What is a full home renovation? What it includes
What a full renovation means, which items it normally includes and how it differs from a partial renovation, with guide figures from the Barcelona market.
Indicative prices · VAT not included. Not a binding offer.
What a full home renovation is
A full home renovation is the complete refurbishment of a home: every room and every service is worked on at the same time. Unlike a partial renovation — which affects only one area, such as the kitchen or a bathroom — a full renovation strips the flat back almost to the shell, rebuilds everything and hands it over ready to move into. It is the usual route when you buy an older flat in Barcelona, when the services are worn out or when you want to change the layout completely. For a complete guide to this kind of project, see our complete guide to full home renovation.
The term is not just a sales label: it means the job covers non-structural partitions, services, wall and floor coverings and finishes in a coordinated way, in a planned order of trades and, normally, under the supervision of a registered technical architect. It is worth checking that the renovation company is a member of Greincat, which helps guarantee the quality and professionalism of the service — especially if you are considering aerothermal heating and climate control in a full renovation.
What a full renovation includes
Every project is different, but a typical full renovation includes these items:
- Demolition of partitions, removal of rubble and waste management.
- Building work: new partitions, screeds and levelling.
- New electrical installation with its certificate and an updated fuse board.
- Plumbing: new downpipes, supply pipes and drains.
- Climate control: ducted air conditioning or aerothermal heating.
- Plastering, plasterboard false ceilings and acoustic insulation.
- Floors: parquet, porcelain tile or microcement.
- A complete kitchen and bathrooms: units, worktop, tiling, sanitaryware and taps.
- Carpentry, painting and the final clean.
You can see the full breakdown on our full renovations page for Barcelona, where we set out the quality levels and the process.
Full renovation or partial renovation
The difference is the scope. A partial renovation renews one specific room without touching the rest: swapping a bath for a shower, for example, or updating the kitchen. A full renovation, by contrast, rethinks the home from scratch and lets you re-plan the space: open the kitchen to the living room, gain a bathroom or create a dressing room. As a rule of thumb, if you are going to renovate three or more rooms and the services, a full renovation usually pays off, because coordinating all the trades at once cuts down on repeat visits and on the total cost. If you want to know more about how to renovate a small flat in Barcelona, there is a guide for that too.
How much it costs and how long it takes
The price is measured in euros per square metre. As a guide for the Barcelona market in 2026, it runs from 450–600 €/m² at basic quality to 850–1,200 €/m² at premium, with mid-range at 600–850 €/m². An 80 m² flat at mid-range quality usually lands between 48,000 and 70,000 €. The work takes 8 to 14 weeks on average, plus 2–5 weeks of preparation beforehand. These figures are a guide only: the price is fixed after the technical visit. You can get a first estimate with our renovation budget calculator, and if you want to go deeper, read how much it costs to renovate a flat in Barcelona, by m² and quality level. For a fixed quote, get in touch.
Keep reading
Habitability certificate in Catalonia: when you need one
What the habitability certificate in Catalonia means, which operations require it, and how it is obtained after a renovation or change of use.
GlossaryWhat is Greincat and why it matters when choosing a renovator
What Greincat is, what it means for a renovation company to be a member of the association, and why membership is a sign of reliability when you hire for your building work in Catalonia.
GlossaryWhat is the CTE (Technical Building Code)?
What the CTE is, which basic documents make it up, and how it affects your renovation in terms of safety, energy efficiency, noise and accessibility.

