Full renovations

Full home renovation: complete guide for owners in Barcelona

A full home renovation covers everything from reorganising the layout to renewing all the services and finishes. This guide explains what it includes, what it costs and how to plan it in Barcelona.

By the Tu Nuevo Piso teamPublished 3 July 202620 min read

Indicative prices · VAT not included. Not a binding offer.

A full home renovation covers everything from reorganising the layout to renewing all the services and finishes. This guide explains what it includes, what it costs and how to plan it in Barcelona.

A full home renovation is the complete overhaul of a property, from reorganising the rooms to updating every service and finish, with the aim of transforming and modernising the home from top to bottom. It is not about painting and changing a few pieces of furniture. It means working on the interior structure, the electrical and plumbing installations, the floors, ceilings, joinery, bathrooms and kitchen. The end result is, in practice, a new flat inside the original walls.

This guide is for owners and investors in Barcelona and Catalonia who are weighing up whether a full renovation makes sense, what to expect from the process and how to avoid the most common mistakes. The prices here are guide figures reflecting today's market in the city of Barcelona. Every job is different, and only a fixed quote for the specific flat gives real figures.

Key takeaways: the essentials of a full renovation

Before going into detail, these are the points every owner should be clear on before starting a full home renovation:

  • A full renovation includes the layout, services (electrics, plumbing, climate control), floor coverings, wall tiling, joinery, painting and finishes.
  • The guide price in Barcelona ranges between 520 and 940 €/m², depending on the finishes chosen and the condition of the building. High-end materials can go above that range.
  • An 80 m² flat takes between 8 and 14 weeks under normal conditions, counting only the on-site work.
  • In Barcelona, most full renovations need a major works licence if the structure is touched or the layout is changed; a minor one is enough if the work is limited to finishes and interior services.
  • The electrical certificate (CIE) and the plumbing installation certificate are required to make the installations legal and to reconnect supplies after the work.
  • Asking for a fixed quote in writing, with a memo of finishes and itemised line items, is the best protection against financial surprises halfway through.
  • Site management, led by a technician or by the renovation company itself, makes the difference between keeping to schedule and dragging out delays.

Table of contents

What is a full home renovation?

A full renovation is the most complete intervention you can carry out on a home. Everything is renewed, from the interior layout to the last light switch, including pipes, floors, ceilings and joinery. It is not just a matter of looks. It means bringing the home up to date technically and legally, which is especially relevant in Barcelona's older housing stock, where many flats have installations from the 60s or 70s that do not meet current rules.

Full renovation vs partial renovation: which do you need?

The difference is one of scope. A partial renovation works on one or several specific areas, for example renewing the bathroom, changing the kitchen or updating the electrical installation. A full renovation works on the whole home at the same time, in a coordinated way.

A full renovation makes most sense when the general condition of the flat is poor or when the owner wants a different layout. Carrying out a series of partial renovations in an older flat tends to cost more in the long run and causes repeated disruption. If the flat is more than 30 years old and has not been touched, the electrical installation most likely has no earth connection, the pipes may be lead or fibre cement, and the floors are probably worn out. In that case, a full renovation is the most efficient option.

Benefits of a full renovation: value, comfort and efficiency

A full renovation has a direct impact on a home's market value. According to property sector data in Barcelona, a renovated flat can sell or rent for between 20% and 40% more than an unrenovated one in the same building, depending on the area and the finishes. Beyond the financial value, the everyday benefits are tangible: better energy efficiency thanks to insulation and modern equipment, safe and legalised installations, and a space adapted to how the family actually lives today.

Aerothermal heating is an example of an installation that only really makes sense in a full renovation, because it requires the climate control to be planned together with the duct or underfloor layout from the start. Adding it afterwards, once the work is finished, multiplies the cost and the disruption.

What does a full renovation include? Key components

A full renovation covers every item of work involved in the interior construction of a flat: layout, installations, coverings and finishes. Here is a breakdown of what gets touched.

