Renovations · Vallès Oriental

Full home renovations in the Vallès Oriental: summer villas, thermal old centres and Montseny masías

We renovate in Granollers, Mollet and in the summer villa towns of La Garriga and Cardedeu. We know the Modernisme, the thermal old centre of Caldes de Montbui and the masías towards the Montseny. A fixed written quote and one site manager from start to finish.

Since 2010Free technical visitItemised quoteWarranty on the work

Fixed written quote
Vallès Oriental
Fixeda written, itemised quote
1 site managera single point of contact for the whole renovation
Freetechnical visit in the Vallès Oriental
Warrantyon the work
Renovations in the Vallès Oriental

Renovating in the Vallès Oriental,
with no surprises.

The Vallès Oriental combines city and countryside. Granollers and Mollet bring urban housing; La Garriga and Cardedeu keep the bourgeoisie’s Modernista summer houses and a historic spa; Caldes de Montbui holds its thermal old centre; and towards the Montseny masías and village houses appear. We know each type of building and its council, with a fixed quote and a single site manager.

  • Fixed quote before we start
  • A dedicated site manager on your renovation
  • Completion date in writing
  • Full handling of licences and permits
Work in progress shower tray in dark grey stoneware with relief tile wall and centred drain
Who it is for

Full renovations built around you.

These are the people we mostly work with in the Vallès Oriental. If you recognise yourself in one of them, we are a good fit:

Owners buying an older home

You have just bought — or are about to — an older building or house and want to make it yours, with new services and no surprises.

Families who want to re-plan their home

You need more light, one more bedroom or an open kitchen: we reorganise the layout so the house fits the way you live.

Investors looking to add value

You buy to renovate and sell or to let: we balance cost and finishes to get the most value out of the property.

Second-home owners

You are preparing a holiday home or a rental: a durable, low-maintenance renovation, with the habitability certificate and the energy certificate in order.

By type of building

Every building in the Vallès Oriental calls for a different renovation.

A Modernista villa in La Garriga and a flat in Granollers need different approaches. We fit the work to your home.

01

Modernista summer houses

La Garriga and Cardedeu: summer villas with a garden, galleries and protected features. We restore what is distinctive and modernise services and comfort.

02

Thermal and historic old centres

Caldes de Montbui and other centres: houses between party walls with old structure, damp and narrow streets that affect access.

03

Flats and blocks in Granollers and Mollet

Urban housing of the ’60s–’90s: functional renovation, re-planning and improved energy efficiency, with good connection to Barcelona.

04

Montseny masías and the rural Vallès

Sant Celoni, Cànoves, Aiguafreda: stone houses that call for structural reinforcement, insulation and heating for the inland climate.

Kitchens in the Vallès Oriental

Renovating the kitchen: from the Granollers flat to the La Garriga house

In many flats in Granollers or Mollet the kitchen is closed and narrow, and a common wish is to open it to the living room or gain worktop with an L-shaped or parallel layout. In the houses of La Garriga, Cardedeu or the villages towards the Montseny the opposite is often the case: there is room, but the services are old and the kitchen is far from the water supply and the consumer unit.

In both cases the quote is decided by the same items: units, worktop, appliances and services. We give it to you fixed after measuring the kitchen; to get an idea beforehand, see our pages on the price of renovating an 8 m² kitchen and a 12 m² one, with a real breakdown and excluding VAT.

  • Measuring and a fixed quote at no cost
  • New plumbing, drains and kitchen circuits
  • Made-to-measure units and a templated worktop
See kitchen renovations →
Units and businesses

Renovating a commercial unit in the Vallès Oriental

A unit in the centre of Granollers, on a shopping street in Mollet or on a ground floor in Cardedeu is renovated thinking first about the use: what activity it will have, what ventilation and smoke extraction it needs, what accessibility asks for and whether an activity licence is needed or a notification to the council is enough.

With that clear, we prepare the documents with registered technicians and carry out the work — services, flooring, lighting, accessible toilet — with a single site manager and a quote fixed item by item. We also study the change from unit to home when the planning allows it. More detail on commercial-unit renovations.

  • Activity licence or notification handled
  • Accessibility and ventilation settled in the project
  • Change from unit to home if the planning allows
See unit renovations →
How we work

How we work with you.

01

A survey wherever you are

We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.

02

Design and a fixed quote

A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.

03

Council paperwork

We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.

04

Works under a site manager, with a warranty

One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.

Why Tu Nuevo Piso

Why renovate with us in the Vallès Oriental.

We know the housing stock here

From the stone masía to the flat of the 1970s: we know what each type of building in the Vallès Oriental hides and what has to be renewed whatever happens.

Planning rules and the council

We file works notifications and licences with the relevant council, and coordinate with the community when common elements or the façade are touched.

A dedicated site manager

A single contact for the whole renovation, with regular photos and video of progress. No chasing five trades.

Fixed quote

A fixed price broken down item by item after the survey. What we sign is what you pay, with no last-minute extras.

Trusted trades in the area

Bricklayers, plumbers, electricians and joiners we already know, under one contract and one programme.

Warranty and technical support

A written warranty on the work, with a registered technical architect when the project needs one.

Prices

What it costs to renovate in the Vallès Oriental.

