skimming and full repaint (about 240 m² of wall and ceiling surface) | 9,120 € | 12,000 € | 12,240 € |
Indicative prices · VAT not included. Not a binding offer: the fixed figure comes after the free technical visit.
Look at the last row: skimming and repainting a whole flat comes close to 10,000 € on its own at functional level (9,120 €). That budget won't cover repainting everything and also changing the floor and the doors. You have to choose what you'll notice most.
At 20,000 € the choice opens into three routes. A mid-range bathroom (14,600-19,800 €). A design or high-specification kitchen (13,300-19,500 €). Or a functional bathroom and a functional kitchen together, the route that depends most on size: if both rooms land at the bottom of their ranges it fits, and if they land at the top it doesn't.

From 30,000 to 50,000 €: two rooms, or a small flat
At 30,000 € a full renovation of a flat of 60 m² or more doesn't fit: at functional level it runs between 34,400 and 43,500 € already at 60 m². What does fit is two rooms.
A mid-range bathroom and kitchen (14,600-19,800 € and 6,600-10,300 €), or a design bathroom (18,800-26,000 €) with a functional kitchen (4,800-7,500 €). In both pairings the top ends added together pass 30,000 €.
At 50,000 € a whole flat is possible at functional level. The 60 m² flat (34,400-43,500 €) and the 70 m² flat (36,900-46,600 €) fit with room to spare. The 80 m² flat (41,300-52,100 €) just about makes it, because the top of its range is over the ceiling. And a mid-range 60 m² flat (49,900-63,000 €) starts right at the edge, leaving no cushion.
Before you divide the money, decide what you will do with the bathroom and the kitchen, because that is where a large part of the total goes. That answer shows what fits now and what waits for a second phase.
From 75,000 to 150,000 €: the mid-range flat, the house and high specification
At 75,000 € you can already do the 100 m² flat at functional level (56,100-70,800 €) and the 80 m² flat at mid-range (59,700-75,300 €), the latter right at the ceiling. A single-storey 80 m² house at functional level (50,600-63,900 €) also fits, with the roof included in the example budget.
Up to 100,000 € mid-range reaches the 100 m² flat (81,500-103,000 €), although the top of its range is over, and a 120 m² house at functional level (70,100-88,600 €) fits comfortably. The 80 m² flat at high specification (85,000-107,300 €) straddles the ceiling.
And at 150,000 € high specification opens up. The 100 m² flat (113,200-143,000 €) fits and the 120 m² flat (122,400-154,600 €) touches the ceiling. Among houses, the 120 m² house at mid-range (103,600-130,900 €) and the 150 m² house (116,400-147,100 €) both fit. On our pages, high specification means premium materials and interior design.
Indicative prices · VAT not included. Not a binding offer: the fixed figure comes after the free technical visit.
How to stretch the budget without cutting what you can't see
Real savings come from what you keep, not from what you cheapen. In the example 80 m² flat, if your current windows insulate well, the windows line disappears: 2,765 € at functional level and 11,080 € at high specification. Lacquering the doors you already have shrinks the joinery line, and polishing a sound original floor costs less than lifting it.
Keeping the kitchen and bathroom where they are also helps: if the soil stacks and water connections stay put, the plumbing and the building work get clearly cheaper.
What you don't cut is what you can't see: bathroom waterproofing, new water and electrical installations, the lintel if a load-bearing wall is opened, and site management. Those are the items you don't want to have to redo.
Phasing the work doesn't make the metre cheaper either. It spreads the cost, and you save a temporary rental. Bathroom and kitchen, though, go in a single phase with a fixed date.
And leave out of the sum whatever no range includes: VAT, the council's licence fees, loose furniture, lamps, decoration, and any extra work you ask for once the renovation is under way, which is priced separately and signed before it starts.
Frequently asked questions about what your budget buys
What renovation can I do with 10,000 euros?
One room: a complete functional bathroom (9,500-13,000 €), a functional kitchen (4,800-7,500 €) or single line items of a flat, such as the floor or the doors. A whole flat doesn't fit. Indicative prices · VAT not included; not a binding offer. The fixed figure comes from the free technical visit.
Can I renovate a whole flat for 30,000 euros?
For a flat of 60 m² or more, not on our figures: at functional level it runs between 34,400 and 43,500 € before VAT already at 60 m². At 30,000 € the realistic plan is the bathroom and the kitchen, or one of the two at a high specification. Indicative prices · VAT not included; not a binding offer.
Should my renovation budget include VAT?
Count it from the start, because the figures in this guide exclude it. The general rate is 21%, and 10% if the conditions of Article 91.Uno.2.10º of Ley 37/1992 are met: a home completed at least two years ago, a private or community client, and the contractor's materials under 40% of the taxable base.
Is it worth phasing the renovation if the budget is tight?
You split the outlay, but you don't make the metre cheaper: living in the home, a good part of the hours goes on protecting it. Bathroom and kitchen are best done in one go, with a fixed date. And if you renew the installations across the whole home, doing it room by room stops being realistic.
How much margin should I leave over a quoted range?
Plan with the top of the range. Our ranges start 5% below the calculated total and run to 20% above, because the real figure depends on the condition of the home and the specification you choose. Indicative prices · VAT not included; not a binding offer.
Keep reading
Once you know which step is yours, these pieces follow the order in which the next questions usually come up.
- How we calculate our prices - where the ranges come from and how each one is built.
- How to split a renovation budget by trade - where the money goes once the total is set.
- How to read and compare a renovation quote - what to check when several offers are on the table.
- Bathroom renovations in Catalonia - what goes into each of the three bathroom specifications.
- Kitchen renovations in Catalonia - the same for the kitchen, with and without opening it to the living room.
- How much does it cost to renovate an 80 m² flat in Barcelona: the budget, item by item - the example flat in full, row by row.
- Work out the cost of your renovation - an estimate for your case before you ask for a fixed quote.
Sources
Keep reading
Full renovation quote: worked example and item-by-item breakdown
See a worked example of a full renovation quote for an 80 m² flat, broken down item by item, with costs, percentages and tips for 2026.
Prices and quotesFixed quote vs open quote in renovations: what it means and why it matters
Not sure whether to choose a fixed or open quote for your renovation? We explain the key differences, risks and advantages, and how to decide in 2026.
Prices and quotesLow-cost flat renovation in Barcelona: what to prioritise
Low-cost renovation does not mean shoddy work. It means setting priorities: investing where it matters, saving where it will not show, and avoiding the cuts that end up costing twice as much.

