Why a renovation does not cost double when the flat is twice the size
From 50 to 100 m² the budget rises 79%, not double. The price per metre falls from 660 to 506 € until a second bathroom lifts it back to 590 €.

Indicative prices · VAT not included. Not a binding offer.
Does it cost double to renovate a flat with double the area?
No: renovating a flat with double the area does not cost double. In our standard budgets, going from 50 to 100 m² raises the total by 79% at functional quality and by 80% at medium quality, because the bathroom, the kitchen and the installations cost almost the same in a small flat as in a large one.
But the price per metre does not fall in a straight line either. It falls from 50 to 90 m² and, at 100 m², rises again, because a second full bathroom comes in. The two ideas that circulate, "the price is proportional to the metres" and "the bigger the flat, the cheaper the metre", are both wrong, and here are the numbers.
Key points
- With double the area, from 50 to 100 m², the functional budget rises 79%: from 32,982 € to 58,968 €, base without VAT.
- The price per functional metre falls from 660 € to 506 € between 50 and 90 m², and rises to 590 € at 100 m², where the standard budget includes two full bathrooms.
- Bathroom, kitchen, plumbing and electrics make up 58% of the functional budget at 50 m², 49% at 80 m² and 46% at 90 m².
- Price per metre only compares budgets for the same flat with the same scope; between different flats, compare totals and items.
The answer in data: seven standard budgets from 50 to 120 m²
With the same quality levels and the same criteria, the budget grows much less than the metres. These are our seven standard budgets for a full home renovation, the same ones we publish on the price-by-size pages: full bathroom, full kitchen, new installations, floors, doors, windows and painting.
| Area | Wet areas | Functional total | Medium total | €/m² functional | €/m² medium |
|---|---|---|---|---|---|
| 50 m² | 1 bathroom | 32,982 € | 47,689 € | 660 € | 954 € |
| 60 m² | 1 bathroom | 36,208 € | 52,467 € | 603 € | 874 € |
| 70 m² | 1 bathroom | 38,803 € | 55,984 € | 554 € | 800 € |
| 80 m² | Bathroom and WC | 43,372 € | 62,747 € | 542 € | 784 € |
| 90 m² | Bathroom and WC | 45,558 € | 65,453 € | 506 € | 727 € |
| 100 m² | 2 full bathrooms | 58,968 € | 85,767 € | 590 € | 858 € |
| 120 m² | 2 full bathrooms | 64,302 € | 93,140 € | 536 € | 776 € |
Guide prices · VAT not included. These are standard budgets, not a binding offer: the fixed quote for your flat comes after the free technical visit.
Be clear about what this table is and what it is not. These are standard budgets, not market averages: each has a defined scope (how many bathrooms, which kitchen, how many doors and windows) and is calculated with the items of our price table, which comes from real signed quotes. They help you see the shape of the curve and place your flat, not guess another company's figure.
Now read it from top to bottom. From 50 to 100 m² the area doubles and the functional total goes from 32,982 € to 58,968 €, 79% more. At medium quality, from 47,689 € to 85,767 €, 80%. The other pair that doubles the metres, from 60 to 120 m², rises 78% at both quality levels.
Never double. And not a clean fall in the price per metre either, which is what the two right-hand columns hide.
Why it rises less than the metres: what does not scale
It rises less because, in a small flat, more than half of the budget is items that do not depend on the metres. Full bathroom, full kitchen, plumbing and electrics add up to 58% of the functional budget at 50 m², 49% at 80 m² and 46% at 90 m².
The reason is practical, not accounting. A bathroom of about 4 m² has a toilet, basin, shower, tiling and waterproofing whether the flat is 50 m² or 90 m², and in our price table it comes to 10,255 € at functional quality (guide price, base without VAT) in both cases.
The kitchen works the same way. The full kitchen item gives the same figure for 6 m² as for 12 m², 5,518 € at functional quality; what changes with size is the units and worktop you choose, not the item.
What does grow with the area is what is priced per metre: flooring, levelling screed and painting, plasterboard, demolition and rubble removal. And that changes the value of the "extra" metre. From 50 to 90 m² the functional total rises 12,576 €, about 314 € for each added metre, while the first 50 metres cost 660 € each.
In one line: the entry metre carries the bathroom and the kitchen inside it, and the extra metre carries almost only finishes. Which item is fixed, which is variable and which grows in steps has its own article on fixed and variable costs, and so does the extreme case, the 50 m² flat that is expensive per metre.

Why the price per metre does not always fall: the jump at 100 m²
It does not always fall because, when the flat grows enough to take another wet area, that area again carries a whole fixed item. In our standard budgets, the price per functional metre goes from 506 € at 90 m² to 590 € at 100 m²: the 90 m² flat has a bathroom and a guest WC, and the 100 m² flat has two full bathrooms.
The numbers behind the jump, at functional quality and base without VAT:
- 90 m² flat: one full bathroom at 10,255 € plus a WC of about 2 m² at 837 €.
- 100 m² flat: two full bathrooms, 20,510 €.
- Difference in bathrooms alone: 9,418 €, for ten more metres of flat.
Those 9,418 € are not spread over the ten new metres, they are spread over the whole flat, and that is why they push the metre price up. Plumbing follows the same rule: it goes from 10 to 13 points, from 3,006 € to 3,786 € at functional quality, because there is one more bathroom to supply and drain, not because the flat is bigger.
The weight of the fixed items confirms it. It is 46% at 90 m², jumps to 54% at 100 m² and falls again to 49% at 120 m², with the same pair of bathrooms. At 120 m² the functional metre falls to 536 €, and it is still above the 506 € of the 90 m² flat.
