Every building job needs the right permission, and the cost of skipping it is a fine, a stop order or a problem when you sell. We tell you which permission your work needs, draw up the project if one is required and deal with the council.
In Spain, building work needs permission, and doing a renovation without the right one can end in a fine, a stop order, or trouble at the notary when you sell. The first thing we do is tell you which permission your work actually needs, because that is the question most owners cannot answer and the answer decides the cost and the timeline.
There are two main routes. For minor works that do not touch the structure, a prior notification to the council — a comunicado previo — is generally enough. For work that affects the structure, the façade, or substantially changes the layout, you need a major works licence (licencia de obra mayor), which requires a technical project and the supervision of a registered architect or technical architect. Which route applies is decided by the scope of the works, and by the municipality, since the rules vary from council to council.
We write the technical project and file the documents with the council. We also prepare activity projects for shops and businesses, legalisations of work already carried out, and technical certificates. Everything is signed by registered professionals, so your renovation or your business can start without surprises.
If you are renovating a flat and the work touches anything shared, such as the façade, a communal patio or a riser, you will also need the owners’ association’s agreement, which is a separate process from the council permit. We tell you which you need. See full home renovations for how this fits into a complete job.

The permit is the long pole in most projects. How long depends on the council, and no contractor controls that.
We analyse your works and tell you what you need: a notification, a major works licence or an activity project.
Where one is needed, we draft the technical project and supporting documents with a registered professional.
We submit the application and documents to the relevant municipality.
We track the file and answer any request from the council for further information.
We obtain the licence or confirmation so that you can start work lawfully.
When the work is complete, we arrange the completion certificates that apply.
Describe the work or the business, and we tell you which permission is needed. No obligation.
A clear fee for the project and the filing, according to the type of permission.
We draft the project and file the documents with the council.
We stay with the file until the licence or confirmation arrives.
We analyse the work and say plainly which permission applies, instead of leaving you to guess.
The project and the supervision are by a registered architect or technical architect.
We draft, file and follow the file to the end.
Work done with the right permission does not get stopped or fined.
For shops and businesses, so that you can open.
If we are also doing the renovation, one contact handles both the permit and the work.
Our professional fees, by type of permission. Municipal charges are separate.
| Procedure | What it covers | Indicative fee (€) | |
|---|---|---|---|
| Notification / minor works | Standard finishes, practical solution | 300 – 800 € | |
| Major works project | Selected materials, best balance | From 1,500 € | |
| Activity project | Premium materials and high-end interior design | From 1,500 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative professional fees, excluding VAT and the council’s charges.
For renovations that do not touch the structure or make a significant change to the layout.
A technical project and supervision by a registered professional, for work affecting the structure or the façade.
An activity project, needed to open a shop or a business.
Legalising work carried out without permission, and technical certificates.
The procedure is set by the scope of the work: not touching the structure is usually covered by a notification; touching the structure, the façade or making a significant change to the layout needs a major works licence with a project. We tell you which before you spend anything.
What our permit service covers, and what is separate.
VAT is shown as its own line. The council’s charges and the ICIO are paid to the council separately from our fees; we estimate them for you so that you can see the full cost.
Permits are part of most jobs; we handle them alongside the building work.
Permits and drawings in Barcelona and across Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about permits and drawings.
It depends on what you are doing. Work that does not touch the structure or significantly change the layout usually needs only a prior notification to the council. If you affect the structure, the façade, or make a major change to the layout, you need a major works licence with a technical project. The rules vary by municipality, so we check the local position and tell you before you commit to anything.
For minor works generally not. For major works, yes: you need a technical project and supervision by a registered professional, an architect or a technical architect depending on the case. We work with registered professionals and handle it, so you do not have to find one.
You risk a fine, a stop order and in some cases having to undo what you have done, quite apart from problems when you come to sell — a buyer’s lawyer or a notary may ask for the paperwork. It is almost always cheaper and quicker to do it properly from the start than to regularise it afterwards.
In many cases, yes: by filing a legalisation with the technical documentation that shows the work, provided it complies with current regulations. We assess whether that is possible, and what it would take, before you commit to anything. Where work cannot be legalised, we tell you that too.
The council’s charges and the ICIO (the construction tax) depend on the municipality and on the budget of the work; they are paid to the council, not to us. We give you an estimate with the quote so that you know the full cost from the outset.
A notification is generally quick. A major works licence can take weeks or months depending on the municipality, and that is the part nobody can promise. We track the file to keep it moving, and tell you the expected timeline before you plan around it. It is sensible to start the permit process before you have finished choosing finishes, because the two run in parallel.
If the work touches anything shared, yes. The council permit and the owners’ association’s agreement are two separate things: one is public-law permission to build, the other is the owners’ consent to alter common property such as the façade, a patio or a riser. Work entirely inside your own flat that does not affect the building normally needs only the council. We tell you which applies.
We can review what is in place and tell you what you would need for the work you have in mind, which is useful before you make an offer. We are not a law firm, so title and planning-law questions go to your lawyer, but on the practical question of what permits your renovation would need, we can usually tell you quickly. Ask for a survey.
Yes, as part of a conversion project where the first step is a feasibility study. It is a distinct planning procedure with its own requirements, and it is the stage that decides whether the project is possible at all. See commercial-to-residential conversions.
Yes, and having the same team do the permit and the build means the drawings are produced by people who will have to build them. If you would rather only use us for the permit, that is fine — we will give you the project and the licence, and you can take them to any contractor.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Tell us what you plan and we tell you what you need. Permits and technical projects across Catalonia.