Renovation guides, in plain English
What a renovation costs, which permits you need, how the rules work and what to ask a builder — for flats and houses in Barcelona and across Catalonia. 174 guides, each written for someone who does not know the Spanish system yet.
Leaks in the flat roof of a building with a Catalan-style roof: repair and maintenance
A leak almost never enters where the stain shows. Here is how to find the weak point of the roof and when redoing it is better than patching.
Commercial and communitiesActivity licence or works licence for a commercial unit: which comes first and how they fit together
The works licence and the activity licence are not the same thing, and they cannot be applied for in any order. Here is how they fit together before you rent or renovate a unit.
Prices and quotesRenovating a bathroom and kitchen at the same time: which items are shared
Combining bathroom and kitchen shares the paperwork, protection, rubble removal and cleaning. Both projects are still paid in full. Here is what counts in each case.
Guides and adviceThe technical visit before your renovation quote: what is checked and what to have ready
What the site manager checks in your flat, which papers to bring and which decisions to settle so the quote is a fixed quote and not an estimate.
Guides and adviceDamp patch on the ceiling: what to do with the upstairs neighbour and who pays
What to do in the first hours, how to talk to your neighbour and the insurers, and who is responsible depending on where the water leak starts.
KitchensL-shaped, U-shaped, single-wall or galley kitchen: which to choose for your space
The width of the room rules out layouts before taste does. Here is which one fits your kitchen and what work moving it to another wall involves.
Full renovationsRenovating a flat built before 1940: vaults, thick walls and impossible layouts
Vaults, thick walls and floors that are not level: what to keep, what you find when you open up and how to allow a margin in a flat built before 1940.
BathroomsSmall bathroom ideas: the building decisions that gain space
Shower instead of bath, a door that does not sweep the room, wall-hung toilets and continuous tiling: what really gains space in 3-4 m².
InstallationsCommunal central heating and your renovation: what you can change in your flat
Which part of central heating is yours and which belongs to the owners' community, so you can renovate without breaking the circuit or falling out with neighbours.
Commercial and communitiesAnnual maintenance plan for an owners' community: a month-by-month calendar
What to check in the building and in which month: roof and downpipes in autumn, façade and flat roof in good weather, and how to record it all for the ITE.
Materials and finishesLarge-format tile or metro tile: joints, rectified edges and which to choose
Rectified large-format tile gives thin joints and needs a flat wall; metro tile forgives uneven walls but has more grout to clean.
Guides and adviceCracks in walls and ceilings: which ones matter and which don't (partition vs structure)
How to classify a crack by appearance, position and movement, monitor it at home with a method, and know when to call a competent technician.
Guides and adviceAdapting a home for a wheelchair: doors, turning space, kitchen and home automation
Check the whole route through your home, from front door to bed: doors, turning space, floors, kitchen and automation, with working measurements and guide costs.
InstallationsRadiators not heating evenly: bleeding and balancing step by step
Cold at the top is air, cold at the bottom is sludge, the furthest one needs balancing. Here is what you can fix yourself and when to call a heating engineer.
Regulations and licencesJoining two flats into one: licence, structure, habitability certificate and owners' community
You can join two flats into one, but the route changes depending on whether you open a wall or a floor slab. Licence, structure, certificate, community and registry, in order.
Full renovationsRenovating a house in phases without wasting money: the order that protects work already done
A phased renovation goes from what protects the house to what you can see. What to prepare in each phase and which items repeat and push up the cost.
Regulations and licencesFrom project to electrical certificate: the technical paperwork of your renovation, in order
Renovation paperwork in four stages: before, during, at completion and at close-out. Who signs each document and what it lets you close next.
Guides and adviceRubble and skips in a renovation: real volumes, street permit and price
A 7.5 m² partition wall leaves around 1 m³ of rubble. Here is how to remove it, which permit to confirm with your town hall and what it usually costs per m³.
Show all 174 guides
What to check in a flat before buying it to renovate: a viewing checklist
Seven areas to check on the viewing and the work item each finding triggers, with guide figures, before you sign the deposit contract (arras).
Prices and quotesFunctional, mid-range or high quality: what changes in each item of a renovation
Quality shows in what you see and touch, not in what is hidden. We show you, item by item, where the price rises and where spending more is not worth it.
