Outdoors · Catalonia

Courtyard (patio) renovations in Catalonia

A courtyard is a luxury in a city: light, air and a small outdoor corner of your own. Properly renovated — with the waterproofing and drainage sorted — it becomes a little green oasis you can use all year.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Courtyard renovation

A small space where every detail shows.

A courtyard in a Catalan town house or ground-floor flat is usually small, shaded, paved in something tired and, very often, sitting over a room. That last point is the one that decides everything: a patio above a habitable space is a roof, and it needs a proper waterproofing membrane and drainage, or the room below is damp.

So we start with the layers under the surface. A sound membrane, correct falls to an outlet that is not blocked by leaves, and an upstand where the paving meets the walls. Only then do the visible things matter: paving that works in the shade, planters sized for the root volume they need, a vertical garden if the floor space is small, and lighting that makes the courtyard usable in the evening.

Planting is where courtyards most often disappoint. A shady, enclosed courtyard needs plants that tolerate shade and limited soil, not the sun-lovers of a brochure. We choose them accordingly and give you an irrigation plan. For bigger outdoor spaces, see gardens and terraces.

Newly dug drainage trench beside a stone wall, with red pipes at the bottom and steel reinforcement to one side
How it runs

Renovating a courtyard, step by step.

One to three weeks for a typical courtyard.

01

Survey

We check what is underneath, the falls, the outlets and any damp showing in the rooms below.

02

Strip-out

Old paving and screed removed to the structural deck.

03

Falls and drainage

A screed laid to fall to a properly sized outlet.

04

Waterproofing

A continuous membrane with upstands, flood-tested before covering.

05

Paving

Paving chosen for shade and for slip resistance when wet.

06

Planting and lighting

Planters, a vertical garden if useful, irrigation and lighting.

07

Handover

We explain how to care for the planting and the outlet.

How we work

How we run a courtyard project.

01

Free survey

We visit and check what is under the surface. No cost and no obligation.

02

Fixed quote

An itemised quote, with the waterproofing priced separately.

03

Build, with one site manager

One person coordinates the trades.

04

Handover and warranty

Warranty on the waterproofing specifically.

Why us

Why renovate your courtyard with us.

Waterproofing first

We never pave over a membrane we have not tested.

Drainage that works

A properly sized outlet with accessible cleaning.

Plants for shade

Planting chosen for the light you actually have.

Vertical space used

Planters and living walls for small floor areas.

Lit for the evening

Lighting on its own circuit, so the courtyard is a room after dark.

One site manager

Every trade coordinated by one person.

Prices

What a courtyard renovation costs.

Per square metre, VAT excluded.

What a courtyard renovation costs — Indicative prices · VAT not included
ScopeWhat it coversPer m² (excl. VAT)
BasicStandard finishes, practical solution100 – 200 €/m²
DesignerPremium materials and high-end interior designFrom 350 €/m²
Indicative prices · VAT not included. In a small courtyard the price per square metre rises, because the waterproofing, the drainage and the planters are concentrated in few metres. Waterproofing is the item never to economise on. Everything is itemised.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate8,000 – 16,000 €Basic · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of courtyard.

Indicative ranges, VAT excluded.

Small courtyardUp to 10 m²2,000 – 5,000 €

Light wells and corners. Waterproofing, paving and a vertical garden.

Medium courtyard10 – 25 m²4,000 – 10,000 €

Room for a seating or dining area, planters and lighting.

Large courtyardOver 25 m²From 9,000 €

Large ground-floor courtyards, almost a small garden.

Waterproofing onlyWatertightFrom 50 €/m²

Where the problem is leaks: renew the membrane, outlets and paving.

In a block of flats a courtyard is often common property or a light well, in which case changes need the owners’ consent. A private courtyard on a ground-floor flat is usually the owner’s to renovate, but the waterproofing may still be a shared matter. We check.

No small print

What is included and what is not.

The scope of a courtyard renovation, and what is separate.

✓ Included in the price

  • Survey and leak diagnosis
  • Strip-out of the old paving and screed
  • New screed to falls and a properly sized outlet
  • Continuous waterproofing membrane with upstands
  • Flood test before paving
  • Paving
  • Planters and irrigation
  • Lighting on its own circuit
  • A written warranty on the waterproofing

✕ Not included — quoted separately

  • Plants, unless itemised
  • Pergolas and shade structures, unless itemised
  • Furniture
  • Repairs to the building’s structure or walls
  • Council taxes and fees
  • Works needing the owners’ association’s consent

VAT is shown as its own line — 10% or 21% depending on your case.

Where we work

Where we renovate courtyards.

Courtyards across Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about courtyards.

Can a light well be renovated?

Often, though it depends on whether it is common property. A light well serves the ventilation and light of several flats, so changes to it need the owners’ consent and must not block the function. Waterproofing, new paving and light planting are normally acceptable. We check the position for your building.

The courtyard is causing damp in the room below. How is it fixed?

By waterproofing the courtyard properly, which means lifting the paving, checking the falls and the outlet, laying a continuous membrane with upstands and flood-testing it before re-paving. Treating the damp inside without fixing the courtyard is money wasted. See damp treatment.

What plants grow in a shady courtyard?

Those that tolerate shade and limited root space: ferns, hostas, ivy, some climbers, evergreen shrubs such as aucuba or fatsia, and moss-tolerant ground cover. The sun-lovers sold with Mediterranean gardens struggle. We choose for the light you actually have and set up irrigation to match.

How much does it cost?

Roughly 100 to 200 €/m² for a basic renovation, 200 to 350 €/m² for a complete one and from 350 €/m² for a designer courtyard, excluding VAT. A 15 m² courtyard at the complete level comes to around 3,000 to 5,250 €.

How long does it take?

One to three weeks depending on the size and the weather. Waterproofing cannot be laid in the rain.

How is it paid for?

In stages tied to completed work, with a deposit on signing and a final payment at handover.

Free quote

Get a quote for your courtyard.

Free survey anywhere in Catalonia. Waterproofing quoted separately from the finishes.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →