Plasterboard or brick partition: which to choose for your renovation
Choosing between plasterboard and brick for new walls? We compare both systems on weight, sound insulation, moisture, price and timing so you can decide on clear criteria.
Indicative prices · VAT not included. Not a binding offer.
Between plasterboard and brick partitions, what usually works best in a renovation is to combine them: plasterboard (pladur) for the interior partitions of bedrooms, corridors and living rooms, because it goes up quickly, weighs little and insulates well against noise with double board and mineral wool, and brick partition or cement board in bathrooms, wet areas and walls that carry heavy furniture.
When you plan a renovation and need to reconfigure the space, the same question always comes up: should the new walls be built in plasterboard (pladur) or in brick? There is no universal answer. Each system has real advantages depending on the use of the room, the budget and the timing. At Tu Nuevo Piso we use both every day, and here we explain, without marketing, when each one makes sense so you can make an informed decision for your renovation.
What plasterboard is and what a brick partition is
Pladur (plasterboard) is a frame of metal profiles (studs and tracks) with gypsum boards screwed onto it and insulation inside the cavity. It is a dry system: it uses no water and no mortar. A brick partition is the traditional brick wall (hollow ceramic brick or gero) built with mortar and then plastered with gypsum or cement. It is a wet, heavy system.
The fundamental difference is not just the material but the building logic: plasterboard assembles layers, while brick stacks pieces. That determines weight, timing, dust on site and how the wall behaves against water and knocks.
Quick comparison: plasterboard vs brick partition
Before getting into detail, this table sums up the differences that matter most when you decide.
| Criterion | Plasterboard (gypsum board) | Brick partition |
|---|---|---|
| Speed of installation | Very fast (dry) | Slow (setting and drying) |
| Weight on the floor slab | Light (ideal for older flats) | Heavy |
| Sound insulation | Very good with double board and wool | Good, thanks to its mass |
| Resistance to knocks / hanging weight | Medium (needs reinforcement) | High |
| Behaviour with moisture | Needs moisture-resistant or cement board | Better by nature |
| Running services through | Very easy (they run in the cavity) | The wall has to be chased |
| Dust on site | Minimal | High (rubble, dust, mortar) |
| Indicative price | 30–55 €/m² | 45–75 €/m² |
Advantages of plasterboard
Plasterboard has taken over most interior renovations, for good reasons:
- Speed: with no setting or drying times, a complete layout goes up in days, not weeks. This shortens the total length of the works.
- Lightness: it barely loads the floor slab, which matters a lot in older flats in the Eixample and other buildings where you do not want to add dead weight.
- Hidden services: plumbing, electrics and ventilation and air-conditioning ducts run inside the partition without chasing, which cuts dust and makes access panels easy to fit.
- Tailored insulation: with double board and mineral or rock wool, you get excellent acoustic values between rooms, even better than a single brick partition.
- Cleanliness: it produces far less rubble, which matters when you are renovating while still living in the home.
Advantages of brick partitions
Brick still has irreplaceable uses in certain cases:
- Mechanical strength: it takes knocks, scrapes and the weight of hanging units (kitchen wall units, boilers, wall-hung sanitaryware) without special reinforcement.
- Behaviour with water: in wet areas, a well-waterproofed brick partition tolerates moisture better, although cement boards now largely match this advantage.
- Thermal mass: the mass of brick dampens temperature swings better.
- Feeling of solidity: when you knock on it, it sounds "solid", something many owners value psychologically.
When to choose each system? Practical cases
The smart decision is almost never "all plasterboard" or "all brick", but a mix of both depending on the room.
Better plasterboard
- Interior layout of bedrooms, corridors and living rooms.
- Walls between rooms where acoustic insulation is the priority.
- Older flats where weight is a structural problem.
- Renovations on a tight timeline or while living in the home.
- Ceilings, false ceilings and linings to hide services.
Better brick partition (or cement board)
- Walls in bathrooms and areas in direct contact with water, especially the shower tray. If you are going to swap the bath for a shower, check this point carefully.
- Kitchens where heavy wall units and appliances are hung.
- External walls or walls with a protective function.
- Areas with heavy traffic or knocks (entrances, commercial premises).