Layout and partitions: making the most of the space

Reorganising the layout is one of the first decisions made in the project. It involves knocking down existing partitions and building new ones to adapt the floor plan to the owner's needs. New partitions can be built in brick or block, in plasterboard (gypsum board on a metal frame) or in lightweight concrete block.

Plasterboard is the most common choice in today's full renovations, because it is quick to build, lets pipes and cables run inside it, and gives good sound and thermal insulation when combined with mineral wool. It is not suitable for damp areas without the right treatment, and bathrooms need a specific moisture-resistant board.

Installations: electrical, plumbing and climate control

The installations are the technical core of any full renovation and, in older flats, often the part that brings the most surprises. The electrical installation must comply with the REBT (Low-Voltage Electrotechnical Regulation) and its complementary technical instructions ITC-BT. In practice this means a new consumer unit with circuit breakers and residual-current devices, an earth connection on every circuit, and copper cabling with the right cross-sections for each use.

Old blocks in the Eixample often show the same problems: installations with no earth connection, aluminium wiring or cables buried in the wall without conduit, and a fuse box with ceramic fuses that protect nothing. The real extent is only known once the wall is opened, which is why a technical project before the work matters so much.

Plumbing covers replacing the whole supply network (hot and cold water) and the drainage system. In flats more than 40 years old, lead or galvanised steel pipes need replacing with multilayer or copper pipe, and fibre-cement drains with PVC. Climate control, if included, is planned in this phase so the position of the units, ducts and vents is coordinated with the rest of the work.

Finishes: floors, walls, ceilings and joinery

Finishes are what you see, but their quality depends largely on what lies underneath. Good porcelain stoneware laid on a badly levelled base will cause problems. The most common floors in full renovations in Barcelona are porcelain stoneware (in bathrooms, kitchens and hallways), solid wood or high-density laminate parquet (in bedrooms and the living room), and microcement (in bathrooms and contemporary kitchens).

Ceilings are usually finished in smooth plasterboard or, in more classic flats, with plaster mouldings. Interior joinery, including doors and built-in wardrobes, is decided at this stage and has a significant impact on the total budget.

Kitchens and bathrooms: the stars of the renovation

Kitchens and bathrooms account for most of the cost of a full renovation, because they bring together installations, tiling, flooring, fittings and appliances. A well-renovated bathroom, with proper waterproofing under the tiles, a new shower or bath, sanitary ware, taps and ventilation, can cost between 9,500 and 19,800 € depending on the quality. A complete kitchen, with units, worktop, appliances and plumbing, easily ranges from 4,800 to 10,300 €.

Waterproofing in bathrooms and kitchens is an item nobody sees, and it cannot be cut back. Tiling without a proper waterproof membrane underneath ends in damp and in more building work within a few years.

Phases of a full renovation: step by step

A full renovation follows a logical order that should not be changed without consequences: first demolition, then installations, then closing up the walls, and finally the finishes. Skipping phases or overlapping them incorrectly is the most common cause of delays and of having to undo finished work.

1. Planning and design: the technical project

Before a single wall is touched, you need a technical project signed by an architect or technical architect where the work requires one, or at least a written memo of finishes and detailed floor plans. This document sets out the final layout, the chosen materials, the planned installations and the fixed quote by line item. Without it, the work is improvised and costs rise sharply.

2. Demolition and clearance: the start of the transformation

The partitions that are going are knocked down, the existing floor is lifted, the sanitary ware and old kitchen are removed, and the false ceilings are taken out. Clearing debris from a flat in Barcelona has its particularities: the use of the lift or stairs must be coordinated with the owners' community, and an authorised waste manager must be hired, because rubble cannot go in ordinary bins.

3. Installations: the skeleton of the home

With the flat stripped back, all the chases for the electrical cabling are cut and run, the plumbing and drainage pipes are installed, and the door frames are fitted. This phase is critical because once a wall is closed there is no going back without breaking it open again. The position of sockets, switches, light points and data outlets is also set here.

