What a full renovation of a 50 m² flat costs: real figures, item by item

The short answer, from our real quotes: a full renovation of a 50 m² flat costs 31,400 to 39,600 € at a functional specification, 45,400 to 57,300 € at mid-range and 65,300 to 82,400 € for high specification. Always excluding VAT. Further down is the itemised example budget — and why, at 50 m², the price per metre is the highest of any size.

Renovated living room opening onto a terrace with mountain views — a renovation in Cerdanyola del Vallès

Functional

31,400 € – 39,600 €

Standard finishes, layout unchanged

Mid-range

45,400 € – 57,300 €

Selected materials, possible re-planning

High specification

65,300 € – 82,400 €

Premium materials and interior design

Indicative prices · VAT not included · not a binding offer. Your exact figure comes from the free site visit, fixed and itemised.

The starting point

What a 50 m² flat is (and why it shapes the price)

The typical 50 m² flat in the Barcelona area has 1 or 2 bedrooms, a bathroom of around 4 m², a 5–6 m² kitchen, a living-dining room and a short corridor. Many date from the 60s and 70s, with a rear gallery (an enclosed balcony) that can be absorbed into the home, and with their original services.

That layout rules the budget: the two expensive rooms — kitchen and bathroom — cost the same as in a flat twice the size, but here they are spread over half the floor area. That is why a 50 m² flat always looks “expensive” per metre compared with larger ones: it is not the renovation, it is the arithmetic.

  • 1–2 bedrooms · 1 bathroom · 5–6 m² kitchen
  • 60s–70s blocks: original services are common
  • Absorbing the gallery and swapping the bath for a shower: the two headline changes
Layout of a renovated small flat — illustrative image
Typical price per m²660 – 1,373 €/m²
Layout of a renovated small flat — illustrative image
From our price table, not a template

Itemised example budget: 50 m², three specifications

Rounded figures from our price table (real, signed quotes). Excluding VAT; not a binding offer. Your own quote is fixed and itemised after the free site visit.

ItemFunctionalMid-rangeHigh spec% of total
Demolition and rubble clearance · floor lifted + strip-out950 €1,230 €2,800 €3%
Building work and labouring1,760 €1,840 €2,160 €4%
Plasterboard and suspended ceilings (~20 m²)920 €1,080 €1,300 €2%
Plumbing (adaptation + 7 points)2,230 €3,080 €4,260 €6%
Electrics (5 rooms) · with certificate (CIE)1,080 €1,590 €2,870 €3%
Complete bathroom (~4 m²) · building work + tiling + sanitaryware10,255 €15,759 €20,467 €33%
Complete kitchen (~6 m²) · units, worktop and appliances5,518 €7,650 €14,961 €16%
Flooring throughout (AC5 timber laminate)1,850 €2,150 €2,400 €5%
Internal joinery (4 doors)1,000 €2,300 €3,120 €5%
Windows (3 units) · if you keep yours, subtract this line1,659 €3,450 €6,648 €7%
Skimming and full repaint5,760 €7,560 €7,680 €16%
Total for the example budget32,982 €47,689 €68,666 €
Equivalent per m²660 €/m²954 €/m²1,373 €/m²
The arithmetic of a small flat

Why 50 m² has the highest price per m² (what does not scale)

In the functional example budget, kitchen + bathroom + services come to close to 60% — and those items cost practically the same at 50 m² as at 90 m². The only things that genuinely scale with floor area are flooring, painting and plasterboard.

The practical consequence: comparing your quote with the “average €/m²” quoted by property portals will lead you to the wrong conclusions. Compare items, not metres: it is the only honest comparison for small flats. And if a 50 m² quote looks suspiciously cheap, it is almost always because it cuts where you cannot see — services and waterproofing.

≈58%Almost fixed cost: kitchen, bathroom and services
≈42%The only part that scales with floor area
Interior of a renovated home — illustrative image
Interior of a renovated home — illustrative image
Your home is not the “example”

What pushes the price up or down in your case

What pushes it up

  • Original services (60s–70s buildings)Renewing everything with certificates can add 2,000–4,000 € compared with a home that has already been updated.
  • A building with no liftMaterial goes up and rubble comes down by hand: it adds around 5–8% to the works.
  • Opening a load-bearing wallTrial opening, lintel, project and technical supervision: 1,500–3,000 € depending on span and floor.
  • Changing the whole layoutMore demolition, more plasterboard and more service points: it is the largest variable item.

What brings it down

  • Keeping the windowsIf they are good quality and insulate well, you take 1,700–6,600 € off, depending on the range.
  • Keeping the kitchen and bathroom where they areIf waste stacks and supply points stay put, plumbing and building costs fall noticeably.
  • Keeping good doors and wardrobesLacquering rather than replacing saves most of the joinery cost.
  • Deciding finishes in timeChanges made on the go cost double: returned material plus a stopped site.
Timescales

How long a 50 m² flat renovation takes

Week 1Demolition and setting out

Floors and wall finishes come up, sanitaryware and non-structural partitions are removed, and the new layout is marked out.

