Renovations by area

Renovating an old flat in Barcelona's modernist Eixample

What makes renovating an old flat in the modernist Eixample different, and how to combine mouldings, courtyards and high ceilings with new services.

By the Tu Nuevo Piso teamPublished 1 July 20267 min read

Indicative prices · VAT not included. Not a binding offer.

The Eixample district of Barcelona is home to some of the city's most sought-after flats: four-metre ceilings, plaster mouldings, hydraulic mosaic floors and glazed galleries overlooking block courtyards. But behind that modernist charm there are often half-century-old services, damp and nineteenth-century layouts. This guide explains how to modernise an old flat without losing its character or ignoring the rules.

Why renovating an old flat in the Eixample is different

A flat in the Eixample is not just any flat. Most were built between 1870 and 1930, with load-bearing solid brick walls, timber or iron joists and ceramic infill vaulting (bovedillas). This shapes everything: where you can open a gap, which partitions you can remove and how the floor behaves when the builder starts chipping away. Before you fantasise about an open-plan kitchen, you need to understand what is above your head and under your feet.

On top of that, many of these buildings are listed or sit within a heritage protection zone. Features such as the façade, the projecting bay, the original joinery or even the hydraulic-tile floors may be protected, which means they must be kept or restored rather than replaced. That is why the first technical visit is decisive: it defines what is possible, what is mandatory and what makes financial sense.

Pre-renovation diagnosis: structure, services and defects

Before touching anything, we carry out a proper diagnosis. In older flats in the Eixample, the usual surprises are:

  • Timber joists damaged by damp or wood-boring insects, especially in kitchens, bathrooms and galleries.
  • Obsolete electrical installation, often without an earth connection and not meeting the low-voltage regulations (REBT), with wiring that is a real fire risk.
  • Lead or cast-iron waste pipes and stacks that should be fully replaced.
  • Rising damp at ground-floor level and in courtyards, and leaks from communal roofs and terraces.
  • Lack of thermal and acoustic insulation, with single-pane windows.

If the building is 45 years old or more, it must also have passed the building inspection (ITE). It is worth checking its condition before you buy or renovate, because defects flagged in the ITE can force large special levies on the owners' community. We explain this in detail in our guide to the ITE in Barcelona and how to pass it.

What to keep and what to modernise

The appeal of renovating in the Eixample lies in balance. The aim is neither to leave everything as a 1900 flat nor to turn it into a white box with no personality. Our recommendation, item by item:

ElementRecommendationReason
Hydraulic mosaic floorKeep and restoreVery high heritage and market value
Plaster mouldings and ceiling rosesKeep and repairThey define the modernist character
Interior timber joineryRestore if viableDouble-leaf doors are hard to reproduce
Electrical installationRenew completelySafety and compliance with the REBT
Plumbing and waste stacksRenew completelyAvoid future leaks and damp
External windowsReplace or add a second layerEnergy efficiency and acoustic comfort

Restoring a good hydraulic floor (sanding, polishing and sealing) usually costs between 40 and 80 €/m², compared with 30–60 €/m² for a new porcelain stoneware floor. It is worth it: a restored original mosaic adds far more value to the flat than it costs to restore.

Layout: opening up space without touching what you cannot

Eixample flats usually have a linear layout, with rooms that pass through one another and a very long central corridor. The challenge is to gain light and space while respecting the load-bearing walls. What we usually do:

  1. Open the kitchen to the dining room to create a bright day zone facing the façade or the gallery.
  2. Turn the rear gallery into an office, study or laundry area.
  3. Reorganise the night zone to create an en-suite bathroom and built-in wardrobes.
  4. Remove non-structural partitions to enlarge the living room towards the main balcony.

When an opening has to be made in a load-bearing wall, structural calculations are needed and, almost always, a certified steel lintel. This adds to the cost but is non-negotiable for safety. To decide between brick partitions or plasterboard (pladur), our article on pladur or brick partitions may help. And if you want to understand the full scope of this kind of project, read what a full renovation is and what it includes.

Twenty-first-century services in a nineteenth-century building

This is where an old flat really gains. We renew the whole electrical installation with a new consumer unit, independent circuits and an earth connection that complies with the low-voltage regulations (REBT). For plumbing, we replace lead pipes with cross-linked polyethylene or multilayer pipe, and reorganise the waste stacks. For climate control, more and more owners are choosing aerothermal systems, which provide heating, cooling and hot water from a single efficient system. We cover this in our guide to aerothermal and climate control in renovations.

Insulation is key in these buildings. Mineral wool lining on the external walls, thermally broken double-glazed windows and acoustic insulation between rooms transform comfort. These energy efficiency improvements may also qualify for public grants. Check the Next Generation grants and the IRPF (income tax) deduction currently available in Catalonia.

Permits, paperwork and the owners' community

Almost no full renovation in the Eixample is purely minor works. Changing the layout, touching shared services or working on protected elements usually requires a prior works notification or a major works licence from Barcelona's town hall (the Ajuntament). If the building is listed, the process also goes through the heritage department. We explain the types of permit in our guide to works licences in Barcelona.

Two key documents you should not forget:

In addition, you should inform the owners' community before starting and keep to the permitted noise hours. Tu Nuevo Piso handles the permits and technical documentation as part of the service, with a registered architect and a site manager in charge of the project.

How much a renovation of an old flat in the Eixample costs

The price depends on the starting condition, the floor area and the level of finish. As a guide for Barcelona in 2026:

Type of renovationGuide price (€/m²)What it includes
Mid-range renovation600–800 €/m²Services, bathrooms, kitchen and standard finishes
High-end renovation800–1,100 €/m²Restoration of original features and better materials
Luxury1,100–1,800 €/m²Exclusive finishes, home automation and made-to-measure joinery

For a typical 90 m² flat in the Eixample, a full renovation of medium to high quality usually comes to between 75,000 and 110,000 €. Specific items such as restoring mouldings, recovering hydraulic-tile floors or renewing a whole gallery are priced separately. If you are looking at top-end finishes, our guide to luxury and high-end renovations in Barcelona will interest you. For more detail on figures, there is also our article on the cost of a full renovation in Barcelona in 2026.

Realistic timescales for a renovation in the Eixample

A full renovation of a flat in the Eixample does not take a month. These are the timescales we work to:

  • Design and permits: 4 to 10 weeks, depending on the type of permit.
  • Works on a 90 m² flat: 12 to 18 weeks.
  • Specialist restorations (mosaics, plasterwork): add 2 to 4 weeks.

We work with a fixed quote and phased planning, so you always know what is being done and when each item finishes.

Frequently asked questions

Can I knock down any wall in a flat in the Eixample?

No. You need to distinguish between partition walls, which can be removed, and load-bearing walls, which hold up the structure. Removing or opening a load-bearing wall requires structural calculations and reinforcement, and must always be supervised by a technician.

Is it compulsory to keep the hydraulic mosaic floor?

It depends. If the flat is in a listed building, the original floors may be protected. Even if they are not, keeping them is usually the best decision for their aesthetic and market value.

Do I need a major works licence?

If you change the layout, touch general services or work on structural or protected elements, you most likely do. A renovation that only changes finishes can go through a prior works notification. We confirm this at the technical visit.

How much does a renovation add to the value of a flat in the Eixample?

A well-executed full renovation that respects the modernist character can add considerably to the value of the property, especially if original features are recovered and energy efficiency is improved with a certificate.

Conclusion

Renovating an old flat in the modernist Eixample is a balance between respect for heritage and twenty-first-century comfort: keep what gives character, renew what gives safety, and gain light without forcing the structure. At Tu Nuevo Piso we do it with a registered architect, a site manager and a fixed quote. If you have a flat in the Eixample and want to know what can be done and how much it would cost, request your free, no-obligation quote. We will study your case with the honesty and detail a building like this deserves.

Keep reading

✆ Call✦ WhatsAppGet a quote →