4. Brickwork and insulation: structure and efficiency

New partitions are built, thermal and acoustic insulation is installed in walls and ceilings where needed, and the levelled screed is laid for the new floors. The CTE (Spanish Technical Building Code) sets the minimum insulation requirements by climate zone. In Barcelona, climate zone C2, the thermal transmittance values of the DB-HE section must be met.

5. Tiling and flooring: the base of the finishes

Ceramic wall tiles go on in bathrooms and kitchens, with the mandatory waterproofing laid beforehand in wet areas. Then the floors in the rest of the home are laid. The order matters: tiling first, then flooring, so that the edges and trims finish neatly.

6. Joinery: doors, windows and cupboards

Interior doors, built-in wardrobes and, if planned, new exterior joinery (windows and balcony doors) are fitted. Exterior joinery has implications for the building permit and the rules of the owners' community, especially in protected buildings in the Eixample or the Gòtic.

7. Painting and final finishes: the visible touch

Chases are filled with plaster, sanded, and the paint coats are applied. The kitchen units, sanitary ware, taps, electrical fittings and light fixtures go in. This is the most visible phase, but it also suffers most if the earlier phases were not done properly.

8. Cleaning and handover: your new home

Once the finishes are complete, the site is given a thorough clean, all installations are tested, and the electrical certificate (CIE) and the plumbing installation certificate are submitted to the competent bodies. Only with these documents can the electricity and water supplies be reconnected legally.

How much does a full renovation cost in Barcelona? Guide prices per m²

The cost of a full renovation in Barcelona ranges, as a guide, between 520 and 940 €/m² for standard to upper-standard finishes. Some jobs come in lower with basic finishes, and others range between 1,060 and 1,340 €/m² with premium materials. These figures include labour, materials and management, but not kitchen furniture or appliances, which are quoted separately.

Factors that affect the price: finishes, condition and complexity

The condition of the building is the most decisive factor, and the hardest to estimate without seeing the flat. A building from the 60s with its original installations and joists and hollow-tile floors will create more unforeseen problems than a 90s flat with more recent installations. The type of building matters too: a modernist block in the Eixample has 3-metre ceilings, plaster mouldings and protected elements that must be kept or restored, which makes certain jobs more expensive.

The finishes chosen have a direct impact. Large-format porcelain stoneware (60×120 cm or bigger) costs more in material and labour than a standard 30×60 cm ceramic tile. Solid oak parquet costs three times as much as an entry-level laminate. And the kitchen can range from 4,800 € with catalogue units to 19,500 € with bespoke joinery and a Silestone or marble worktop.

Cost breakdown: materials, labour and permits

ItemApproximate % of the total budgetNotes
Demolition and clearance5–8%Includes waste management
Electrical installation10–15%Consumer unit, circuits, electrical certificate
Plumbing and drainage8–12%Complete replacement of pipework
Brickwork and partitions8–12%New partitions, screed, render
Tiling and flooring12–18%Very variable depending on the material chosen
Interior and exterior joinery10–15%Doors, wardrobes, windows
Kitchen and bathrooms (excluding furniture)15–20%Sanitary ware, taps, waterproofing
Painting and finishes6–10%Includes plaster and preparation
Project and site management5–8%Depends on complexity and whether it needs sign-off
Licences and municipal fees1–3%Varies by municipality and type of work

Examples of budgets by type of home

TypeFloor areaGuide range (mid-range finishes)
Small flat (1 or 2 bedrooms)45–60 m²27,000–54,000 €
Medium flat (3 bedrooms)75–100 m²45,000–90,000 €
Large flat or penthouse120–150 m²88,500–128,700 €

These ranges are a guide and do not replace a fixed quote for the specific flat. A flat of 80 m² in good condition can be renovated for 55,000 €; the same flat with all the installations to be replaced and a new layout can reach 75,000 €. The only way to know the real figure is to visit the property and draw up a project.

