If you are looking for a renovation quote in the Vallès, the first thing is to know which of the two: the Occidental (Sabadell, Terrassa, Sant Cugat) or the Oriental (Granollers). We renovate in both, with a fixed written quote, a free technical visit and a single site manager.
The Vallès is not one comarca but two. The Vallès Occidental has 23 municipalities, almost a million inhabitants and the particularity of having two capitals, Sabadell and Terrassa. The Vallès Oriental, with Granollers as its capital, brings together some 427,000 inhabitants spread over almost forty municipalities, among them La Garriga, which was a summer resort of the Catalan bourgeoisie. For anyone looking for a renovation quote in the Vallès the difference matters: renovating a city flat is not the same as renovating a house with a garden or a masía. We explain what changes.

The process is the same in both comarcas; what changes is the home and the council.
We go to the home, whether in Sabadell or a house on the outskirts, measure up, check the services and listen to you before proposing anything.
Broken down item by item and with a timescale in writing. What you sign is what you pay, with no last-minute extras.
One contact coordinates every trade from start to finish and keeps you updated on how the work is going.
We file the works notification or licence at your council, the habitability certificate and the energy certificate, and hand over with a warranty.
The two comarcas share a name and a closeness to Barcelona, but their structure is different. The Occidental is larger and more urban: Sabadell and Terrassa are capitals on equal terms, both with an industrial and textile past, and Sant Cugat is the junction from which the FGC branches run to both. To the south lies the Serra de Collserola and, to the north, the Sant Llorenç del Munt i l’Obac natural park. If your home is there, see full renovations in the Vallès Occidental.
The Oriental has Granollers as its capital and stretches towards the Montseny. There are more medium and small municipalities, and with them more houses, masías and detached housing. La Garriga, for example, was a summer resort of the Catalan bourgeoisie in the early twentieth century, and keeps Modernista buildings. For that area, you have full renovations in the Vallès Oriental.
The same quote does not work for the whole Vallès. These are the three most common situations.
In cities like Sabadell or Terrassa the commonest case is the flat in a building of several floors: you work with the community, the lift and hours, and the renovations are of services, layout and bathroom and kitchen. There is more on flat renovations.
Outside the urban centres houses, semi-detached homes and detached houses abound, and in the Oriental masías too. There the roof, insulation, climate control and outdoor space weigh in. See house renovations and masía renovations.
Community, lift and working hours; services and layout as the priority.
Roof, insulation, climate control and outdoor space weigh in the quote.
Old structure, damp and access that condition timescales and method.
These are real renovations we have done in the Vallès, with their metres and their weeks. Each links to its full project page: a house with views in Cerdanyola del Vallès (140 m², 12 weeks) and a flat with a terrazzo floor in Granollers (85 m², 4 weeks).
Also the bathroom with a corner bath and floral tiles in Sabadell (6 m², 2 weeks), the kitchen with a pastel hexagonal splashback in Sant Cugat (9 m², 2 weeks) and the black cloakroom with a basin on wood in Terrassa (7 m², 1 week).

If your home is in the Vallès Occidental, start with its comarca page and from it go to your municipality’s. If it is in the Oriental, use the Vallès Oriental page. Further down you have the main cities and every municipality with a page of its own.
If you would like a quick guide before asking for a visit, the budget calculator gives you a range by metres and finishes, and the pages on the price of renovating a bathroom or an 80 m² flat show you itemised examples.
We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.
A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.
We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.
One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.
Indicative ranges in the Vallès, based on real quotes. The final price is always a fixed quote after the visit.
| Quality level | What it covers | Price per m² | |
|---|---|---|---|
| Basic / functional | Standard finishes, layout unchanged | 520 – 650 €/m² | |
| Mid-range | Selected materials, possible re-planning | 750 – 940 €/m² | |
| High-end / luxury | Premium materials and exclusive interior design | 1,060 – 1,340 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Beyond the metres, these are the factors that change the quote of a Vallès home most:
Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.
In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.
Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.
The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.
A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.
Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.
Every municipality in the Vallès has its own works by-law; we file the notification or licence at the relevant council.
For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.
If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.
The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.
Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.
On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.
When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.
From the full renovation to a single trade. These are our most requested services.
These four have a page of their own with their particulars; below, the rest of the municipalities.
We renovate mainly in:
One of the two capitals of the Vallès Occidental and a city with a textile past: urban flat, neighbourhood house and bathroom or kitchen renovation.
See renovations in Sabadell →The other capital of the Occidental, served by Rodalies R4 and FGC: city housing and partial and full renovations.
See renovations in Terrassa →Capital of the Vallès Oriental and a station on Rodalies lines R2 and R8: flats and houses a comfortable distance from Barcelona.
See renovations in Granollers →The point where the FGC line forks towards Sabadell and Terrassa, with a stock of houses and semi-detached homes very different from the industrial cities.
See renovations in Sant Cugat del Vallès →And also in these Vallès municipalities:
Official boundary data for comarques and municipalities (ICGC, 2025).
Everything you need to know about renovating in the Vallès: prices, licences, timescales and grants.
As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. In the price section of this page you have two complete examples — an 80 m² flat and a 120 m² house — worked out from our own quotes; for your particular case use the calculator or ask for the visit. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.
As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.
Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.
With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.
A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.
Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.
Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.
Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.
Sabadell, Terrassa, Sant Cugat, Rubí, Cerdanyola, Barberà or Ripollet are in the Vallès Occidental. Granollers, Mollet, La Garriga, Cardedeu or Les Franqueses are in the Vallès Oriental. Both comarcas have a page of their own, linked above, and from it you reach the page for your municipality.
With this site’s calculator you get a guide in a minute, and with the free technical visit a fixed, itemised quote. The path is always the same: a visit, measuring and a written proposal, with a technical project when the work calls for one.
The cost depends on metres, the state of the services, re-planning and finishes. That is why we give a quote item by item after seeing the home, not a generic figure. As a guide, see the price section of this page and our price guides for an 80 m² flat and a 120 m² house.
That is perfectly fine. You have a real example in our Sabadell job (6 m², 2 weeks) and size guidance on our price page for a 5 m² bathroom. The process is the same as for a full renovation: a visit, a quote fixed item by item and a site manager.
There is no tariff by comarca: the price is set by the home, the access, the state of the services and the finishes you choose. A city flat and a house with a garden have very different quotes even in the same municipality. That is why we prefer to see the job before giving figures.
Yes, across the whole Vallès. The technical visit is free and with no obligation and, after it, you receive the fixed quote and the timescale in writing.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →A free technical visit in the Vallès and a fixed written quote. We reply within 24 hours.