So "the bigger, the cheaper" only holds while the number of bathrooms does not change. In our standard budgets that change falls between 90 and 100 m², exactly the range where one metre more or less seems not to matter. The comparison from 80 to 100 m², item by item, has its own article.
When €/m² misleads and what to look at instead
The price per metre misleads as soon as you compare two budgets that do not have the same scope. It works for comparing offers for the same flat with the same list of items; outside that, it measures the size and the number of bathrooms more than how expensive or cheap the company is.
When someone asks us on the first call "how much is the metre?", the first thing we do is ask what they want to do with the bathroom and the kitchen. It is not dodging the question: with those two answers the price per metre starts to mean something.
The four situations in which €/m² gives a false reading:
- Different area. A 50 m² flat at 660 €/m² and a 90 m² flat at 506 €/m² can be budgeted with the same criteria. The small one is not more expensive: it spreads the same fixed items over fewer metres.
- Different number of bathrooms. This is the jump at 100 m²: a second full bathroom changes the metre price more than ten metres of area.
- Different quality levels. The same 80 m² flat comes to 542 € per metre at functional quality and 1,117 € at high quality. With the same metres the price doubles, and that has its own factors.
- Different reference area. An example, not data: 700 €/m² on 90 m² built area is 63,000 €; the same 63,000 € on 75 m² usable area comes to 840 €/m². The work is identical, only the divisor changes.
What is useful lies elsewhere. Look at the total, the list of items and what is left out; count the wet areas in each offer, and check whether the budget measures in usable area or built area and whether the quality levels are described or only named. If that adds up, the price per metre is unnecessary. If it does not, the price per metre is distracting you.
How to use this to estimate your case
To estimate your renovation, start from the standard budget with the same number of bathrooms you will have, not the one with the closest area, and adjust it for what you will keep. There are five steps:
- Clarify which area you use. The deeds or the land registry usually give the built area, and flooring and painting are priced on the usable area. Use the same one when comparing and ask which unit each budget uses.
- Count wet areas. In our standard budgets, flats of 50 to 70 m² have one bathroom; those of 80 and 90 m², a bathroom and a WC; and those of 100 and 120 m², two full bathrooms.
- If you fall between two sizes with the same bathrooms, you fall between their totals. An 85 m² flat with a bathroom and WC sits between 43,372 € and 45,558 € at functional quality, and between 62,747 € and 65,453 € at medium.
- If you fall between two sizes with a different number of bathrooms, the bathroom decides. A 95 m² flat with a bathroom and WC is closer to the 90 m² type than to the 100 m² one, which carries a second full bathroom of 10,255 € at functional quality.
- Adjust. Subtract what you keep (windows, doors or flooring in good condition) and add what is particular to your flat: a load-bearing wall, original installations or a building without a lift.
Guide prices · VAT not included. No estimate is a binding offer; the fixed quote by items comes after the free technical visit.
With this you will have an honest range before calling anyone. What you will not have is what only shows with the wall open or the floor plan in front of you, and that is what the visit is for.
Frequently asked questions about renovation prices by area
How much does it cost to renovate a flat per square metre?
In our standard full renovation budgets, between 506 € and 660 € per m² at functional quality and between 727 € and 954 € at medium quality, for flats of 50 to 90 m² with one bathroom or a bathroom and WC. With two full bathrooms, at 100 m², it rises to 590 € at functional quality. These are guide prices, base without VAT; the fixed quote comes after the free technical visit.
Is it cheaper per metre to renovate a big flat?
Up to a point, yes. In our standard budgets the functional metre falls from 660 € at 50 m² to 506 € at 90 m², because bathroom, kitchen and installations are spread over more area. But at 100 m² it rises to 590 € because a second full bathroom comes in: the metre only gets cheaper while the number of wet areas does not change.
Why can't I compare two budgets of different areas by €/m²?
Because a large part of the budget does not depend on the metres. Bathroom, kitchen, plumbing and electrics make up 58% of the functional total in a 50 m² flat and 46% in a 90 m² one, so dividing by the area always penalises the small flat. Between different flats, compare totals, items and number of bathrooms.
Does the price per square metre include VAT?
In our figures, no: all prices in this article are guide prices and base without VAT, because the applicable rate depends on each case and is confirmed in writing in the quote. If you compare with another company, first check whether its price per metre includes VAT; if one includes it and the other does not, the comparison is already broken.
Further reading
These articles follow the order in which questions usually appear when someone starts working out costs per metre.
- Which part of a renovation is the most expensive - the same problem seen by item instead of by size.
- How to read and compare a renovation quote - how to put two offers side by side without €/m² misleading you.
- Cost of renovating a 50 m² flat (2026), by item - the smallest standard budget, with all its items.
- Renovating an 80 m² flat in Barcelona: 2026 price - the size with the best balance between bathrooms, kitchen and metres.
- Cost of renovating a 100 m² flat with two bathrooms - the size at which the price per metre rises again.
- How much it costs to renovate a flat in Barcelona: prices per m² and items - the general price guide for Barcelona.
- Renovation budget calculator - to enter your own metres, bathrooms and quality levels.
Keep reading
Why renovating a small flat costs more per square metre
In a 50 m² flat the bathroom, kitchen and services make up 58% of the budget, so each metre costs 660 € against 506 € in a 90 m² flat.
Prices and quotesFixed and variable renovation costs: which items do not depend on floor area
Bathroom, kitchen and services do not depend on floor area and make up 46 to 58% of a renovation. They set the floor below which a budget cannot go.
Prices and quotesFrom 80 to 100 m²: what really changes in a renovation budget
From 80 to 100 m² the functional budget rises by 15,596 €. The extra 20 metres add 4,372 €; the second full bathroom adds 9,418 €. Here are the numbers.