How long does a full renovation take? Realistic timescales

A full renovation of an 80 m² flat in Barcelona takes, under normal conditions, between 8 and 14 weeks of on-site work. On top of that comes the preparation time for the project and the licence, which can add between 4 and 12 weeks depending on the type of permit required.

Factors that affect duration: size, complexity and management

Size is the most obvious factor, but not the only one. A complex redesign involving the demolition of load-bearing walls (with the corresponding permit) lengthens the job. The condition of the installations matters too: if the whole horizontal drainage has to be redone because the drains run inside the slab, that adds weeks. And surprises in older buildings, which do occur, always turn up.

Coordinating the trades is where time is won or lost. If the electrician does not finish cutting the chases before the bricklayer closes the walls, or if the sanitary ware is not on site when it is due to be fitted, the chain breaks. A company with its own trades or regular subcontractors coordinates this much better than an owner managing each trade separately.

Tips for keeping to schedule: planning and coordination

The most effective way to keep to schedule is to have every decision made before work starts: materials chosen, kitchen units ordered (they take 6 to 10 weeks to make), and sanitary ware and taps confirmed. The most frequent delays are not on-site delays but waiting for materials that were not ordered in time.

Asking the company for a works programme with weekly milestones, and reviewing it every week, is another concrete measure. It is not asking too much. It is the minimum for a job of 50,000 € or more.

Licences and rules for full renovations in Barcelona

Every full renovation in Barcelona needs some form of municipal authorisation, and working out which one applies is one of the first tasks in the technical project.

Major and minor works licences: differences and procedures

A major works licence is needed when the renovation affects structural elements, alters the façade or significantly redistributes the space. It requires a technical project signed by an architect and visado (professional sign-off by the college). The Barcelona City Council's electronic headquarters has details of the procedure; processing times vary, but for housing works they are usually between 2 and 4 months.

A minor works licence (or a works notification in some municipalities) covers smaller interventions: changing interior installations, renovating a bathroom or kitchen without touching the structure, and tiling and flooring. It does not require a signed-off project, although it does need a written description and a budget. In Barcelona city, many full renovations that do not touch the structure or façade are processed as minor works, which speeds up the timescales considerably.

Applicable rules: CTE, REBT and municipal ordinances

The CTE (Spanish Technical Building Code, published in the BOE) is the technical reference for habitability, insulation, accessibility and structural safety in any renovation above certain thresholds. The REBT, which in Catalonia is administered by the Generalitat, regulates low-voltage electrical installations and must be complied with in any renovation that touches the electrical installation.

Barcelona also has municipal ordinances covering the protection of elements in listed buildings, working hours and the use of shared areas in the building. In the Eixample, for example, many blocks have façade or interior protection that limits what can be demolished or altered.

The importance of the electrical certificate and installation certificate

The electrical certificate (CIE, the certificate of electrical installation) confirms that the home's electrical installation complies with the REBT. It is issued by the authorised electrical installer and is essential for the distribution company to reconnect the supply after the renovation. Without it, the electricity cannot be legally connected.

The same applies to the certificate for the plumbing and drainage installation. These are not mere formalities: they are the guarantee that the installations are safe and have been carried out properly. A company that does not hand over these documents at the end of the job, or that tells you it will sort them out later, is a clear warning sign.

Choosing the right renovation company in Barcelona

Choosing the right company is probably the most important decision in the whole process. A full renovation is a months-long job, costing tens of thousands of euros, with your home in the middle of it. It should not be chosen on price alone.

Fixed quote and no surprises

The fixed quote is the document that sets the total price of the work, broken down by line item, with the memo of finishes included. It is not an estimate or a rough figure. If the company cannot give you a fixed quote in writing before starting, you cannot know how much you will end up paying.

Open quotes or quotes with provisional sums are the most common cause of disputes on site. Clauses such as "tile prices do not include the material" or "unforeseen items are extra" must be read carefully and negotiated before signing.

Full project management and site supervision

Site supervision is the role of coordinating the trades, checking the quality of the work, managing the timescales and acting as the owner's technical contact during the job. On complex full renovations, having a technician or a company take on this role is the difference between a job that moves forward in an orderly way and one where each trade works without coordination.

