How to renovate a small flat (under 50 m²) in Barcelona

Practical strategies for renovating a flat under 50 m² in Barcelona: gaining usable space, multiplying storage and making use of every centimetre.

By the Tu Nuevo Piso teamPublished 2 July 20264 min read

Indicative prices · VAT not included. Not a binding offer.

Renovating a small flat in Barcelona is, above all, an exercise in making the most of the space. In neighbourhoods such as Gràcia, El Raval or Poble-sec, flats of 35 to 50 m² are common, many of them in old traditional buildings. The good news is that, if the renovation is planned well, a 45 m² flat can feel like one of 60. The trick is not the number of square metres but how they are used. This guide brings together the key decisions for getting the most out of a small space. If you are thinking about renovating a flat to rent out, these optimisations matter even more for the return on your investment.

Start with the layout, not the finishes

In a small flat every partition wall costs usable space. The first step is to rethink the floor plan: take out non-structural walls to create an open daytime area (kitchen, dining and living room), keeping enclosed rooms only for the bedroom and the bathroom. Opening the kitchen to the dining area is the change that transforms these flats the most, because it removes corridors and spreads natural light through the whole home.

Tricks for gaining space and light

  • Sliding doors recessed into the wall: they give back the 0.8–1 m² that the swing of a hinged door takes up.
  • One single floor finish throughout the flat: visual continuity makes the space feel bigger.
  • Light colours and glass for dividers (fixed panels instead of solid walls) so that light is not blocked.
  • Making use of the height: in old buildings with high ceilings, a mezzanine for the sleeping area or storage up to the ceiling multiplies the capacity.

Made-to-measure storage: the key to a small flat

The difference between a cramped small flat and a comfortable one is built-in storage. Instead of loose furniture, it is worth designing made-to-measure joinery that uses every gap: floor-to-ceiling wardrobes, benches with drawers, fold-down beds or beds with a storage base, and a kitchen that goes all the way up. A well-designed kitchen renovation in a few linear metres can fit a dishwasher, a washing machine and a pantry without giving up worktop space.

The bathroom in a few square metres

In small flats the bathroom is usually 3–4 m². Swapping the bath for a flush shower tray frees up space, improves accessibility and removes the joints that collect dirt. A wall-hung vanity unit, a concealed-cistern toilet and a large mirror complete the feeling of openness. Microcement, which has no joints, reinforces that sense of continuity.

How much it costs to renovate a small flat

Although the cost per m² of a small flat tends to be somewhat higher (the kitchen and bathroom weigh more on the total), the overall budget is contained. To see how much it costs to renovate a flat in Barcelona at mid-range quality (600–850 €/m²), a low-cost flat renovation in Barcelona comes out roughly as follows:

  • 40 m²: between 24,000 and 34,000 €.
  • 45 m²: between 27,000 and 38,000 €.
  • 50 m²: between 30,000 and 42,500 €.

Made-to-measure joinery is the item where it is worth investing, because it gives the greatest return in small spaces. For the full breakdown of finish levels, see our guide to the price of a full renovation in Barcelona in 2026.

Timescales and logistics

A flat under 50 m² usually takes 6 to 8 weeks to renovate. In buildings on narrow streets (typical of Gràcia or Ciutat Vella), logistics need planning: loading and unloading times, sacks or a skip depending on what the Ajuntament allows, and materials carried up narrow staircases in stages.

Mistakes that raise the cost and cost you space

Avoid oversized furniture, keeping long corridors just "because they always were there", and choosing too many different materials. In a small flat, simplicity is efficiency. If your home is in an old building in the Eixample, our guide to renovating an old flat in the Eixample will also be useful.

Conclusion

A small flat that is well renovated in Barcelona gains far more in comfort, light and market value than its square metres would suggest. The key is to invest in layout and made-to-measure storage before eye-catching finishes. For a quote that fits your home, request a budget after a free technical visit. All figures are guide prices and depend on the real condition of the flat. If you are looking for exclusive finishes and high-end materials, we also carry out luxury renovations in Barcelona.