Spend less and live better: insulation, windows, heat pumps and solar that cut the bill and raise comfort. With a study of the saving first, and help to claim the grants and deductions available.
Energy efficiency has an order. Do things in the wrong sequence and the money goes further than the saving. The right sequence is almost always the same: reduce the load first, then supply it efficiently. That means insulation and windows, then heating and cooling, then generation. Putting solar panels on a leaky house, or a heat pump in an uninsulated one, is buying the expensive end of the solution first.
So we start with a study. We look at your home, your bills and what you want, and give you a ranked list of measures with a cost and an estimated saving for each, so that you can see where the money works hardest. In many homes windows and roof insulation come first, a heat pump second, and solar third.
Support exists for much of this, and it changes. Grants, reduced VAT and an income-tax deduction have all been available at various points for efficiency works, and an energy certificate is often the evidence they ask for. We check what is open when you ask. See energy performance certificates, windows, insulation and heat pumps.

The study takes a few days; the works vary from a day (windows) to several weeks (façade).
We record the home, review your bills and obtain or review its energy certificate.
Measures listed in order of cost-effectiveness, with estimated savings and costs.
We check which grants, deductions and reduced VAT apply to the measures chosen.
Windows, insulation, heating and cooling, and solar as chosen, in a sensible sequence.
A new energy performance certificate, showing the improved rating.
Documents for any support claim, and warranties.
We visit and review your bills. No cost and no obligation.
A list of measures with costs and estimated savings, in order of payback.
One site manager coordinates the trades and the sequence.
A new certificate and the documents for any grant or deduction.
Load first, supply second, generation last.
You see the cost and the estimated saving of each measure before you commit.
If a measure will not pay back, we say so.
We identify what is open and prepare the documents.
You can show what the works achieved.
Windows, insulation, heating and solar in one programme.
Indicative ranges, VAT excluded.
| Package | What it covers | Indicative range | |
|---|---|---|---|
| Windows + insulation | Standard finishes, practical solution | From 6,000 € | |
| Heat pump + underfloor heating | Selected materials, best balance | 9,000 – 20,000 € | |
| Whole-home rehabilitation | Premium materials and high-end interior design | Depends on project |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Replacing windows with efficient ones: a quick and highly cost-effective improvement.
Insulating the envelope: the biggest lever for savings.
Replacing gas or oil heating with a heat pump and underfloor heating.
Self-consumption solar panels that produce your own electricity.
The saving depends on how you use the home as much as on what we install. An estimate from an energy model is a calculation, not a guarantee, and we say so when we give you one.
The scope of an efficiency project, and what is separate.
VAT is shown as its own line, and efficiency works can attract a reduced rate. Support is applied for, not promised, and we say clearly what depends on it.
Efficiency connects insulation, windows, heating and solar.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about reducing their energy use.
With the envelope: windows and the roof, where most of the heat is lost. Then efficient heating and cooling, such as a heat pump. Then generation, such as solar. Doing it in that order means the later, more expensive items can be smaller. We tell you the sequence that suits your home.
It depends on the home, the measures and how you live in it, so we give an estimate with its assumptions rather than a promise. In a poorly insulated home with an old boiler the saving from a coordinated package can be large; in an already efficient home it is modest. The study puts numbers on it before you spend.
At various times: grants for efficiency works, EU-funded programmes, reduced VAT, an income-tax deduction for improvements that raise the rating, and local property-tax discounts for solar. They change from year to year, are paid by the administration and usually require evidence such as an energy certificate. We check what is open when you ask.
Yes. Efficiency measures are among the easiest to do on their own: windows in a day, roof insulation in a few days, a heat pump in a couple of weeks. They do not require you to renovate anything else, although doing them with other works costs less.
It tends to. A better energy rating is increasingly something buyers and tenants look at, and a home with a good rating and comfort is easier to sell and let. It is not a fixed return, and it depends on the market. See energy performance certificates.
In stages tied to completed work, with a deposit on signing and a final payment at completion.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia. A ranked list of measures with costs and estimated savings.