Full renovationsFull home renovation checklist: the decisions to make before you start
Scope, layout, services, finishes, materials, appliances and payments: what to decide and when, so your full home renovation does not grind to a halt.
Renovations by areaWhat type of flat you have, by Barcelona neighbourhood: building types and what a renovation finds
Five building types cover almost every flat in Barcelona. Find out which one is yours and what usually turns up once the work is opened up.
KitchensRenovating a kitchen step by step: what happens first and which trade comes in at each stage
Measure, order, demolish, install, tile and fit: the order of a kitchen renovation, which trade enters at each stage and what is checked before moving on.
BathroomsHow a bathroom is renovated step by step: the order of the works
Protection, demolition, drains, electrics, waterproofing, tiling and fittings: the order of the trades and what is tested before anything is covered up.
Guides and adviceWorking from home: how to build a real home office into your flat renovation
A home office works if the works include insulation, sockets, a network cable and task lighting. Four possible locations and the typical cost.
Guides and adviceWalk-in wardrobe: how much space it needs and when it fits in your flat
60 cm of wardrobe plus 90 cm of walkway: that gives the 1.50 m width of a single-run walk-in wardrobe and the 2.10 m of a two-run one, and it decides whether it fits.
Prices and quotesUsable or built area: which one to use when budgeting your renovation
Floors, paint and tiling are measured inside the walls. If a quote uses the square metres on the deeds, its price per metre can no longer be compared.
Prices and quotesSame square metres, double the price: the 6 factors that separate two quotes
Two quotes for the same flat almost never price the same job. These are the six factors that separate the price, each with its figure.
Prices and quotesWhich rooms make a renovation more expensive: bathrooms and kitchens versus bedrooms
A square metre of bathroom costs about 15 times a bedroom's, and a kitchen's about 3.5 times. Here is the calculation for each room, with the bedroom broken down.
Prices and quotesHow much does it cost to add a second bathroom to a flat (and where to put it)
2 m² cloakroom: 837-2,161 €. 4 m² full bathroom: 10,255-20,467 €. The toilet decides the location: the CTE allows it 1.00 m from the soil stack at most.
Prices and quotesFrom 80 to 100 m²: what really changes in a renovation budget
From 80 to 100 m² the functional budget rises by 15,596 €. The extra 20 metres add 4,372 €; the second full bathroom adds 9,418 €. Here are the numbers.
Prices and quotesWhy renovating a small flat costs more per square metre
In a 50 m² flat the bathroom, kitchen and services make up 58% of the budget, so each metre costs 660 € against 506 € in a 90 m² flat.
Prices and quotesFixed and variable renovation costs: which items do not depend on floor area
Bathroom, kitchen and services do not depend on floor area and make up 46 to 58% of a renovation. They set the floor below which a budget cannot go.
Prices and quotesWhy a renovation does not cost double when the flat is twice the size
From 50 to 100 m² the budget rises 79%, not double. The price per metre falls from 660 to 506 € until a second bathroom lifts it back to 590 €.
Prices and quotesWhat renovation can you do with your budget: 10,000 € to 150,000 €
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Guides and adviceTechnical architect fees and works supervision costs
What a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Full renovationsArchitect fees for a renovation: how much the project costs
What an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Full renovationsHow to choose materials for your renovation: a room-by-room guide
Not sure which materials to pick for your renovation? A practical room-by-room guide to floors, worktops, bathroom finishes and paint, with what to check.
Full renovationsUrgent damp and leak repair in your home: what to do first
Urgent guide to fixing leaks, damp and water stains at home for good. Diagnosis, what to do first, typical costs and solutions for 2026.
Guides and adviceWhen is the best time of year to renovate your flat?
Find out when to renovate your flat. How spring, summer, autumn and winter affect drying times, prices, builder schedules and works licences.
Guides and adviceRenovation vs new build: what makes sense and when to choose each
Renovation or new build in 2026? We compare costs per m², the CTE building code, taxes and timescales to help you choose the right option.
Full renovationsITE and 60s-70s buildings: aluminosis and structural reinforcement
How the building inspection (ITE) spots aluminosis and other defects in 60s and 70s buildings, and the modern structural reinforcement options.
Full renovationsUtilities in a rural masía: water, electricity and septic tanks
How a well, off-grid solar power and an approved septic system work in a masía, with the rules and costs to plan for before you renovate.
