Grants and subsidies

Next Generation grants and IRPF deduction for renovations in Catalonia

The Next Generation renovation grants no longer accept applications, but the IRPF income tax deduction for energy-efficiency works is still available. Here are the percentages, the requirements and the tax authority's deadlines.

By the Tu Nuevo Piso teamPublished 28 June 202611 min read

Indicative prices · VAT not included. Not a binding offer.

Are the Next Generation grants still open, and which IRPF deductions are there in 2026 for renovating a home to save energy?

No, the Generalitat's Next Generation grants for renovation no longer accept applications: submission ended at the latest on 31 December 2025, or earlier if the funds ran out. The IRPF deduction for energy efficiency (20%, 40% or 60%) is still available for works up to 31 December 2026, or 2027 in predominantly residential buildings.

Renovating a home in Catalonia can come with financial help, but you need to tell apart what is still open from what has closed. The Next Generation EU grants under the residential renovation programme no longer accept applications: the Generalitat says the application period ended at the latest on 31 December 2025, or earlier if the funds ran out, and shows the funding as exhausted. What is still available in 2026 is the income tax (IRPF) deduction for energy-efficiency improvements. According to the tax authority, it applies to works carried out up to 31 December 2026 and, in predominantly residential buildings, up to 31 December 2027. If you are renovating in Barcelona and the surrounding area, this guide explains plainly what has closed, what you can deduct and the real conditions you must meet.

What the Next Generation grants are for home renovation

Next Generation grants are not a cheque for 'renovating the whole flat'. They come from the Recovery, Transformation and Resilience Plan and focus on energy renovation: cutting the energy used for heating, cooling and hot water, and reducing the home's overall energy demand. In Catalonia they are managed by the Agència de l'Habitatge de Catalunya, except in Barcelona city and its metropolitan area, where works on individual homes follow the calls of the Consorci de l'Habitatge de Barcelona and the Consorci Metropolità de l'Habitatge.

The programme has several strands. The most relevant for a private owner is usually the one for building-level works (Programme 3), which funds renovations of whole communities, and the one for energy-efficiency improvements in individual homes (Programme 4), aimed at specific flats. There is also a Programme 5 for drafting the building logbook (Libro del Edificio) and technical projects. Each strand has its own subsidy percentage, cap and energy-saving requirement. All of them now show as out of time (see below), but knowing how they worked helps you read the figures you find elsewhere.

How much the building programme covered: percentages and caps

The size of the grant depends directly on the reduction in non-renewable primary energy your works achieve, measured with the energy efficiency certificate before and after. The more consumption was cut, the higher the subsidised percentage and the cap per home. These are the amounts the Generalitat set for Programme 3 (building renovation), whose application period has ended:

Saving in non-renewable primary energyMaximum % grantMaximum grant per home
Between 30% and 45%40%Up to 6,300 €
Between 45% and 60%65%Up to 11,600 €
More than 60%80%Up to 18,800 €

These caps are calculated per home and, for commercial premises and other uses, per square metre, and there is an extra grant for economic vulnerability with a maximum subsidy of 100%. For individual homes (Programme 4) the Generalitat says the grant is 40% of the cost of the works, up to a maximum of 3,000 €, with a minimum project cost of 1,000 €, and the home must be the permanent main residence. One important point: these amounts are the theoretical maximum. The real grant can never exceed the cost of the justified energy items. Items such as decorative paint, kitchen furniture or taps chosen for looks do not count as energy savings.

Which works qualified for a grant

This is where we see the most confusion. The grant rewards the building envelope and the installations, not the interior finishes. The works that count towards the saving and the calculation are:

  • Thermal insulation of façades (external SATE system or internal), roofs and floors.
  • Window replacement with thermal-break frames and low-emissivity glass.
  • Replacing the climate control system with efficient solutions, especially aerothermal heating, the star of the programme.
  • Installing renewable energy (photovoltaic or thermal solar panels) and ventilation systems with heat recovery.
  • Improving lighting and controls where they form part of the overall project.

