Storage that uses every centimetre. We design and make fitted wardrobes and dressing rooms to measure, floor to ceiling and adapted to your alcove, with an interior planned around how you actually dress.
A armario empotrado is a wardrobe built into the wall or an alcove, and in a Spanish flat it is the standard way to store clothes. The reason to have one made to measure is simple: no catalogue wardrobe fits an alcove exactly, and the gaps above, beside and behind it are lost storage and collected dust.
A made-to-measure wardrobe goes to the ceiling, fills the alcove wall to wall, and its interior is planned for what you put in it: hanging height for long and short garments, drawers where you will use them, shelves at the right spacing, and a spot for shoes. Doing it well is a design exercise, not a carpentry one.
The first choice is the doors. Hinged doors give full access and need clear space to swing; sliding doors save that space, which is why they are common in smaller bedrooms. Beyond that, a dressing room is a wardrobe that has become a room. For wider joinery see joinery and carpentry, and for a loft, loft conversions, where fitted storage under the slope is very effective.

Two to five weeks from design to fitting.
We measure the alcove, check for pipes and uneven walls, and ask how you use it.
A drawing of the doors and the interior, with materials and finishes.
Made to measure in the workshop.
Installed, levelled and scribed to the walls and ceiling.
Hinged or sliding doors fitted and adjusted.
Rails, drawers, shelves and accessories.
Checked with you.
We measure and talk through how you use the space. No cost and no obligation.
A drawing and a price per linear metre.
Made in the workshop and fitted in a day or two.
Warranty on the joinery.
Floor to ceiling and wall to wall, so nothing is wasted.
Hanging, drawers and shelves arranged around what you own.
Under stairs, in sloping ceilings and in odd corners.
Hinged or sliding according to the room.
Finishes chosen to last in daily use.
On the joinery and the fitting.
Per linear metre, VAT excluded.
| Type | What it covers | Indicative range | |
|---|---|---|---|
| Wardrobe (doors + interior) | Standard finishes, practical solution | From 450 €/m | |
| With sliding doors | Selected materials, best balance | From 550 €/m | |
| Dressing room | Premium materials and high-end interior design | Depends on project |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
A made-to-measure wardrobe to the ceiling, with doors and interior.
Ideal where there is no room for hinged doors to swing.
A full dressing room, open or closed, made to measure.
Made-to-measure storage for strange and difficult spaces.
On a party wall or a wall with a damp history, a wardrobe can hide a problem. We check the wall behind before we build, because fixing damp behind a finished wardrobe means taking it down.
The scope of a fitted wardrobe, and what is separate.
VAT is shown as its own line — 10% or 21% depending on your case.
Fitted storage connects joinery, painting and renovation.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about fitted wardrobes.
Because no catalogue wardrobe fits your alcove exactly. A made-to-measure one goes to the ceiling and wall to wall, with the interior arranged for what you own, so you get more storage in the same space with no dust-collecting gaps. The extra cost is usually small compared with the extra capacity.
Hinged doors give you full access to the whole interior and need clear floor to swing. Sliding doors need no swing space, which suits small bedrooms and narrow corridors, but only half of the wardrobe is open at once. We recommend according to the room.
Yes — it is where made-to-measure shows its value. Sloping ceilings, spaces under stairs and irregular alcoves can all be fitted, usually with drawers and shelves cut to the angle.
From about 450 €/m for a wardrobe with doors and interior, and from about 550 €/m with sliding doors, excluding VAT. A bedroom wardrobe of three metres comes to around 1,350 to 1,650 € or more, depending on finish and interior.
Two to five weeks from the survey to fitting. The making takes the most time; the fitting is a day or two.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey and measurement anywhere in Catalonia. A drawing and a fixed price.