Commercial and communities

Owners' community and renovation works: rules you need to know

By the Tu Nuevo Piso teamPublished 17 July 202610 min read

Living in a block of flats or an estate in Spain has many advantages, but it also means entering a delicate balance of legal rules that is not always easy to digest. You share walls, main pipes, roofs and, above all, collective decisions. When you decide to change the look of your home, or when the building starts crying out for renovation, the owners' community becomes far more important than many people expect.

Clashes with the chair of the building, reminders from property managers and endless arguments at meetings are classics of urban life in Spain. But how far do your neighbours have the right to interfere with your renovation? And the other way round: what power do you have to demand that the crumbling façade that spoils the street is finally repaired? Let us look in detail at how this close and sometimes delicate relationship is managed.

Key points from this article

  • The owners' community is governed strictly by the Horizontal Property Act (LPH) and its own by-laws (estatutos).
  • For minor works that are purely cosmetic inside your home, you do not need the community's approval, but you do need to give formal notice.
  • Touching structural elements, load-bearing walls or changing the external appearance requires the community's approval by large majorities.
  • Planning a full home renovation properly means checking the legal status of the property in advance.
  • Obtaining basic habitability paperwork, such as the habitability certificate (cédula de habitabilidad), can be affected if the building's rules are not respected.

What exactly is an owners' community, and how does it work in Spain?

In essence, an owners' community is the legal body that brings together all the owners of the different flats, premises and garages in a building that is divided under the horizontal property regime. This means you are the absolute master of what happens inside your own home (private property), but at the same time you share a percentage of co-ownership over everything else: the lift, the entrance hall, the downpipes, the roof and the ground the building stands on (common elements).

This dual nature is what usually causes the most typical misunderstandings. Many people think that, because they have paid for their flat, they can do whatever they like in any corner of it. That is not the case. The Horizontal Property Act (LPH) makes it very clear that your individual rights end where they put the safety of the rest of the building at risk, alter its external appearance or harm the enjoyment of other neighbours. The daily management of this web of interests falls to three key figures:

  • The community president: an owner who legally represents the building in all official matters.
  • The property manager (administrador de fincas): an external professional who manages the accounts, arranges insurance and gives legal advice.
  • The owners' meeting (Junta de propietarios): the supreme body where budgets, special levies (derramas) and future works on the building are voted on.

Inside your home: your real rights and limits when carrying out works

Suppose you finally have the budget and the enthusiasm to turn your old flat into a fully renovated one. What freedoms do you have, and where do the community's restrictions begin? To start with, you have every right to modify the architectural elements, installations and finishes in your private area, but under very explicit conditions. Article 7.1 of the LPH states that these works must not undermine or alter the safety of the building, its general structure or its external appearance, nor harm the rights of another owner.

So, if you plan works that only affect non-load-bearing partitions, kitchen and bathroom finishes or interior electrical installations, you do not need anyone's permission. The law does, however, oblige you to inform the community's representative in advance that the works are starting. In practice, that means filling in a simple letter to the president or the property manager. This stops the neighbours from getting annoyed when they first hear hammering through the wall.

But things change if you need a prior works notice, or if the municipal technicians classify your work as a minor work. If your flat is in Catalonia or Madrid, the type of procedure will vary depending on each municipality's by-laws. For example, if you are carrying out complex works in the Catalan capital, you will need to apply correctly for the relevant Barcelona works licence so that you are fully covered in case of inspections by the City Police (Guàrdia Urbana) or complaints from neighbours.

Communal works: when and how are renovations of shared areas decided?

The real headache for most neighbours usually comes from works that affect the whole building. Painting the staircase, changing the entrance, replacing asbestos downpipes or installing a lift where there was none before. Community works are traditionally divided into two categories: mandatory works, which do not need a vote to be carried out because they are imposed for the safety or habitability of the property, and improvement works, which require agreement and majorities within the owners' meeting.

When it comes to major works, such as structural renovation or façade rehabilitation to fix serious problems with falling debris, the room for manoeuvre of owners who do not want to pay is very small. The community has a legal duty to keep the building in perfect safety. For works of this technical and legal scale, it is essential to get advice from an architect or technical architect in Barcelona, or elsewhere, to draw up the technical projects, direct the work and avoid greater problems.

If the work is not mandatory but purely an improvement (for example, installing a security camera system or replacing the entrance floor with imported marble), the majorities set out in the Horizontal Property Act apply strictly. Not everything goes. If the improvement exceeds the equivalent of three ordinary monthly service charges, owners who voted against it are not obliged to pay their share of the special levy. However, they will not be able to enjoy the benefits of the improvement either, if that is technically possible to limit.

The duty to maintain the building: inspections and laws

One of the main triggers for communal works in recent years is the requirement to have buildings inspected regularly. Time takes its toll, and the current regulatory framework is very strict about maintaining our housing stock. That is why the mandatory Building Evaluation Report (IEE) must be arranged. It is a control document that analyses not only the structural condition of the building, but also universal accessibility and energy efficiency standards.

