Usable or built area: which one to use when budgeting your renovation

Floors, paint and tiling are measured inside the walls. If a quote uses the square metres on the deeds, its price per metre can no longer be compared.

By the Tu Nuevo Piso teamPublished 5 November 20268 min read
Laser measure projecting a red dot on the wall of an empty living room

Indicative prices · VAT not included. Not a binding offer.

Which area should you use to budget a renovation?

A renovation is priced on the usable area, because flooring, paint and tiling are measured inside the walls. The built area, which is the one the deeds and the cadastre usually give, includes the thickness of walls and partitions (and sometimes part of the communal areas), so it overstates what you are going to renovate.

The problem is not the two figures. It is a quote that gives a price per metre without saying which metres.

Key points

  • Usable area is the floor you can actually use inside the enclosing walls: the one measured for the habitability certificate and the one that is floored and painted.
  • The nota simple (land registry extract), the deeds and the cadastre usually give the built area, which is no use for measuring floors or paint.
  • The same 63,000 € quote is 700 €/m² on 90 m² built and 840 €/m² on 75 m² usable (illustrative example).

What each area measures and where it appears

There are three areas, and each document for the flat uses its own. What separates them is what is counted besides the floor you walk on.

AreaWhat it countsWhere you will see itWhat it is for on site
UsableThe floor that is actually usable inside the enclosing wallsHabitability certificate and site measurementsIt is the base for flooring, paint and tiling
BuiltThe usable area plus the thickness of walls and partitionsNota simple, deeds and cadastre, as a ruleIt gives an idea of the size of the flat, not of what is renovated
Built, including communal elementsThe built area plus a proportional share of the entrance hall, staircase and other communal areasThe same documents, when the figure includes communal areasNone: these are metres outside your front door

If you wonder which area the nota simple shows, it is usually the built area, the same one you will find in the deeds or the cadastre. And if the document does not make clear whether it includes communal areas, do not assume: ask before using that figure for anything.

The habitability certificate (cédula de habitabilidad) works differently: it counts usable metres, those of Decree 141/2012 on habitability. They are the same metres that will be floored and painted in your renovation.

Between one figure and the other is the thickness of the walls. A hollow-brick partition is around 7-10 cm, a plasterboard one takes up 7-13 cm depending on the system, and a load-bearing or façade wall in an older building usually runs from 15 to 30 cm, or more. That thickness counts in the built area, but it is not floored.

An example, not a rule: a 90 m² flat built may have 72-76 m² usable. We do not give a percentage difference because there is none that holds for every building; it depends on the partitions, the thickness of the walls and whether the figure includes communal areas.

How usable area is really measured

Usable area is measured room by room, from the inner face of one wall to the inner face of the other, and then added up. It is not obtained by subtracting something from the deeds: it is measured in the flat.

  1. Draw a sketch with all the rooms, without forgetting the corridor, the hallway and the corners you do not use.
  2. Measure each room at floor level, wall to wall, length and width, and multiply.
  3. If a room is L-shaped, split it into two rectangles and add the two.
  4. Note the clear height of each room: it gives you the metres of wall and ceiling.
  5. Add up all the rooms. That total is your approximate usable area.

Can you measure it yourself to ask for a quote? Yes, and it is worth doing. With a tape measure you have a reasonable figure for a first estimate and for spotting a quote that has gone wrong on metres. But it is not the figure for the fixed quote. With your measurements to hand, the renovation budget calculator explains how to turn them into a first estimate of the cost of renovating a flat.

Before quoting, we measure every room with a laser measure, because it almost never matches the deeds. And we do not measure only the floor.

For smoothing and painting, what counts is the wall and ceiling surface (paramento), that is, walls and ceilings. In our standard quotes by size, about 3 m² of wall and ceiling surface is calculated for every m² of floor: a 10 m² bedroom is about 30 m² of wall and ceiling. Those metres are what drive the painting item, and they do not appear on any document for the flat.

Thickness of an exterior wall at a window opening, shown with a tape measure
The thickness of walls and partitions is the difference between usable and built metres.

How the euro per metre changes with the base

The same quote gives two different prices per metre depending on whether you divide it by the built or the usable area. With usable area it comes out higher by pure arithmetic: the same euros, spread over fewer metres.

An illustrative example, with round figures and not a price of ours: a 63,000 € renovation in a flat of 90 m² built that has 75 m² usable.

CalculationResultWhat it means
63,000 € divided by 90 m² built700 €/m²Price per built metre
63,000 € divided by 75 m² usable840 €/m²Price per usable metre of the same quote
700 €/m² times 75 m² usable52,500 €Built price applied to usable metres: it comes out short
840 €/m² times 90 m² built75,600 €Usable price applied to built metres: it charges for metres that are not renovated

Guide prices · VAT not included. This is an example to understand the calculation, not a binding offer: the fixed price for your flat is set after the free technical visit.

The first two rows are the same quote. If one company tells you 700 €/m² and another 840 €/m², they may be asking for the same thing and the difference may be only the base. The last two are the mistake of mixing the price of one base with the metres of the other, and they throw the total out by thousands of euros, upwards or downwards.

But there is another reason to distrust the price per metre: a renovation is not charged per metre. In our price table, flooring and paint are priced per m², skirting per linear metre, doors and windows per unit and the complete bathroom as a project. The total is a sum of items; the euro per metre is a division done at the end.

What to ask for in writing in the quote

Ask for the quote to state which area it is measured on, how many metres each room has and how many metres of wall and ceiling will be treated. With those three things you can compare two offers fairly.

  1. The measurement base, in writing. Usable or built and, if built, with or without communal areas. If the document gives a price per metre and does not say on which metres, ask before signing.
  2. The area of each room. Living room, kitchen, each bedroom, bathroom and corridor, not just the total. That way you can check it yourself with the tape.
  3. The wall and ceiling measurements. The m² of wall and ceiling that are smoothed, painted or tiled, and whether doors and windows have been deducted.
  4. The unit of each item. Square metre, linear metre, unit or lump sum. A lump sum without measurements is the hardest to compare between two offers.

If you already have two quotes with different bases, do not compare their prices per metre. Compare the totals item by item, or divide both by the same usable area, the one you measured yourself. And if a company does not want to write down the measurement base, look at that quote very closely.

Frequently asked questions about usable and built area

Do the deeds give the usable area?

As a rule, the deeds, the nota simple and the cadastre give the built area, which includes the thickness of walls and partitions and, sometimes, part of the communal areas. If a document gives both, check which is which before using it. To budget the renovation, the reference is the usable area, measured room by room.

What is the difference between usable and built square metres?

Usable metres are the floor that is actually usable inside the walls. Built metres also add the thickness of walls and partitions and, in the built area including communal elements, a proportional share of the entrance hall, staircase and other communal areas. The exact difference depends on the building: a 90 m² built flat may have, for example, 72-76 m² usable.

Which area do companies use to quote a renovation?

Floors are measured in usable area, paint and tiling in metres of wall and ceiling, and doors and windows per unit. The confusion appears in the price per metre, which may be calculated on usable or on built area. Ask for the quote to state in writing which base it has used.

Can I measure the flat myself to ask for a quote?

Yes. Measure each room wall to wall, at floor level, multiply length by width and add them all up, corridor included. Note the height too, to calculate walls and ceilings. That figure is useful for requesting an estimate and for checking quotes; the final measurement is taken at the free technical visit, before the fixed quote.

If you are measuring your flat to ask for a quote, these articles follow the order in which questions tend to come up.

Sources