In a shop the design sells: a window that stops people passing, lighting that makes the product look its best, and a route through the space that invites them to buy. And all done fast enough that you do not miss the season.
A shop is judged in three seconds from the pavement. The window, the sign and the lighting decide whether anyone comes in, and everything else decides whether they stay and buy. A good shop fit-out is therefore less about expensive finishes than about those three things, and then about how the customer moves through the space.
Lighting does more than anything else. The right light makes the product look better and the space look larger; the wrong light makes a nice fit-out look cheap. We design it in layers — general, accent on the displays, and the window — and put the electrics in the right places at first fix, because moving them later means opening the ceiling.
Most shops need to be ready by a date: a season, a campaign, the end of a rent-free period. We plan to that date and tell you honestly what is achievable. If you are a chain with several units, we can do them as a rollout. For other business types, see commercial unit fit-out; for cafés and food, cafés.

Three to eight weeks of building. The licence or notification runs in parallel.
We look at the unit, the frontage and your product, and agree the layout, the window and the lighting concept.
Depending on the activity and the municipality, a prior communication or a licence is filed.
Previous fit-out out, then electrics, lighting circuits, ventilation and air conditioning.
Surfaces prepared and finished, with brand colours and materials.
Counters, shelving, changing rooms and the stockroom.
The shopfront, the window display and the sign, with their own lighting.
Final certificates, snagging and handover on the agreed date.
We visit and talk through your product and your customers. No cost and no obligation.
A fixed itemised quote and a written date, planned around your season.
One person coordinates every trade, with photographs of progress.
Certificates and warranty, ready to stock and open.
The most effective money in a shop, specified before the finishes.
The frontage, window and sign treated as the main marketing tool, which they are.
We plan to your date and say honestly if it is achievable.
A repeatable specification and one site manager, for brands with several units.
Notification or licence, accessibility and fire safety dealt with.
A closed price by trade.
Per square metre of floor area, VAT excluded.
| Specification | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| Basic fit-out | Standard finishes, practical solution | 300 – 550 €/m² | |
| Mid-range | Selected materials, best balance | 550 – 900 €/m² | |
| Designer / flagship | Premium materials and high-end interior design | 900 – 1,700 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Neighbourhood shops. The window and the lighting make the difference.
The most common size, with a sales area, changing rooms and a stockroom.
Brand spaces, with design and lighting at a higher level.
Renewing only the window, the sign and the frontage lighting. High impact and quick.
The frontage is often governed by the council’s rules and the building’s — sign sizes, materials and, in protected areas, heritage restrictions. We check the position before you commission a sign, because a sign that has to be removed is wasted money.
The scope of a turnkey shop fit-out, and what is separate.
VAT is shown as its own line — normally 21% on works for a business.
A shop draws on most of this list, coordinated by one person.
Shops in Barcelona and across Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What shopkeepers ask before fitting out.
Often, if we plan backwards from the date and start the notification or licence immediately. We commit to a written date, tell you honestly what it depends on, and warn you early if the council’s timing is the risk. Building a shop is quick; waiting for the paperwork is not, so the start date matters more than the speed of the build.
Yes, and it is one of the highest-return jobs there is. A new window, sign and frontage lighting can transform how a shop reads from the street in a couple of weeks, for a few thousand euros. Check the council’s and the building’s rules on signs first, which we do as part of the job.
Roughly 300 to 550 €/m² for a basic fit-out, 550 to 900 €/m² for mid-range and 900 to 1,700 €/m² for a designer or flagship scheme, excluding VAT. An 80 m² shop at mid-range comes to around 44,000 to 72,000 €.
It depends on the activity and the municipality. Many shops need only a prior communication to the council, but some activities, and some areas, require a fuller licence with a technical project. We tell you which applies to yours before you spend on design. See permits and drawings.
Yes. A repeatable specification, one site manager and a consistent standard across units make a rollout faster and cheaper than treating each unit as a new project. We agree a specification and price it once.
In stages tied to completed work: a deposit on signing, payments at the end of each phase, and a final payment at handover. Never the full amount in advance.
Yes, and it is free. The condition of the unit, the services and the frontage rules decide what the fit-out will cost. Ask for a survey.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia. A fixed quote and a written opening date.