Full renovationsRehabilitating a stone masía: techniques and restoration steps
How to restore a traditional stone masía in Catalonia step by step: diagnosis, lime mortars, roofs, insulation, services and the legal rules.
Full renovationsRenovating a seaside home: salt, damp and materials
A technical guide to renovating a home by the sea in 2026: how to fight salt spray and choose the right windows, façades and coastal finishes.
Full renovationsHow much does it cost to renovate a flat in Barcelona? Prices per m²
What a renovation costs in Barcelona in 2026: prices per m² by quality level, a line-by-line breakdown, VAT rules and tips to avoid overruns.
Regulations and licencesRenovation guarantees and insurance: liability and ten-year cover
Planning a renovation? Learn the difference between civil liability insurance, ten-year structural cover and LOE guarantees, and what to ask for in 2026.
Guides and adviceRenovations in owners' communities: majorities, quorums and cost sharing
A 2026 guide to quorums, majority votes and how costs are shared for renovations in owners' communities, so you can avoid fines and disputes.
Guides and adviceRenovation grants in Catalonia: ICAEN, housing consortia and IBI relief
2026 guide to renovation grants in Catalonia: ICAEN funding, housing consortium aid and IBI property tax reductions for your flat.
Guides and adviceLow-cost decorating: how to refresh your home without building work
Refresh your home without building work or rubble: adhesive wall and worktop coverings, SPC flooring, paint and lighting, with guide costs for 2026.
Guides and adviceModernising a flat without building work: ideas and costs
How to modernise a flat without building work: floors, walls, bathrooms, kitchens and doors, with realistic price ranges for Spain in 2026.
Prices and quotesFull renovation quote: worked example and item-by-item breakdown
See a worked example of a full renovation quote for an 80 m² flat, broken down item by item, with costs, percentages and tips for 2026.
Guides and adviceUnexpected costs in a renovation: how much to set aside
How much of your budget to keep for surprises in a renovation. The rule of thumb by age of building, the usual hidden faults and how to protect your savings.
Guides and adviceHow to read and compare a renovation quote
A practical guide to reading and comparing full renovation quotes in Spain. Spot measurement tricks, hidden costs and surprise extras before you sign.
Property investmentWhich renovations add the most value and return to a flat?
Which renovations raise the rental yield and valuation of your flat in 2026? A detailed look at kitchens, bathrooms and building services, with figures.
Guides and adviceHow to split a renovation budget by trade
How to split a renovation budget across trades, with realistic percentages for licences, demolition, services, joinery and the kitchen, plus a contingency.
Full renovationsWhich part of a renovation costs the most?
Which budget item costs the most in a home renovation? We look at hidden installations, kitchens and bathrooms so you can avoid surprises in your budget.
Regulations and licencesCost of a renovation project (architect and technical architect)
What an architect's and technical architect's renovation project really costs in 2026: fee breakdown, PEM, endorsement fees and tips to save money.
Regulations and licencesHow much does a building licence cost in Barcelona?
What a building licence costs in Barcelona: the fee breakdown, the 3.35% ICIO works tax, the technical suitability report (IIT) and how to keep costs down.
Regulations and licencesEnergy performance certificate cost
How much does an energy performance certificate cost in Spain in 2026? We look at technician fees, regional charges such as the ICAEN and how to avoid fines.
Full renovationsJapandi, Mediterranean or industrial: which style to choose for your renovation
Japandi, Mediterranean or industrial? We compare these three renovation styles on materials, budget, technical feasibility and how to choose yours.
Energy efficiencyUnderfloor heating in a renovation: water vs electric
Thinking of underfloor heating for your renovation? We compare water and electric systems, real running costs, minimum build-up and floor compatibility.
Guides and adviceRenovation trends 2026: styles, kitchens and bathrooms
Discover the renovation trends for 2026: Japandi and Mediterranean styles, integrated kitchens and spa-style bathrooms for your home.
Full renovationsWindows for your renovation: PVC vs aluminium and double or triple glazing
The definitive 2026 guide to windows for your renovation: PVC vs aluminium with thermal break, double or triple glazing, and budget tips.
KitchensKitchen worktops: Silestone, Dekton, granite or porcelain
Thinking of changing your worktop? We compare Silestone XM, Dekton, granite and porcelain: pros, cons, prices and what to expect in everyday use.
Materials and finishesWhich floor to choose: porcelain, parquet, microcement and vinyl compared
A practical comparison of floors for 2026 renovations: porcelain stoneware, parquet, microcement and SPC vinyl, with costs, pros, cons and installation.
InstallationsHome automation in a renovation: KNX, Zigbee and smart home
Plan home automation into your full renovation. We compare KNX reliability, Zigbee flexibility and what Matter brings. An expert guide for 2026.
Guides and adviceThermal and acoustic insulation in a renovation: materials and where to fit them
Plan thermal and acoustic insulation in your renovation. Which materials to choose, where to fit them and how they cut noise and energy bills.
Guides and adviceRestoring hydraulic tile floors in Eixample flats
Expert guide to restoring hydraulic tile floors in grand Eixample buildings in Barcelona: the step-by-step process, common defects and design options.
Energy efficiencySolar panels and self-consumption at home: savings and feasibility
A 2026 guide to home solar self-consumption: technical feasibility, installation costs, payback time and income tax deductions of up to 40%.
Materials and finishesTypes of paint for your home: emulsion, enamel, mineral and stucco
A 2026 guide to paint for the home. We compare emulsion, enamel, mineral paint and stucco: the differences, best uses and coverage per litre.
KitchensOpen vs closed kitchen: pros, rules and when each one makes sense
Open or closed kitchen? We compare the pros and cons, the habitability rules in Catalonia and when each layout makes sense for your home.
Guides and adviceDIY renovation or hiring a company? The real risks and savings
Thinking of a DIY renovation in Spain? We compare its real savings with hiring a company: technical risks, 2026 rules and a hybrid option.
Guides and adviceInterior design vs renovation: what each service includes
Choosing between an interior designer and a renovation contractor? A clear guide to what each professional service covers in your home.
Guides and advicePaint, decorate or renovate? How far each option really goes
How far painting, decorating or renovating your flat can take you, with the technical limits, a cost comparison table and practical tips for 2026.
Guides and adviceRenovator, builder or renovation company: which one to choose?
Not sure whether to hire a self-employed renovator, a builder or a renovation company? We compare costs, advantages, risks and legal responsibilities.
Regulations and licencesArchitect vs technical architect: who you need for your renovation
Architect or technical architect? A plain guide to which professional your renovation needs, when an architect is compulsory and how to keep costs down.
Full renovationsCommon renovation mistakes and how to avoid them
The most common mistakes when renovating a home in Spain, from hidden costs and missing permits to cheap quotes and old wiring, and how to avoid each one.
Full renovationsRenovating an inherited flat: steps, costs and decisions
Inherited a flat and not sure whether to renovate, sell or rent? An expert guide to the legal steps, real 2026 works costs and taxes.
Full renovationsCan you live at home during a renovation? What to consider
Is it realistic to stay in your home while the builders work? We look at dust, noise, loss of basic services and how to plan around it.
Full renovationsHow long does a renovation take? Timescales by type and size
How long a renovation takes in Barcelona: realistic timescales for a bathroom, kitchen, flat or large home, and the delays to plan for.
Property investmentRenovating a flat to sell: what pays off and what to avoid
Find out which renovations really raise the sale price of your flat in Spain, and which costly mistakes to avoid to protect your net profit margin.
Full renovationsUrgent repairs and renovations in Barcelona: damp, leaks and breakdowns
Expert 2026 guide to fixing leaks, urgent breakdowns and damp in Barcelona: costs, legal responsibilities and step-by-step building solutions.
Renovations by areaRenovating a flat in Gràcia: old buildings, no lift and neighbours
How to renovate an old flat in Gràcia, Barcelona: carrying materials with no lift, structural defects, permits and getting on with the neighbours.
Restoration and façadesCommon defects in Eixample buildings (Cerdà): ITE, courtyards and façades
The most common structural defects in Barcelona's Eixample buildings in 2026. A guide to the ITE inspection, damp, downpipes and façade repairs.
Guides and adviceWhat is the Consorci de l'Habitatge? Barcelona housing grants
What the Consorci de l'Habitatge in Barcelona is, what it does, its 2026 renovation grants and how to apply for them successfully.
Commercial and communitiesOwners' community and renovation works: rules you need to know
A 2026 guide to how a Spanish owners' community works, its role in renovations, the limits on your works and the votes and permits you need.
Regulations and licencesCOAC visado: what it is and when it is required
What the Catalan architects' college (COAC) is, how project visado works, when it is compulsory in 2026 and how it affects your renovation.
Regulations and licencesWhat is ten-year building insurance (seguro decenal)?
What ten-year building insurance covers under Spain's LOE, who must take it out, the role of the OCT and how it affects renovations and new builds.
InstallationsWhat is the REBT? The low-voltage electrotechnical regulation
What the REBT is, Spain's low-voltage electrical regulation, its technical instructions (ITC-BT) and the key changes that affect homes in 2026.
Energy efficiencyWhat is a thermal break (RPT)?
What a thermal break (RPT) is, how the polyamide strip in aluminium window frames works and why it matters for your renovation in 2026.
Regulations and licencesWhat is the RGSEAA?
What the RGSEAA is, who must register with it and how it affects the design and renovation of food premises in Spain. Clear, practical guide.
InstallationsWhat is the ICP (power control switch)?
What the ICP power control switch is, how the old physical device became a digital meter limit, and how it affects your renovation work in 2026.
Energy efficiencyWhat is the ICAEN?
What the ICAEN (Catalan Energy Institute) is, what it does in the energy certificate register and how it affects your renovation.
Full renovationsWhat is the IEE? The building evaluation report (Informe de Evaluación del Edificio)
The complete guide to the IEE building evaluation report in Spain: what it is, when it is compulsory, how it differs from the ITE and how to apply for it.
Full renovationsWhat is an open quote and why you should avoid it
Been offered an open quote for your renovation? Here is what it means, the real risks of accepting one and how to lock in your costs.
Regulations and licencesWhat is a prior works notification? Immediate vs deferred rules
Planning a renovation? Learn what a prior works notification is, how immediate and deferred types differ, waiting times and fines to avoid in 2026.
Regulations and licencesWhat is minor works?
What counts as minor works, which interior renovations avoid a full project and how to file the permits quickly and avoid fines.
Regulations and licencesWhat is major works (obra mayor)?
What a major works licence means in Spain, how it differs from minor works, the usual requirements, timescales, fees and when you need an architect.
Full renovationsWhat works direction is and when it is compulsory
What works direction is, who does what between architect and technical architect, when the LOE requires it in 2026 and how it affects your renovation.
Full renovationsThe site manager: role, duties and why it matters
What a site manager does, their key duties on a building job, how they differ from the works director and why their role helps your renovation succeed.
Guides and adviceWhat is a technical architect (aparejador) and what do they do?
What a technical architect (aparejador) does on site, what they check, when a project legally needs one and how they protect your budget.
InstallationsWhat is underfloor heating?
What underfloor heating is, how it works, water versus electric systems, the cost per m², the trade-offs and how to fit it in a renovation.
Energy efficiencyWhat is aerothermal heating?
What aerothermal heating is, how a heat pump works, how much it can save, what it costs to install and the grants available in 2026.
Materials and finishesWhat is microcement and where is it used?
What microcement is, its pros and cons, where to use it (floors, bathrooms, kitchens) and why it has become a go-to finish for 2026.
Energy efficiencyWhat is SATE (external thermal insulation system)?
What SATE external thermal insulation is, how its layers work, which panels to choose and what it means for your building under the 2026 Building Code.
Regulations and licencesWhat is a POUM urban plan across Catalonia?
What the POUM (municipal urban plan) is in Catalonia, how it affects home renovations and masías in 2026 and the latest planning changes.
Regulations and licencesWhat is a structural soundness certificate?
What a structural soundness certificate is in Spain, when it is required for renovations or activity licences, and who is qualified to sign it.
BathroomsWhat is a shower screen? Types and how to choose one
Thinking of renewing your bathroom? What a shower screen is, the main types by opening style, glass and frame, and expert tips on choosing one.
Materials and finishesWhat is Climalit glass and how to choose the best specification for your new windows?
What Climalit glass is, how double glazing works and how to choose the right specification for your new windows. Genuine Climalit explained.
Full renovationsWhat is a Catalan-style flat roof? Full guide to the ventilated terrace
What a Catalan-style flat roof is, how its ventilated air chamber cools the home passively, its layers, pros and cons, and what it means for renovations.
Full renovationsWhat is modernista architecture and what does renovating it involve?
What modernista architecture is, its most valuable features such as hydraulic mosaic floors, and the heritage rules and technical issues of renovating one.
Full renovationsWhat is a finca regia?
What a finca regia is: grand late nineteenth and early twentieth century buildings in Barcelona and Madrid, their features and renovation challenges.
Regulations and licencesWhat is the Libro del Edificio? The building logbook explained
Do you know what the Libro del Edificio is and why it is compulsory? Its structure, the existing-building version (LEE) and how it affects your renovation.
BathroomsElectrical protection zones in a bathroom: ITC-BT-27 explained
What the electrical protection zones in a bathroom are under ITC-BT-27 of Spain's low-voltage regulations (REBT). Safety volumes, limits and practical tips.
BathroomsBathroom waterproofing: materials, CTE rules and common mistakes
How to waterproof a bathroom during a renovation. Materials, the CTE building code rules and the common mistakes that lead to damp and leaks.
Guides and adviceBathroom renovation quote: items, fittings and how to save without losing quality
What a bathroom renovation costs in 2026. A full breakdown of the items and fittings, and how to cut costs without losing quality.
BathroomsBathroom renovation in Barcelona: complete guide to prices, materials and timescales
Bathroom renovation in Barcelona for 2026: prices by quality level, recommended materials, town hall rules and realistic timescales.
KitchensWhich services to renew when renovating a kitchen: electrics, gas and plumbing
A 2026 guide to renewing the electrics, gas and plumbing in a kitchen renovation: regulations, modern materials and practical advice for the site.
KitchensKitchen renovation materials: worktops, wall tiles and flooring
A 2026 guide to kitchen renovation materials in Spain: a technical comparison of worktops, wall tiles and flooring, with real installed prices.
KitchensKitchen renovation budget: items, materials and how to stay on track
What a kitchen renovation costs in Spain in 2026, the main budget items, worktop and cabinet material choices, and practical ways to keep costs under control.
Prices and quotesFixed quote vs open quote in renovations: what it means and why it matters
Not sure whether to choose a fixed or open quote for your renovation? We explain the key differences, risks and advantages, and how to decide in 2026.
Full renovationsHow to plan a full home renovation step by step: order of works and phases
A step-by-step guide to planning a full home renovation in Spain in 2026: the right order of works, the phases and how to avoid costly delays.
InstallationsHome drainage explained: soil stacks, waste pipes and CTE HS5
A technical but practical guide to home drainage: how soil stacks and waste pipes work, and the CTE HS5 rules that apply to renovations.
InstallationsPlumbing installation in a home: pipes, drainage and CTE rules
How to plan home plumbing in 2026: pipe materials, drainage, traps and the CTE DB-HS 4 and HS 5 rules, explained for renovation projects.
InstallationsReplacing pipes in a flat: when it is needed, materials and cost
Is it time to replace the pipes in your flat? Learn when a plumbing renewal is essential, which materials to use (multilayer, PEX) and what it costs in 2026.
Full renovationsWhat is a General Protection Box (CGP)? Function, rules and when it is replaced
What a general protection box (CGP) is, what it does, the REBT rules that apply and when it must be replaced in 2026, with typical costs.
InstallationsREBT and ITC-BT home electrical rules: a practical guide
A practical guide to the REBT and ITC-BT rules for home electrical installations in 2026: electrification grades, circuits, protection and your certificate.
InstallationsWhat is a home consumer unit: parts, rules and when to replace it
What a home consumer unit (fuse board) is, its key parts under the Spanish low-voltage rules (REBT) and when it is time to replace it. A 2026 guide.
Regulations and licencesElectrical certificate (CIE) in Barcelona: what it is and how to apply
What the electrical certificate (CIE) is, when you need it and how to get one in Barcelona in 2026, plus the difference from the Catalan BRIE.
InstallationsHome electrical installation: full guide to the board, circuits, certificate and rules
A 2026 expert guide to designing or renewing a home's electrical installation: distribution board, circuits, the CIE certificate and REBT rules.
Full renovationsWhen you need an architect or technical architect in Barcelona
When the law requires an architect or technical architect for a renovation in Barcelona, which council procedure applies and what their fees usually cost.
Regulations and licencesReduced 10% VAT on renovations: when it applies and how to benefit
When you can pay the reduced 10% VAT rate on renovation work in Spain in 2026. The three conditions, the 40% materials rule and practical tips.