Indicative ranges in the Vallès Oriental, based on real quotes. The final price is always a fixed quote after the visit.

An 80 m² flat41,300 – 52,100 €3 bedrooms, a bathroom, a WC and a kitchen · 520–650 €/m² · VAT not included
A 120 m² house70,100 – 88,600 €4 bedrooms, 2 bathrooms and a kitchen · 580–740 €/m² · VAT not included
What it costs to renovate in the Vallès Oriental — Indicative prices · VAT not included
Quality levelWhat it coversPrice per m²
Basic / functionalStandard finishes, layout unchanged520 – 650 €/m²
High-end / luxuryPremium materials and exclusive interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. Not a binding offer: the definitive quote, fixed and broken down item by item, is always given after the free technical visit.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Basic / functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

What changes the price of a renovation in the Vallès Oriental

Restoring a Modernista villa does not cost the same as renovating a flat in Granollers. Beyond the €/m², these are the factors that move the price most:

Condition of the services

Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.

Age of the building

In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.

Changes to the layout

Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.

Quality of the materials

The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.

Permits needed

A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.

Access to the site

Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.

Councils and regulations

Licences and paperwork, sorted.

Granollers, La Garriga, Caldes… every council in the Vallès Oriental has its own procedure, and in protected old centres and villas there is a heritage review. We handle it all.

Works notification (minor works)

For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.

Major works licence

If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.

Building inspection (ITE)

The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.

Habitability and energy certificates

Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.

Reduced 10% VAT

On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.

Owners’ community

When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.

Grants

Grants for renovating in the Vallès Oriental.

If your renovation improves energy efficiency, you can recover part of the investment. We help you apply.

Next Generation funds

Grants for energy retrofits (insulation, windows, aerothermal heating), managed in Catalonia by ICAEN. We prepare the certificate and the application.

Agència de l’Habitatge de Catalunya

The Generalitat and the county councils publish calls for the renovation of homes and buildings. We assemble the technical documentation needed.

Income-tax deduction

For works that reduce the energy demand or consumption of the home. They apply according to the call and with the right documentation; we guide you.

What we renovate

Everything we renovate in the Vallès Oriental.

From the full renovation to a single trade. These are our most requested services.

See all services →
Pages for this city

Services with a page of their own in the Vallès Oriental.

How we handle each of these services in the Vallès Oriental, with prices and examples from the area.

Where we work

Vallès Oriental municipalities where we renovate.

We work across the whole comarca, with crews who know everything from the summer villa to the Montseny masía.

We renovate mainly in:

Granollers

The comarca’s capital: urban flats and blocks and houses in the centre to renew completely.

See renovations in Granollers →

La Garriga

Modernista summer villas and the spa, with protected features that we restore.

Cardedeu

Summer villas with a garden and village houses, between the residential and the stately.

See renovations in Cardedeu →

Caldes de Montbui and the Montseny

A historic thermal old centre and rural masías that call for structure, insulation and heating.

And also in:

Mollet del VallèsL'Ametlla del VallèsLa Roca del VallèsLes Franqueses del VallèsSant CeloniSant Fost de CampsentellesMontornès del VallèsMontmelóParets del Vallès
Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

Everything you need to know about renovating in the Vallès Oriental: prices, licences, timescales and grants.

How much does it cost to hire a renovation company in the Vallès Oriental?

As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. A flat of 80–100 m² usually lands between 30,000 and 60,000 €; restoring a Modernista villa or a masía goes well above that. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.

How much does it cost to renovate a bathroom or a kitchen in the Vallès Oriental?

As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.

What does your fixed quote include?

Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.

How do you avoid cost overruns?

With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.

How long does a full renovation take?

A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.

Do you work with architects and handle the licences?

Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.

Do you offer a warranty?

Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.

Are there grants or subsidies for renovating in the Vallès Oriental?

Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.

Can you restore a Modernista summer house in La Garriga or Cardedeu?

Yes. We restore galleries, joinery, gardens and protected features, modernise services and comfort, and apply for the heritage authorisation where it applies.

Do you renovate masías near the Montseny?

Yes. In masías we work on structural reinforcement (stone walls, beams), insulation and heating for the inland climate, respecting the character of the house.

Which municipalities in the Vallès Oriental do you work in?

Across the whole comarca: Granollers, Mollet, La Garriga, Cardedeu, Caldes de Montbui, Sant Celoni, La Roca, Les Franqueses and the rest of the municipalities.

How much does it cost to renovate a kitchen in the Vallès Oriental?

It is decided by the metres, the units, the worktop and the state of the services, not by the comarca. If you were looking for a kitchen-renovation quote or a new-kitchen quote in the Vallès Oriental, the path is the same: a free technical visit, measuring and a quote fixed item by item. As a reference, our kitchen-renovation price guides from 6 to 15 m² show real breakdowns, excluding VAT.

Do you renovate commercial units in Granollers, Mollet or Cardedeu?

Yes, across the comarca: fitting out services, accessibility, ventilation and the activity licence or the notification at the relevant council. The price of renovating a commercial unit in the Vallès Oriental depends on the use of the unit and the state it is in; that is why we give the quote for renovating a commercial unit fixed after visiting it.

Free quote

Ask for your quote, no strings attached.

A free technical visit in the Vallès Oriental and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →