Blog category

Prices and quotes

14 guides on prices and quotes.

Prices and quotes

Renovating a bathroom and kitchen at the same time: which items are shared

Combining bathroom and kitchen shares the paperwork, protection, rubble removal and cleaning. Both projects are still paid in full. Here is what counts in each case.

20 November 2026 · 6 min read
Prices and quotes

Functional, mid-range or high quality: what changes in each item of a renovation

Quality shows in what you see and touch, not in what is hidden. We show you, item by item, where the price rises and where spending more is not worth it.

16 November 2026 · 10 min read
Prices and quotes

Usable or built area: which one to use when budgeting your renovation

Floors, paint and tiling are measured inside the walls. If a quote uses the square metres on the deeds, its price per metre can no longer be compared.

5 November 2026 · 8 min read
Prices and quotes

Same square metres, double the price: the 6 factors that separate two quotes

Two quotes for the same flat almost never price the same job. These are the six factors that separate the price, each with its figure.

5 November 2026 · 6 min read
Prices and quotes

Which rooms make a renovation more expensive: bathrooms and kitchens versus bedrooms

A square metre of bathroom costs about 15 times a bedroom's, and a kitchen's about 3.5 times. Here is the calculation for each room, with the bedroom broken down.

4 November 2026 · 7 min read
Prices and quotes

How much does it cost to add a second bathroom to a flat (and where to put it)

2 m² cloakroom: 837-2,161 €. 4 m² full bathroom: 10,255-20,467 €. The toilet decides the location: the CTE allows it 1.00 m from the soil stack at most.

4 November 2026 · 11 min read
Prices and quotes

From 80 to 100 m²: what really changes in a renovation budget

From 80 to 100 m² the functional budget rises by 15,596 €. The extra 20 metres add 4,372 €; the second full bathroom adds 9,418 €. Here are the numbers.

3 November 2026 · 12 min read
Prices and quotes

Why renovating a small flat costs more per square metre

In a 50 m² flat the bathroom, kitchen and services make up 58% of the budget, so each metre costs 660 € against 506 € in a 90 m² flat.

3 November 2026 · 6 min read
Prices and quotes

Fixed and variable renovation costs: which items do not depend on floor area

Bathroom, kitchen and services do not depend on floor area and make up 46 to 58% of a renovation. They set the floor below which a budget cannot go.

2 November 2026 · 10 min read
Prices and quotes

Why a renovation does not cost double when the flat is twice the size

From 50 to 100 m² the budget rises 79%, not double. The price per metre falls from 660 to 506 € until a second bathroom lifts it back to 590 €.

2 November 2026 · 10 min read
Prices and quotes

What renovation can you do with your budget: 10,000 € to 150,000 €

10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.

31 October 2026 · 9 min read
Prices and quotes

Full renovation quote: worked example and item-by-item breakdown

See a worked example of a full renovation quote for an 80 m² flat, broken down item by item, with costs, percentages and tips for 2026.

24 July 2026 · 10 min read
Prices and quotes

Fixed quote vs open quote in renovations: what it means and why it matters

Not sure whether to choose a fixed or open quote for your renovation? We explain the key differences, risks and advantages, and how to decide in 2026.

9 July 2026 · 10 min read
Prices and quotes

Low-cost flat renovation in Barcelona: what to prioritise

Low-cost renovation does not mean shoddy work. It means setting priorities: investing where it matters, saving where it will not show, and avoiding the cuts that end up costing twice as much.

1 July 2026 · 4 min read
✆ Call✦ WhatsAppGet a quote →