In practice, in a typical full renovation we build the interior partitions in plasterboard and keep cement board or brick for the wet areas. It is the combination that best balances cost, timing and durability.
Sound insulation: the decisive factor between neighbours
One of the most widespread myths is that "you can hear everything through plasterboard". That is false when the system is well built. A plasterboard partition with double board on each side and mineral wool in the cavity can reach sound insulation higher than a simple half-brick wall. The key lies in the number of boards, the thickness of the insulation and, above all, in sealing the junctions well and decoupling the structure from the floor slab.
What really makes the difference is workmanship: a cheap installation with a single board and no insulation does transmit noise. That is why we stress that the problem is not the material but who installs it and how. This links to the importance of choosing your renovation contractor carefully: a company backed by a trade association such as Greincat helps ensure the system is fitted with the right components.
Prices: how much each option costs in Barcelona 2026
Plasterboard is usually the cheaper option, mainly because it is quicker to install and needs less labour and rubble removal. These are indicative ranges per square metre of finished partition (unpainted) in Barcelona and Catalonia.
| System | Build-up | Indicative price (€/m²) |
|---|---|---|
| Standard plasterboard | 1 board per face + wool | 30–40 €/m² |
| Reinforced plasterboard | 2 boards per face + wool (acoustic) | 40–55 €/m² |
| Plasterboard lining | Insulation of an existing wall | 25–45 €/m² |
| Brick partition | Hollow brick, plastered on both faces | 45–65 €/m² |
| Brick partition + waterproofing | Wet area | 55–75 €/m² |
Note that these prices are for the isolated partition work only. In the overall cost of a renovation, the walls are a small part next to bathrooms, the kitchen and services. For the full picture, see our guide to the price of a full renovation in Barcelona 2026, which shows how this item fits into the total budget.
Common mistakes when deciding
- Using standard plasterboard in the bathroom: use moisture-resistant board (green) or, better, cement board in the shower area. A standard board will end up with moisture problems.
- Not allowing for reinforcement to hang weight: if you plan to fix high units, radiators or a large TV, leave studs or reinforcing boards inside the plasterboard before closing it up.
- Choosing the cheapest system without considering acoustics: skimping on insulation between bedrooms is one of the most frequent regrets.
- Mixing the systems badly: junctions between brick and plasterboard must be handled properly to avoid cracks in the joints.
Frequently asked questions
Is plasterboard weaker than brick?
It is less resistant to isolated impacts, but it is perfectly valid as a dividing partition. For hanging weight, internal reinforcements are fitted. It is not a material you simply take down and replace: when properly built, it lasts the whole life of the home.
Can I put plasterboard in the bathroom?
Yes, using moisture-resistant or cement board and good waterproofing in the shower area. Even so, many professionals, including us, prefer brick or cement board right where direct water hits, for long-term safety.
Which one insulates better against noise?
A well-designed plasterboard system with double board and mineral wool can insulate as well as, or better than, a simple brick partition. What matters is the configuration and the quality of the installation, not the material itself.
Does plasterboard make a renovation cheaper?
Usually, yes: it is quicker to install, produces less rubble and reduces labour. On projects with a tight timeline, that time saving is also a money saving, something we value highly in a well-prioritised low-cost renovation.
Do I need a licence to change the layout of partitions?
Moving non-structural partitions usually falls under minor works or a prior works notification, but it is worth confirming. We explain this in our guide to the works licence and, of course, we can handle it for you.
Conclusion
There is no outright winner between plasterboard and brick partitions. Plasterboard excels at speed, lightness, sound insulation and cleanliness, while brick offers strength and better natural behaviour with water and knocks. The right decision is almost always to combine them sensibly, room by room. At Tu Nuevo Piso we advise you, with an architect and a site manager, on the best system for every wall in your home, with a fixed quote and no surprises. Tell us about your project and we will prepare a free, tailored quote.
Keep reading
Technical architect fees and works supervision costs
What a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Guides and adviceWhen is the best time of year to renovate your flat?
Find out when to renovate your flat. How spring, summer, autumn and winter affect drying times, prices, builder schedules and works licences.
Guides and adviceRenovation vs new build: what makes sense and when to choose each
Renovation or new build in 2026? We compare costs per m², the CTE building code, taxes and timescales to help you choose the right option.