Aerothermal and climate control in a full renovation: 2026 guide

A full renovation is the best moment to switch to aerothermal heating and sort out year-round climate control. Here is how it works, what it costs and which grants you can use in 2026.

By the Tu Nuevo Piso teamPublished 28 June 20267 min read

Indicative prices · VAT not included. Not a binding offer.

When you start a full renovation, one decision shapes comfort and energy bills for the next twenty years or so: how you will heat, cool and produce hot water in your home. Aerothermal has become the most efficient choice for many homes in Barcelona and Catalonia, but it is not the right answer for every home, and it is not the cheapest to install. At Tu Nuevo Piso we work with a registered architect, a site manager and a fixed quote, so we plan the climate control from the first drawing rather than adding it later. In this 2026 guide we explain what aerothermal is, what it costs, when it makes more sense than other options and how to fit it into a renovation without surprises.

What aerothermal is and why it has become popular

Aerothermal is a technology that takes energy from the outside air using a heat pump and uses it for three things: heating in winter, cooling in summer (if the unit is reversible) and domestic hot water (ACS). Its big advantage is efficiency. For every kWh of electricity it uses, it delivers roughly 3 to 4 kWh of useful energy, because it moves heat rather than creating it by burning fuel. That means lower bills and no combustion inside the home: no gas and no fumes.

The boom in 2026 has three drivers: the price of gas, the regulatory push towards decarbonised buildings, and public grants for energy rehabilitation. For many families, replacing an old gas boiler with aerothermal during a full renovation is the ideal moment, because the works are already open.

How much aerothermal costs in a renovation

The cost of an aerothermal installation for a home in Barcelona varies widely in 2026, depending on the capacity, whether it includes underfloor heating and how complex the works are. These are rough figures, installation included:

SetupTypical homeEstimated price 2026
Aerothermal for hot water onlySmall flat, replacing the water heater3,500 – 6,000 €
Aerothermal + radiators (heating + hot water)Flat of 70–90 m²8,000 – 12,000 €
Aerothermal + underfloor heating/cooling + hot waterFlat of 90–130 m² or house12,000 – 20,000 €
Aerothermal + ducted air for cooling/heatingHome with a suspended ceiling14,000 – 22,000 €

The price goes up with underfloor heating, which means lifting the floor finish (something a full renovation already plans for), and with the need to find a spot for the outdoor unit. That is a sensitive point in Barcelona apartment blocks because of appearance, noise and community rules. To see how this item fits into the total, read our Barcelona full renovation price guide for 2026, per m².

Aerothermal compared with other heating and cooling systems

Aerothermal is not always the best option. It depends on your home, whether you already have radiators and how much you want to invest. This comparison sums up the essentials:

SystemEfficiencyUpfront costBest for
AerothermalVery highHighFull renovations, houses, decarbonising
Condensing gas boilerMediumMediumQuick replacements where there is already gas
Ducted (air) heat pumpHighMedium-highCooling/heating with a suspended ceiling
Split / multi-split systemsHigh for coolingLow-mediumCooling specific rooms
Electric radiatorsLowLowVery occasional use

A very common and effective combination is aerothermal with underfloor heating for heating and hot water, plus ducts or split systems for summer cooling. The right system depends on how far your renovation goes. If you are still unsure what a full renovation involves, our article on what a full renovation is and what it includes will help.

Underfloor heating: aerothermal's best partner

Aerothermal works better the lower the temperature of the water it supplies, and underfloor heating runs at a low temperature (around 30–40 °C, compared with 60–70 °C for a radiator). That is why they make such an efficient pair. Underfloor heating can also cool gently in summer, giving a mild cooling effect without draughts.

The drawback is that it means lifting the floor and raising the floor level slightly. That is manageable in a full renovation, but not for a simple floor covering change. If your project is lighter, you may want to compare options in changing the floor without major works in Barcelona, though bear in mind that underfloor heating cannot be fitted that way.