At regional level, especially if you own a property of some age, you will come up against the technical building inspection (ITE). Passing the ITE in Barcelona determines the outcome of the community's finances. If the appointed technicians find serious or very serious defects, the community has no choice but to urgently approve special levies and start the repairs. Ignoring these repair orders can bring heavy coercive fines from the town hall and, on top of that, very serious problems with insurance if an incident occurs in the shared access areas.

We should also not lose sight of the legal guarantees that back these works. If the community commissions full renovations, it is essential to know what legal protection covers it against poor workmanship or hidden defects by the building firms. Applying the LOE renovation guarantee protects neighbours against defects that affect habitability or stability within the periods set by law.

Table of majorities and works permits in owners' communities (2026)

So that you do not get lost in the paperwork and the endless debates about which majority is needed for each thing on the staircase, we have put together this summary table covering the typical cases in residential buildings:

Type of workDoes it need a meeting?Majority requiredWho pays the cost
Interior cosmetic renovation of the flat (without touching load-bearing walls)No (only prior notice to the president)None (it is an individual right of the owner)The owner carrying out the renovation
Removing architectural barriers (mandatory ramp or lift)Yes (to coordinate the technical project)Mandatory without a vote if requested by a disabled person or someone over 70 (subject to a cost limit)All the owners of the property in proportion to their share
Installing a new lift (not previously mandatory)YesSimple majority of owners and participation sharesThe whole community (including dissenters if approved by this majority)
Repairs for mandatory maintenance (deficient ITE/IEE)Yes (to choose the contractor and budget)No majority required for approval (it is a legal duty to maintain)The whole community, mandatorily through a special levy
Non-mandatory cosmetic improvements to shared areas (e.g. changing the entrance without damage)YesThree-fifths majority of owners and sharesThose who vote in favour (dissenters are exempt if the share exceeds 3 monthly service charges)
Installing electric vehicle charging points in a shared garageNo (only mandatory prior notice)None (individual right of the parking space user)The owner interested in the installation, for their own electrical supply

Practical tips for avoiding conflict during a renovation

Let us be honest: nobody enjoys waking up at eight in the morning to the noise of a drill going through the ceiling above them. Or finding the lift covered in plaster dust and bits of brick rubble. To prevent your relationship with your neighbours from falling apart during the months your private works last, the best approach is to use common sense and follow a few simple but effective guidelines:

  1. Give plenty of notice: Put a polite notice on the entrance noticeboard a few days before work starts. Briefly explain what you are going to do and roughly how long it will take, and leave your phone number in case of any urgent problem.
  2. Stick strictly to rest hours: Each municipality sets the hours during which noisy work and noisy machinery are allowed in homes. Generally, work is allowed Monday to Friday from 8:00 to 21:00. Heavy machinery should be limited from 20:00 onwards, and almost any disturbing noise is prohibited at weekends.
  3. Keep shared areas clean: Works dust gets into every crack. Require the renovation company to clean the lift, the stairs and the entrance every day if its workers dirty them while carrying rubble and building materials up and down.
  4. Take photos of shared areas beforehand: A good way to protect yourself from unfair claims is to photograph the landing walls, the lift cabin and the entrance before the first worker comes through the door. That way you can show whether a scratch on the mirror was already there or whether your removal crew really caused it.

In the end, behaving with empathy and transparency towards the community will save you legal headaches and awkward moments every time you bump into your neighbours on the landing.

Frequently asked questions (FAQ)

1. Do I need permission to change the floor or paint my home?

No. You do not need the community to vote on or authorise cosmetic works such as painting, changing the floor, tiling the bathroom or renewing the kitchen units. It is enough to tell the president or the property manager when the works start, as a courtesy, so that they are prepared for the comings and goings of workers and the normal noise.

2. What if I want to knock down a partition to join the kitchen and living room?

Here the situation changes completely. If the partition is load-bearing or affects the overall structure of the building, you will need a project from a technician and, almost certainly, prior approval from the owners' meeting because you are altering common elements of the property. You will also need the corresponding municipal licence in order.

3. What happens if the community votes against installing a lift that I need?

If a person with a disability, or someone over seventy, lives or works in the home, installing the lift becomes mandatory, provided the annual cost passed on does not exceed twelve ordinary monthly service charges. This applies regardless of the initial refusal of the other owners.

4. Who pays for damage caused to the stairwell by the renovation?

The owner who is carrying out the renovation of their home is directly and solely responsible for repairing any material damage, excessive dirt or breakage that removal crews or labourers cause to the building's shared areas. They must cover this from their own funds or through the insurance taken out for the renovation.

Keep reading

✆ Call✦ WhatsAppGet a quote →