ITE and 60s-70s buildings: aluminosis and structural reinforcement

By the Tu Nuevo Piso teamPublished 26 July 20269 min read

Picture the scene. You are about to buy that characterful flat in Barcelona, or your owners' community has just received notice to carry out the building inspection (ITE). You check the land registry record: 1968. This was a period of rapid development, with neighbourhoods expanding and construction rushed. In the 60s and 70s, the speed at which blocks of flats were built for the thousands of families moving to the big cities overshadowed technical quality control.

But that construction haste left debts that, in 2026, we as a society are still paying. When an inspector visits a building from this era, they know exactly what to look for. The builders were not acting with bad intent. They simply trusted a material that promised to set in record time, twenty-four hours, but hid a latent chemical instability [1]. Aluminosis, carbonation and the resulting corrosion of reinforcing steel are silent defects.

Does this mean you should be scared of these homes and run away from them? No. Today there are very advanced diagnostic techniques and structural reinforcement systems that are so well established that repairing this damage is routine, safe and clean. Let's be clear about this.

Key summary for owners in 2026:
  • The problem cement: Aluminous cement sped up construction in the sixties, but at the cost of critical molecular instability when moisture is present.
  • The importance of prevention: Aluminosis is only destructive if water is present. Detecting leaks or drips in bathrooms early is the best shield.
  • The ITE as a technical safeguard: Passing this inspection prevents bigger problems. See the ITE in Barcelona: official requirements and prices.
  • Effective structural reinforcement: Proprietary systems such as steel Mecanoviga joists or lightweight carbon fibre save buildings without resorting to costly structural demolition.

The rush of the 60s and 70s: why these buildings fail

To understand why these buildings fail, we need to briefly look back. During the development boom in Spain, housing demand was voracious. Construction firms wanted to cut costs and shorten timescales. The technical quick fix came in the form of aluminous cement (CAC). This cement reached its maximum strength in one day, compared with the twenty-eight days needed by traditional Portland cement.

Manufacturers of pre-stressed joists for ceilings were quick to adopt it. But nobody anticipated that aluminous cement would undergo an unavoidable physical change. When exposed to temperatures above twenty-five degrees and constant humidity, its compounds crystallise, causing a sudden loss of more than fifty per cent of its load-bearing capacity.

When old buildings of this period are renovated, slabs in poor condition are often found. Old lead pipes that have dripped imperceptibly for forty years trigger this weakness, wearing away the supports without the neighbours noticing at all.

What is aluminosis, and how does it break down concrete?

It is vital to dispel fear. A ceiling containing aluminous cement does not mean it will collapse tomorrow. Affected joists can perform their function for decades if they are kept dry. But water turns the danger into a real and worrying structural problem [1]. The process runs through three clearly defined phases:

  • Crystalline conversion: The concrete changes its nature, reducing its microscopic volume. The material becomes brittle, sandy and soft to the touch.
  • Loss of protective pH: High porosity allows carbon dioxide from the air to get in. As the pH of the concrete mix drops, the steel inside loses the layer that protected it from the air.
  • Oxidation of the reinforcement: When wet, the steel bars corrode. Because rust takes up six times the volume of sound iron, the internal pressure bursts the concrete walls of the slab.

So if you suspect the condition of the structure, the first legal step to clear up any doubts seriously is to call in an expert who will issue a structural soundness certificate after assessing the stability of the ceiling.

The decisive role of the ITE in protecting communities

The building inspection (ITE) was created to prevent tragedies in buildings of this kind, which are now well over forty-five years old. This mandatory check, which assesses the overall condition of the property, is recorded in the official building assessment report (IEE).

But it is not only about the interior joists in individual flats. In an owners' community, the façades also show the wear of the years. It is common to find defects linked to the typical defects in Eixample buildings, such as balconies cracked by moisture ingress or tiles falling off in the courtyards.

If an ITE rates the state of the joists as a serious or very serious defect, there is no option to ignore it. Owners must carry out urgent repairs within the deadlines set by the authorities, to avoid coercive fines.

Rigorous diagnosis: scientific tests versus visual suspicion

Do not let a builder diagnose aluminosis in your building simply by tapping the ceiling with a hammer. Even when there are visual signs, absolute certainty only comes from careful laboratory tests:

  • Qualitative chemical analysis: Specific reagents are applied to samples taken from the structure to detect free alumina in significant concentrations [1].
  • X-ray diffraction (XRD): A test that analyses the internal arrangement of the concrete crystals to show the level of molecular degradation.
  • Compression tests: Tests that measure the real force the slab can withstand under direct physical pressure.

Repairing these defects changes the structure of the building. It is therefore essential to know when an architect is compulsory to lead and sign off these structural strengthening projects. Do not skimp on supervision: always consider hiring qualified staff and checking the fair price of a technical architect and site supervision to make sure the physical work is carried out correctly on the block.

