Kitchen with a pastel hexagonal splashback in Sant Cugat
Carrer de Santiago Rusiñol, Sant Cugat del Vallès · 9 m² · 2026

Project details
- Floor area
- 9 m²
- Property type
- Flat
- Duration
- 2 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 16,000–18,000 €
- What we did
- Hexagonal splashback · Wooden worktop · Units up to the ceiling · LED lighting · Hexagonal floor
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A kitchen that dares: a splashback of pastel hexagons, a wooden worktop with a black sink and a black-and-white hexagonal floor.
Most new kitchens look alike; this one does not. The client chose a hexagonal tile in pastel shades — pink, blue, mustard, muted green — for the whole splashback, and the job was making that decision look easy.
The whole splashback was set out again so that the cuts fall where they cannot be seen, with the LED strip under the wall units grazing the tile. The wooden worktop with a black sink under the window and the white units up to the ceiling make a calm background so the hexagon can be the star.
On the floor, the same geometry in another key: large hexagons in white, black and grey, finishing against the wood laminate of the rest of the flat in a clean transition with no threshold strip. It is the kitchen of someone who knew exactly what they wanted.
If you are turning over a kitchen renovation in Valldoreix or elsewhere in Sant Cugat and want something with character, this hexagonal splashback is proof that daring pays off.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.