On many full renovations we take the chance to replace gas boilers with heat pumps. If you want the technical and cost detail, we cover it in our guide to aerothermal heating and climate control in a full renovation. When the envelope of an older building is also being redone, it is worth reviewing the options for façade renovation in Barcelona. The façade is often where the most energy is lost and, if the community renovates the building and the certificate shows the required improvement, the works can qualify for the 60% IRPF deduction.

The income tax (IRPF) deduction: the route that is still open

Beyond the direct grant, the tax authority lets you deduct from your income tax return part of what you spend on improving your home's energy efficiency. There are three different deductions, and in all of them the grants awarded are deducted from the base. Here is the comparison:

Type of deduction% deductibleMaximum baseEnergy requirement
Reduction in heating and cooling demand20%5,000 € a year per tax returnReduce by at least 7% the sum of the heating and cooling demand indicators
Reduction in non-renewable primary energy consumption40%7,500 € a year per tax returnReduce non-renewable primary energy consumption by at least 30% or reach rating A or B
Energy renovation of residential buildings60%5,000 € a year (up to 15,000 € in total)Reduce the building's non-renewable primary energy consumption by at least 30% or reach rating A or B

To claim it you need two non-negotiable things: the energy efficiency certificate before and after the works, showing the improvement, and payment by a means other than cash (the tax authority excludes cash payments). The dates are these, according to the tax authority (Royal Decree-law 7/2026): the first two deductions apply to works carried out up to 31 December 2026, in your main home or in a home you rent out or intend to rent (if it is let before 31 December 2027), with the certificate issued before 1 January 2027. The 60% deduction applies to works in predominantly residential buildings up to 31 December 2027, with the certificate issued before 1 January 2028. The first two exclude second homes and tourist flats. The deduction is claimed in the tax period in which the energy efficiency certificate is issued. We are not tax advisers, so we always confirm this part with you and your accountant.

Can you claim the grant and the IRPF deduction at the same time?

For someone who already has a grant awarded, yes, but with one key rule: you cannot deduct money the grant has already paid you. The tax authority says the grants awarded are deducted from the base, so only what you pay out of your own pocket is deductible. How the grant itself is taxed is something to check with your tax adviser.

Requirements and paperwork: the real admin

This is the least glamorous part, but the most decisive. For the IRPF deduction the key document is the energy efficiency certificate from before and after the works. For the Next Generation grants, now out of time, these documents were also gathered, among others:

  1. Initial energy efficiency certificate (CEE), signed by a competent technician, which sets the starting point.
  2. Project or technical report for the works, depending on their scope.
  3. For building works, the current building inspection report (ITE). We explain the timescales and cost in our guide to the ITE in Barcelona 2026.
  4. The relevant licence or works notification. Depending on the scope it will be minor works, a notification or major works, as we explain in our article on the building permit in Barcelona.
  5. An itemised budget and, once the works are finished, the final CEE proving the saving achieved.

One important point: the grant can no longer be applied for. The Generalitat marks programmes 1, 3, 4 and 5 as "fora de termini" (out of time); for the first three it only accepts the procedure for existing files in progress that need changes. It also warns that, with the funding exhausted, new applications would go on a waiting list until budget is freed by withdrawals, refusals, revocations or lapses. Be wary of anyone who promises a grant 'paid in advance' or offers one as open without showing you the call currently in force.