Regulations, electrical work and the outdoor unit

Aerothermal is an installation that has to meet several sets of rules. The electrical side falls under the low-voltage regulations (REBT, Reglamento Electrotécnico de Baja Tensión): the heat pump needs its own circuit and protection, and many older homes need a higher contracted power and a new fuse board. The whole home must also meet the efficiency and health requirements of the Technical Building Code (CTE). For more detail, see what the CTE (Technical Building Code) is and why insulation matters so much.

Where to put the outdoor unit

This is the most contentious point in Barcelona flats. The outdoor unit needs ventilation, makes some noise and, in many communities, its position on the façade or in the courtyard is governed by the building's statutes or by municipal rules. It is worth:

  • Checking the owners' community rules before deciding where it goes.
  • Planning the route for pipes and the condensate drain from the start.
  • Choosing a low-noise unit if it sits near windows or neighbours.

If the building is old and you are going to work on the façade or courtyards, check when façade rehabilitation is compulsory in Barcelona, because sometimes the two jobs are planned together.

Insulation comes first: without the envelope, there is no efficiency

However good the aerothermal system is, if the home loses heat through its windows, façade or roof, the savings disappear. In every full renovation we recommend tackling the building envelope: windows with thermally broken frames and double glazing, insulation on external walls and, where possible, the roof. It is an investment that reduces the size of the unit you need and improves comfort all year round. This whole-home approach is exactly what separates a well-planned renovation. You can see it in our complete guide to full home renovation.

Grants, tax deductions and returns

Installing aerothermal usually qualifies you for grants for energy rehabilitation and for income tax (IRPF) deductions for efficiency improvements, provided you can show a reduction in energy consumption or demand. Programmes and deadlines change, so check the current state of the funds before you sign. The details are in Next Generation grants and the income tax deduction for renovations in Catalonia 2026.

On returns, the saving compared with a gas boiler and a conventional air system is usually a significant share of the heating and cooling bill, with a payback period that depends on how much you use the system and on energy prices. Aerothermal also adds value to the home and improves its energy certificate, something buyers and tenants increasingly look for.

How we fit it into your renovation

  1. Heat load study of the home to size the unit (neither oversized nor undersized).
  2. Coordinated design across climate control, electrics, plumbing and building works, to plan pipe routes and unit locations.
  3. Installation with underfloor heating or ducts as the case requires, within the works schedule.
  4. Commissioning and legalisation of the installation, with its certificates and warranties.

Frequently asked questions

Does aerothermal work well in Barcelona's climate?

Yes. Barcelona's Mediterranean climate, with mild winters, suits aerothermal well, because a heat pump works better the less extreme the outside temperature is. It is one of the places where it makes the most sense.

Can I install aerothermal in a flat without underfloor heating?

Yes. Aerothermal can work with low-temperature radiators, fan coil units or ducts. Underfloor heating improves efficiency, but it is not essential. In many flats, aerothermal is used for heating and hot water, with split systems or ducts for cooling.

Is the outdoor unit noisy?

Modern units are quite quiet, but they do make some noise. The key is the location, and choosing a low-noise model if it sits near windows or neighbours. In communities, check the rules before installing.

Do I have to increase my electrical power?

Not always, but it is common. The heat pump needs its own circuit and, in older homes, the fuse board usually needs checking and sometimes a higher contracted power to cover start-up peaks.

Is it worth replacing a gas boiler with aerothermal?

If your boiler is old and you are doing a full renovation, it usually is: the works are already open, you save on bills, you gain cooling in summer and you improve the energy certificate. If the boiler is new and you are not renovating, the payback is slower.

Conclusion

In most full renovations in Barcelona and Catalonia in 2026, aerothermal is the most sensible way to heat and cool efficiently, gain comfort and add value to the home, provided it is combined with good insulation and a coordinated design from day one. The key is to size the unit properly, sort out the outdoor unit and plan the installations within the works schedule. At Tu Nuevo Piso we do this with a registered architect, a site manager and a fixed quote. If you want to know which system suits your home and what it would cost, ask us for a free, no-obligation quote. We will study your home and propose the most efficient solution for your case.