Full renovationsRenovation budget: how to estimate the cost of a flat
Work out a realistic renovation budget for your flat: line items, quality levels, VAT, permits and a contingency fund, with no nasty surprises.
Renovations by areaRenovating a flat in Barri Gòtic: protected buildings and permits
Renovation guide for the Barri Gòtic and Ciutat Vella: Barcelona's heritage catalogue, deferred prior notifications and the structural challenges on site.
Full renovationsChoosing a renovation company in Barcelona: criteria and key questions
How to choose a renovation company in Barcelona: five technical checks, the questions to ask at interview and the clauses to put in your contract.
Regulations and licencesRenovation guarantees: LOE, legal deadlines and how to claim
Full 2026 guide to renovation guarantees in Spain. We explain the LOE deadlines, the Civil Code and how to claim hidden defects successfully.
Regulations and licencesIRPF deduction for renovations: when it applies and how to prove it
How to claim the IRPF income tax deduction for energy-efficiency renovations in 2026: the three bands, the deadlines and the paperwork the Tax Agency expects.
Energy efficiencyEnergy certificate in a renovation: what it is for and how to improve it
What the energy certificate is for in a 2026 renovation, how it can unlock income tax deductions and practical ways to raise your energy rating.
Full renovationsRenovation permits and legal documents in Barcelona: full guide
Planning a renovation in Barcelona in 2026? See which permits and legal documents you need, what they cost, and how to avoid fines of up to 6,000 €.
Full renovationsRenovation company vs self-employed renovator: differences, pros and risks
We compare the real differences, pros and risks of hiring a renovation company or a self-employed renovator in Spain in 2026.
Guides and adviceRenovating a flat vs buying one already renovated in Barcelona: cost and return analysis
Should you buy a flat to renovate or buy one already renovated in Barcelona in 2026? Works costs, transfer tax, licences and practical return tips.
Property investmentFull vs partial renovation: when each makes sense and how to decide
Full or partial renovation? We compare costs, timescales, licences and taxes to help you make the right investment decision for your home.
Full renovationsRenovating a masía (traditional stone farmhouse) in Catalonia: licences, materials and common mistakes
A 2026 guide to renovating a masía in Catalonia: the new rural rules, licences, traditional materials and the costly mistakes to avoid.
Full renovationsRenovating a Second Home in Catalonia from a Distance
Expert guide to renovating your detached house or second home in Catalonia from a distance in 2026: costs by region, licences and water rules.
Full renovationsRenovating an old building in Barcelona: outdated services and defects
Practical guide to common defects, outdated services and fixes when renovating older homes in the Eixample or Ciutat Vella.
Full renovationsFull home renovation: complete guide for owners in Barcelona
A full home renovation covers everything from reorganising the layout to renewing all the services and finishes. This guide explains what it includes, what it costs and how to plan it in Barcelona.
Restoration and façadesFaçade rehabilitation in Barcelona: when it is required and costs
If your residential block is close to 45 years old, the ITE can require you to rehabilitate the façade. We explain when it is compulsory, what it costs per m² and which deductions can reduce the bill.
Renovations by areaRenovations in Sant Cugat del Vallès: houses and high-end flats
Sant Cugat has large houses with gardens and quality flats, where renovation focuses on comfort, energy efficiency and upper mid-range to high-end finishes. We explain prices, timescales and local specifics.
Commercial and communitiesCommercial renovation in Barcelona: restaurants, offices and shops
Renovating a commercial unit in Barcelona is a business project where the activity licence, timescales and compliance matter as much as the design. This guide explains how to approach restaurants, offices and retail.
Renovations by areaRenovations in L'Hospitalet de Llobregat: Prices and Guide
L'Hospitalet is the second most populous municipality in Catalonia, with many flats from the 60s and 70s that are ideal for renovation. We explain prices, technical features and how to plan your renovation.
Full renovationsLuxury renovations in Barcelona: high-end finishes and materials
A luxury renovation in Barcelona is not just about expensive materials. It is design, integrated home automation and flawless execution with a single point of contact. Here is what defines one and what it costs.
Renovations by areaCosta Brava renovations: detached houses, masías and second homes
Renovating a home on the Costa Brava means planning for sea air, the outdoor areas and a pool that is often the heart of the property, and co-ordinating the works even when you live far away. This is the full guide.