What the renovation costs and what you get back: a realistic example

Let's look at a hypothetical case: an 80 m² flat in the Eixample within a full renovation with serious energy upgrades. Reference prices for Barcelona and Catalonia in 2026 fall in these ranges:

Item2026 price rangeCounts towards energy savings?
Full renovation (finishes, layout, installations)600 - 1,000 €/m²Energy items only
Window replacement with thermal-break frames (whole home)6,000 - 12,000 €Yes
Interior façade insulation40 - 70 €/m²Yes
Aerothermal heating installation8,000 - 15,000 €Yes
Kitchen renovation6,000 - 15,000 €No (except efficient appliances, where applicable)
Bathroom renovation4,000 - 9,000 €No

Say the justified energy items add up to 25,000 € and the certificate shows a reduction of at least 30% in non-renewable primary energy consumption (or class A or B). The 40% deduction is calculated on a maximum base of 7,500 € a year: at most 40% of 7,500 € in that tax return, with no carry-over to other years. A full renovation of that flat would cost roughly 60,000–80,000 €, of which only the justified energy items can qualify for the deduction. To understand what a job like this includes, read what a full renovation is and our guide to full renovation prices in Barcelona 2026.

Common mistakes that leave you without the grant

After many applications, these are the slips we see most often:

  • Starting the works before the file is in order, or without the initial CEE. This puts the works outside the deadline and leaves no way to prove the starting point.
  • Paying in cash: this cancels the IRPF deduction and makes it harder to justify the grant.
  • Confusing a cosmetic renovation with an energy renovation: changing floors or painting does not qualify for aid on its own.
  • Not coordinating with the community when the works affect the whole building (façade insulation, roof). The application is made by the community, not by an individual neighbour.
  • Forgetting the habitability certificate (cédula de habitabilidad) and other related documents. Check when you need it in our guide to the habitability certificate.

How we handle it at Tu Nuevo Piso

We work with a registered architect and our own site manager. This lets us draw up the project, process the licence and arrange the energy certificates as part of the service. You get a fixed quote with no surprises, with a clear split between the items that can be subsidised and those that cannot, so you know from day one what you can realistically get back. Many calls also ask contractors to show solvency, so check the requirements of each call. If you want to know why that matters, see what Greincat is and why it matters when choosing a renovator.

Frequently asked questions

Are the Next Generation grants still available in 2026?

Not for new applications. The Generalitat says the application period ended at the latest on 31 December 2025, or earlier if the funds ran out, and shows the funding as exhausted. For the works themselves, the IRPF energy-efficiency deduction is still available: according to the tax authority, up to 31 December 2026 for homes and up to 31 December 2027 for predominantly residential buildings.

Can I apply if the home is not my main residence?

It depends on the deduction. The 20% and 40% ones are limited to your main home or a home that is rented out (or intended to be, if it is let before 31 December 2027) and exclude second homes and tourist flats. The 60% one covers any type of owned home inside a predominantly residential building, except those used for economic activities. The Generalitat's Programme 4 required it to be the permanent main residence. If your aim is to rent it out, our guide to renovating a flat to rent out looks at returns and grants together.

How long does the grant take to be paid?

For files that had a grant awarded, the Generalitat provides for advance payments (bestretes) once the decision is notified, and says the amount not paid as an advance is processed when the supporting documents for the expenses and for full payment on completion of the works are submitted and accepted.

Can the IRPF deduction and the grant be combined?

Yes, they are compatible, but the base you deduct from is reduced by the amount of grant you receive. In practice you only deduct on the money you have paid yourself.

Can a low-cost renovation qualify for these grants?

Only if it includes works that improve energy efficiency and they are properly documented. A purely cosmetic renovation does not qualify for energy grants. If you are looking to optimise your budget, read low-cost renovation of a flat in Barcelona to decide where to invest.

Conclusion

The Generalitat's Next Generation renovation grants no longer accept applications, but the energy-efficiency deduction on income tax is still available for works up to 31 December 2026 or, in residential buildings, up to 31 December 2027. To make use of it, plan the paperwork well, pay without cash and document the saving with energy certificates from before and after. The key is to separate, from the start, which items can qualify for a deduction, and to design the works to achieve a real saving. At Tu Nuevo Piso we bring together design, licence, certificates and build, with a fixed quote and an honest price. If you want to know how much you could recover in your particular case, request a free, no-obligation quote and we will work out with you which deductions fit your renovation in Barcelona and Catalonia.

Sources

Keep reading

✆ Call✦ WhatsAppGet a quote →