Weeks 2–4Services and building work

New plumbing, waste and electrics with their certificates, plus the building work and plasterboard for suspended ceilings.

Weeks 5–6Wall and floor finishes, bathroom and kitchen

Tiling and waterproofing, the complete bathroom and kitchen are fitted, and flooring is laid throughout the home.

Weeks 7–9Joinery, painting and handover

Doors, fittings, skimming and painting, the final clean and a handover walk-round with the site manager.

7–9 weeks (full renovation) · ~5 weeks (deep partial renovation) — A complete 50 m² renovation is 7 to 9 weeks of actual work: 1 for demolition, 2–3 for services and building work, 2–3 for finishes and the bathroom and kitchen, and 1–2 for joinery, painting and snagging. A refresh that leaves the layout alone (like our Les Corts project, below) comes down to 5 weeks. You get a written programme with the quote.

Permits: what a 50 m² flat needs. For internal work that does not touch the structure, a prior notification of works to the council is enough (in Barcelona, depending on the case, an assabentat or a notification with reduced fees): you file it, pay the fee and start. If a load-bearing wall is opened or the façade is changed, a technical project and a licence are needed. We handle the paperwork and it appears as its own item in the quote — never as a surprise.

A genuinely fixed quote

What the price includes (and what it does not)

Included

  • A dedicated site manager running the renovation
  • Labour for every trade under a single contract
  • Materials at the specification stated against each item
  • Waste management: skip and haulage to an authorised tip
  • Protection of communal areas and a final builders’ clean
  • Certificates for the new services (electrical CIE, plumbing)
  • Filing the prior notification of works

Not included

  • VAT: 10% reduced rate or 21% depending on your case — confirmed in writing in the quote
  • Council licence fees (passed on at cost, depending on the council)
  • Loose furniture and decoration
  • Extra scope decided during the works (priced separately, in writing, before it is carried out)
On video

One of our projects, on video

A minute inside a renovation finished by our team: the detailing, close up and untouched.

The advice we would give a friend

Where to save on 50 m² — and where never to

Not every cut has the same effect: these are the items where saving is sensible, and the ones where it ends up costing more.

Save here

  • Finishes: standard stoneware rather than large-format porcelain
  • Standard sanitaryware and taps (they work just as well and cost half as much)
  • Lacquering the existing doors rather than replacing them
  • Keeping the existing windows if they insulate well

Never save here

  • Bathroom waterproofing: redoing it costs three times as much
  • Water and electrical installations: they are what the next 20 years rest on
  • Skimming the walls: you see it every day, in every light
  • Site management: the “cheap” option without a site manager ends up dear
Comparison

What if the flat were 60 or 70 m²?

The real difference is smaller than it looks: only flooring, painting and plasterboard scale. The expensive items (bathroom, kitchen, services) are practically the same.

Floor areaFunctionalMid-range
50 m² flat31,400–39,600 €45,400–57,300 €
60 m² flat34,400–43,500 €49,900–63,000 €
70 m² flat36,900–46,600 €53,200–67,200 €

* Indicative prices, excluding VAT. They vary with the starting condition of the home, the municipality and the finishes chosen.

Common questions

Questions about the cost of renovating 50 m²

The ones we are asked most before a quote is signed.

How much does it cost to fully renovate a 50 m² flat?

From our real quotes: 31,400 to 39,600 € at a functional specification, 45,400–57,300 € at mid-range and 65,300 to 82,400 € for high specification, always excluding VAT. The itemised example budget on this page comes to 32,982 € at the functional level. The final price is fixed and itemised after the free site visit.

Why is the price per m² higher in a small flat?

Because the kitchen, bathroom and services cost almost the same at 50 m² as at 90 m², and here they are spread over half the floor area. In the example budget those fixed items are around 60% of the total. That is why it is better to compare items rather than €/m².

Can you live in the flat during the renovation?

In a full 50 m² renovation we do not recommend it: there are 2–3 weeks without water or a kitchen and the whole flat is a building site. In a partial renovation done room by room, phasing is possible. We tell you plainly at the visit, depending on the scope.

What is the difference between renovating 50 and 60 m²?

Less than it looks in euros: roughly 1,500–2,500 € more at the functional level, because only flooring, painting and plasterboard grow. The expensive items (bathroom, kitchen, services) are the same. If you are choosing between two flats for this reason, size should not decide the renovation.

Do I need a licence to renovate a 50 m² flat?

For internal work that does not touch the structure, a prior notification to the council — quick and low-fee; with a load-bearing wall or the façade, a project and a licence. We handle it and its cost appears as its own item in the quote.

Do these prices include VAT?

No: all prices on this page exclude VAT, as in our quotes. The applicable rate (10% reduced or 21%) depends on your case — private use, age of the building and the weight of materials — and we confirm it in writing in the quote.

Who we are

Full renovations in Barcelona and across Catalonia. A fixed, itemised quote, a dedicated site manager who keeps you informed and a written warranty.

Related services

Guides and calculators

Want your exact figure, not a range?

A free site visit, a fixed itemised quote and a written programme. What we sign is what you pay.