In-house trades and written guarantees

A company with its own trades, or with regular subcontractors it works with steadily, has much more control over quality and timescales than one that subcontracts whoever is available for each job. Ask directly: is the electrician yours, or do you look for one each time? The answer says a lot.

The written guarantee is another non-negotiable element. The law sets guarantee periods (one year for finishing defects, three years for damage to habitability elements, ten years for structural defects under article 17 of the LOE), but a reputable company puts this in writing in the contract, with a clear procedure for claims.

Experience and references in Barcelona

Barcelona has particularities that not everyone is aware of: modernist blocks with protected elements, Eixample flats with installations from the 60s, buildings in the Gòtic with timber floors, and owners' communities with strict internal rules. A company with real experience of the city knows how to manage all of this. One coming from elsewhere, or with no completed work here, may run into surprises that you end up paying for.

Ask for references for similar jobs, visit one if you can, and look for recent reviews. Do not settle for catalogue photos.

Frequently asked questions about full renovations

What is the difference between a full renovation and a partial renovation?

A full renovation works on the whole home at the same time: layout, installations, floors, ceilings, joinery, kitchen and bathrooms. A partial renovation works only on one or several specific areas, such as renewing the bathroom or changing the kitchen, without touching the rest of the flat. A full renovation is more efficient when the general condition of the property is poor or when you want to change the layout.

How much does it cost to renovate an 80 m² flat in Barcelona?

As a guide, a full renovation of 80 m² in Barcelona with mid-to-high finishes falls in a range of 41,300 to 75,300 €, depending on the condition of the flat, the complexity of the layout and the materials chosen. These figures do not include kitchen furniture or appliances. Only a fixed quote for the specific flat gives the real figure.

How long does a full renovation take?

A full renovation of an 80 m² flat takes between 8 and 14 weeks of on-site work under normal conditions. On top of that, project and licence processing can add between 4 and 12 weeks. The main factors that lengthen the job are the condition of the existing installations, the complexity of the layout and delays in getting materials delivered.

Do I need a building licence for a full renovation in Barcelona?

Yes, in almost all cases. If the renovation touches the structure or significantly redistributes the space, a major works licence is needed, with a signed technical project. If only the interior installations, finishes, bathrooms or kitchen are renewed without touching the structure, it is usually processed as a minor works licence or works notification, with shorter processing times. The Barcelona City Council keeps up-to-date information on its electronic headquarters.

Is the electrical certificate compulsory after a full renovation?

Yes. Any renovation that changes the home's electrical installation requires an authorised electrical installer to issue the electrical certificate (CIE) when the work is finished. Without this document, the distribution company will not reconnect the electricity supply. It is also the guarantee that the installation complies with the REBT and is safe.

Can I live in the flat during a full renovation?

In practice, it is not advisable. During the demolition, installation and brickwork phases, the dust, noise and interruptions to supplies (water and electricity are cut off in stages) make the home uninhabitable. Most owners find alternative accommodation for the 8 to 14 weeks the work takes. If the renovation is partial and the flat can be divided into zones, it might be workable, but in a complete full renovation it is very difficult.

What if the flat is in an old building in the Eixample?

Old Eixample buildings have features that complicate and raise the cost of a renovation: electrical installations with no earth connection, lead or fibre-cement pipes, iron joists with ceramic hollow-tile infill, and in many cases heritage protection of the façade or interior elements. All of this must be checked before quoting, because the cost of replacing whole installations or restoring protected elements can be significant. A technician with experience of this type of building is essential.

How can I tell whether a quote I am given is reliable?

A reliable quote is broken down by line item with units of measurement (square metres, linear metres, units), includes a memo of finishes with the brands or references of the materials, and has a closed total price. If the quote is a single overall figure with no breakdown, or if any line says "price to be confirmed", it is not a fixed quote. Always compare at least three quotes from different companies and make sure they are pricing exactly the same work.