Prices and quotes

Why renovating a small flat costs more per square metre

In a 50 m² flat the bathroom, kitchen and services make up 58% of the budget, so each metre costs 660 € against 506 € in a 90 m² flat.

By the Tu Nuevo Piso teamPublished 3 November 20266 min read
Small renovated living room with light wooden floor and natural light

Indicative prices · VAT not included. Not a binding offer.

Why does it cost more per metre to renovate a small flat?

Renovating a small flat costs more per square metre because the bathroom, kitchen and services are paid in full even if the flat is half the size. In our standard 50 m² budget, these items add up to 58% of the total and the metre works out at 660 € at functional quality; in a 90 m² flat it falls to 506 €.

Put another way: you do not pay more for having fewer metres. You pay the same for the same things and spread it over less floor area. The figures below come from our price table, which is built from real signed quotes, and they are always guide prices without VAT.

Key points

  • From 50 to 90 m² the floor area grows by 80%, but the functional budget only by 38% (from 32,982 to 45,558 €).
  • A full bathroom, full kitchen, plumbing and electrics add up to 19,083 € in the 50 m² flat, 58% of the total.
  • What can be adjusted in a small flat is windows, doors and flooring: they depend on what you decide to keep.

The numbers: from the 50 m² flat to the 90 m² flat

The euro per metre falls each time the flat gets bigger, at least up to 90 m². This table shows our standard budgets for five sizes, calculated on the same basis: full renovation, full bathroom, full kitchen and renewed services.

Floor areaFunctional totalFunctional €/m²Mid-range €/m²
50 m²32,982 €660 €954 €
60 m²36,208 €603 €874 €
70 m²38,803 €554 €800 €
80 m²43,372 €542 €784 €
90 m²45,558 €506 €727 €

Guide prices · VAT not included. These are standard budgets, not binding offers: the fixed quote for your flat comes after the free technical visit. The 80 and 90 m² flats include a guest toilet as well as the bathroom.

Read the table by columns. Between 50 and 90 m² you add 40 m² and the total rises by 12,576 €, about 314 € for each new metre. The first 50 metres cost 660 € each. That is the whole trick: the "entry" metre carries the bathroom and kitchen with it, and the "extra" metre only carries flooring, paint and plasterboard.

Which items do not shrink in a small flat

Bathroom, kitchen, plumbing and electrics cost practically the same in 50 m² as in 90. In the functional 50 m² budget the four add up to 19,083 €; in the 90 m² one, which also has a toilet, 21,177 €. If you want to see which items stay stable when the metres change and which grow with them, read Fixed and variable costs of a renovation.

  • Full bathroom of about 4 m²: 10,255 € functional and 15,759 € mid-range. A four-metre bathroom cannot be made any smaller: it has a shower, toilet, basin, tiling and waterproofing just like a six-metre one.
  • Full kitchen of about 6 m²: 5,518 € functional and 7,650 € mid-range, with units, worktop and appliances.
  • Plumbing: 2,230 € functional, with the adaptation of the network and seven new points.
  • Electrics: 1,080 € functional for five rooms, with the electrical certificate.

In 40 and 50 m² flats in the Eixample and Gràcia, the conversation with the owner almost always ends up at the bathroom: it is the one room you cannot shrink and the one that weighs most. That is why these flats "look expensive" in a per-metre comparison. It does not mean your budget is badly made, it is arithmetic.

And a practical warning: if you receive a quote well below these figures for a small flat, first check what it says about services, waterproofing and who runs the works. That is where the difference hides. A bathroom priced well below the one in the table can look like a bargain until you find out what it leaves out: the tiling, the new drain or the electrical certificate.

When reviewing quotes for small flats, look at three things before the euro per metre: the total, the list of items and what is left out. If all three add up, the expensive metre stops being a problem and becomes the price of having a new bathroom and kitchen.

Compact renovated bathroom with walk-in shower and wall-hung toilet
A 4 m² bathroom costs almost the same in a 50 m² flat as in a 90 m² one.

What can be adjusted in 50 m²

You can adjust what depends on what you keep: windows, doors and flooring. These three items add up to 4,509 € at functional quality, 7,900 € at mid-range and 12,168 € at high quality.

  • Three windows: 1,659 € functional, 3,450 € mid-range and 6,648 € high. If the current ones insulate well, the item disappears.
  • Four interior doors: 1,000 € functional, 2,300 € mid-range and 3,120 € high. Lacquering the ones you already have costs less than replacing them.
  • AC5 wood flooring: 1,850 € functional, 2,150 € mid-range and 2,400 € high. An original floor in good condition can be sanded for a fraction of what it costs to lift it.

The logic is the same in all three: these items are paid per unit, not per metre, so every window or door you keep is one whole invoice less, not a fraction of one. In a large flat that saving is diluted; in a 50 m² flat it shows in the total.

It also helps to keep the kitchen and bathroom where they are. Without moving drainage stacks or water supply points, plumbing and brickwork costs fall noticeably. What we do not recommend cutting is the bathroom waterproofing or the new services.

When renovating a small flat is worth it

It is worth it when you look at the total and not the metre: renovating 50 m² on the basis of the table costs 12,576 € less than renovating 90 m². The price per metre is useful for comparing quotes for the same flat, not for deciding whether to renovate this one or buy a bigger one.

If you are torn between two flats, add each one's works budget to its purchase price and compare the two totals. With that sum in front of you, 660 against 506 stops being a worry.

Frequently asked questions about renovating a small flat

How much does it cost to renovate a 50 m² flat?

In our standard budget, 32,982 € at functional quality, 47,689 € at mid-range and 68,666 € at high quality, VAT not included. This is for a flat with one bathroom, a kitchen of about 6 m², renewed services, flooring, doors, windows and paint. The fixed figure for your flat comes after the free technical visit.

Can you renovate a small flat more cheaply?

Yes, by reducing the scope and not the metres: keeping windows in good condition, sanding the original flooring, lacquering the doors and leaving the kitchen and bathroom where they are. What does not get cheaper is the full bathroom or the new services with their electrical certificate.

Is it worth renovating a small flat or buying a bigger one?

It depends on the total you will spend, not on the price per metre. Add each flat's purchase price and works budget and compare the totals: the euro per metre of the renovation, on its own, decides nothing.

If you are deciding what to do with a small flat, these readings follow the order in which the questions tend to arise.

Keep reading

✆ Call✦ WhatsAppGet a quote →