Guides and adviceHow to renovate a small flat (under 50 m²) in Barcelona
Practical strategies for renovating a flat under 50 m² in Barcelona: gaining usable space, multiplying storage and making use of every centimetre.
Property investmentRenovating a flat to rent out: returns, timescales and priorities
What to renovate and what to leave alone when the aim is to rent: priorities, timescales and figures to get the most from your investment without overspending.
Renovations by areaRenovating an old flat in Barcelona's modernist Eixample
What makes renovating an old flat in the modernist Eixample different, and how to combine mouldings, courtyards and high ceilings with new services.
Guides and adviceTurnkey flat renovation in Barcelona: how it works
A turnkey renovation in Barcelona means one point of contact, a fixed quote and coordinated works from start to finish. Here is how it works, step by step.
Prices and quotesLow-cost flat renovation in Barcelona: what to prioritise
Low-cost renovation does not mean shoddy work. It means setting priorities: investing where it matters, saving where it will not show, and avoiding the cuts that end up costing twice as much.
Full renovationsTerrace and balcony renovation in Barcelona: waterproofing and design
How to renovate a terrace or balcony in Barcelona without leaks. Good waterproofing is what separates a job that lasts for years from one that causes problems.
Full renovationsLiving and dining room renovation: open kitchen, floors and light
The living-dining room is the heart of the home. Here is how to renovate it in Barcelona: opening the kitchen, getting the floor right and making the most of natural and artificial light.
KitchensKitchen renovation in Barcelona: prices and trends for 2026
What a kitchen renovation costs in Barcelona today, how opening the kitchen to the living room changes the price, and which layouts and materials are trending in 2026.
GlossaryWhat is a full home renovation? What it includes
What a full renovation means, which items it normally includes and how it differs from a partial renovation, with guide figures from the Barcelona market.
GlossaryHabitability certificate in Catalonia: when you need one
What the habitability certificate in Catalonia means, which operations require it, and how it is obtained after a renovation or change of use.
GlossaryWhat is Greincat and why it matters when choosing a renovator
What Greincat is, what it means for a renovation company to be a member of the association, and why membership is a sign of reliability when you hire for your building work in Catalonia.
GlossaryWhat is the CTE (Technical Building Code)?
What the CTE is, which basic documents make it up, and how it affects your renovation in terms of safety, energy efficiency, noise and accessibility.
Guides and advicePlasterboard or brick partition: which to choose for your renovation
Choosing between plasterboard and brick for new walls? We compare both systems on weight, sound insulation, moisture, price and timing so you can decide on clear criteria.
Materials and finishesMicrocement in Barcelona: price, application and where to use it
Microcement is a popular choice in Barcelona renovations because of its seamless look. Here is what it costs, how it is applied and which surfaces suit it best.
Regulations and licencesBuilding licence in Barcelona: minor works, notice and major works
Before starting a renovation in Barcelona you need to know whether a prior notice is enough or whether you need a major works licence. We explain the three regimes, timescales and paperwork.
Regulations and licencesITE building inspection in Barcelona 2026: rules and cost
The building inspection (ITE) is compulsory in Barcelona for residential blocks before they reach 45 years of age. We explain the requirements, deadlines, cost and what happens if the inspection finds serious defects.
Swimming poolsHow much does a built-on-site pool cost in 2026? Price table by size
A current price table for built-on-site pools by size and type, plus the running costs and the rules you must follow in Catalonia.
Materials and finishesFloor renewal without building work in Barcelona: options and prices
Renewing a floor does not always mean breaking up the old one and creating rubble. Here are the options for changing floors without building work in Barcelona, with guide prices and the cases where each one works.
BathroomsChanging a bath for a shower in Barcelona: cost, timing and ideas
Everything you need to know about swapping a bath for a shower tray in Barcelona: what it costs, how long it takes and which options work best.
Grants and subsidiesNext Generation grants and IRPF deduction for renovations in Catalonia
The Next Generation renovation grants no longer accept applications, but the IRPF income tax deduction for energy-efficiency works is still available. Here are the percentages, the requirements and the tax authority's deadlines.
InstallationsAerothermal and climate control in a full renovation: 2026 guide
A full renovation is the best moment to switch to aerothermal heating and sort out year-round climate control. Here is how it works, what it costs and which grants you can use in 2026.