Structural reinforcement techniques in 2026

Fortunately, aluminosis is not a death sentence for a building. There are now very quick and reasonably priced proprietary reinforcement systems:

Telescopic steel joists (Mecanoviga)

Adjustable steel profiles are installed just below the damaged concrete joist. They are firmly anchored into the load-bearing walls and mechanically tensioned. The new steel piece takes all the bending stress from the slab above, so the old joist is relieved of any load indefinitely.

Carbon fibre strips (CFRP)

If the joist keeps its concrete in relatively good condition and only has slight losses in the steel, thin strips of carbon fibre resin can be bonded to the underside of the structural member. They carry very high tensile forces without adding much real weight to the building, and they require very little invasive building work.

Functional replacement with thixotropic mortars

This involves breaking out and removing the damaged concrete, thoroughly brushing the rusted reinforcement to clean off the corrosion, applying a high-quality rust-passivating coating, and rebuilding the outline of the joist with structural mortars enriched with the latest generation of microfibres.

Quick comparison of common structural defects

To make them easier to understand, this detailed technical table brings together the most common defects found in residential buildings constructed in Spain in the late sixties and during the seventies:

Structural defectOriginal causeClear visual signUsual repairUrgency level
Active aluminosisAluminous cement exposed to moistureSagging ceiling, falling pieces, longitudinal cracksSupport with a metal Mecanoviga joistVery high / priority
General carbonationIngress of CO2 from the airParallel cracks, rust stains on the slabPassivating treatment and screed build-up with technical mortarMedium / high
External cladding failureAgeing and damp in claddingCracks on terraces or falling pieces from the public façadeHire façade renovation in BarcelonaHigh (risk to pedestrians)
Roof leakDeterioration of old bitumen membranesRepeated drips, mould and peeling on the top floor ceilingWaterproofing in line with the Technical Building CodeHigh
Foundation settlementPoor ground consolidation or leaks from the drainage networkSevere diagonal cracks in partitions and doors that stickDrainage repair, sealing downpipes or resin injectionMedium (monitor closely)

Managing the works and funding them as a community

Structural work in common areas is daunting because it requires considerable special levies. Even so, remember the rules of the owners' community: works that provide stability and structural soundness to the building are compulsory for all neighbours. No owner can refuse to pay on the grounds of disagreement, because collective safety is at stake.

To ease this financial effort, there are significant public grants in 2026. The Next Generation grants in Catalonia remain in force. They can cover a large share of the costs of structural renovations if you coordinate the work with improving the building's insulation. It is a fantastic opportunity to resolve serious structural risks permanently while also reducing the energy bills households pay each month.

Frequently asked questions about building inspections and structural defects

How long does it usually take to repair a ceiling with aluminosis?

It depends on how many joists are affected and on the technique chosen. If a dry telescopic system with machined steel is used in a standard eighty square metre flat, the work can take between ten and fifteen full working days. The big advantage of this modern solution is that it does not require propping up the whole building for weeks, which keeps disruption and noise to a minimum. It is a very focused job: the fitter removes the false ceilings, mechanically inserts the new steel support profiles, tensions them and closes the ceiling again quickly and cleanly with plaster or plasterboard.

Is it possible to buy or sell a property that has aluminosis?

Yes, it is legally possible, as long as the buyer knows the exact condition of the building. The situation must be recorded in the pre-contract deposit agreement (contrato de arras) to avoid future claims for hidden defects. The seller is also obliged to provide both the latest technical ITE report and the building logbook (libro del edificio), which should set out these reports and any repair plans approved by the neighbours. Be careful, though, because some state banks and lenders place financial obstacles on a mortgage if the ITE rates the building as seriously deficient and unresolved.

What is the exact difference between aluminosis and carbonation?

The main difference lies in the original cause of the defect. Aluminosis is caused by using a specific type of chemically unstable cement (ultra-fast-setting aluminous cement). Carbonation, by contrast, is a natural breakdown of ordinary Portland concrete. It happens when carbon dioxide slowly enters the concrete mass and gradually reduces its alkalinity, which removes the natural protection the steel has against rust. Both defects attack the strength of the slab, but aluminosis involves an instant, destructive molecular change that is accelerated by continuous exposure to hot, humid environments.

Can aluminosis be considered dangerous if the flat stays dry?

As a general rule, it does not pose an imminent risk of collapse if the relative humidity in the home stays very low. However, you should never become complacent. A small invisible leak at the bidet, a crack in the shower tray or slight leaks from the rainwater gutters is enough to trigger the destructive process of cement transformation. A slab built with this fast-setting cement will always be a system under suspicion. To live with peace of mind, the advisable course is to have technicians carry out periodic inspections, apply waterproofing paints and keep a close watch that no damp is in direct contact with the joists.

Does the community's insurance pay for these reinforcement repairs?

Almost certainly not. Comprehensive building insurance policies usually cover only accidental, sudden and unforeseen events, such as a forest fire, a sudden flood from a burst main downpipe or damage from storms. Damage caused by aluminosis or by the ageing of materials is legally classed as a defect in the building's construction, a concrete pathology or plain wear from obsolescence over time. The full costs must therefore be shared equally among all owners through the special levies approved at the owners' meeting.