Outdoors · Catalonia

Awnings and pergolas in Catalonia

Gain shade and use your terrace or garden all year. We fit made-to-measure motorised awnings and bioclimatic pergolas with sensors, to shield you from sun and rain with style.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Awnings and pergolas

Shade is what makes a terrace usable in July.

On a Catalan terrace the sun in July decides everything. Without shade the space is unusable from midday; with it, it becomes a room. So shade is not a decoration, it is the difference between a terrace you use and one you look at.

There are three main options. A retractable awning is the cheapest and simplest, and goes up against a wall. A fabric pergola is a fixed frame with a stretched or sliding canopy. A bioclimatic pergola has adjustable louvres: open for ventilation and light, angled for shade, closed to keep the rain out. It is the most complete and the most expensive.

Whatever you choose, sensors are worth having. A wind sensor retracts the awning or closes the louvres in a gust, which protects the investment, and a sun sensor deploys it when it is needed. Check the permissions before you order: anything fixed and visible usually involves the council and the community. See terrace renovation and gardens.

Terrace with stone-effect stoneware steps, metal railing and plants beside the wall
How it runs

Fitting shade, step by step.

One to three days to fit, after two to six weeks for manufacture.

01

Survey and options

We look at the sun, the structure, the space and the rules, and show the options at different budgets.

02

Permissions

For a fixed or visible structure, we check the community’s and the council’s requirements.

03

Manufacture

Made to measure.

04

Fixings

Fixed to a sound structure, with the waterproofing respected.

05

Fitting

The awning or pergola fitted and levelled.

06

Sensors and lighting

Wind and sun sensors, remote control and lighting where chosen.

How we work

How we run an awning or pergola project.

01

Free survey

We visit and measure. No cost and no obligation.

02

Fixed quote

An itemised quote, with extras priced separately.

03

Fitting

A clean installation.

04

Handover and warranty

Warranty on the structure and the motor.

Why us

Why use us for shade.

The right option for the space

We do not sell the most expensive; we show what each option does.

Sensors recommended

They extend the life of the awning and protect it.

Fixings that respect the roof

We do not puncture a waterproofing membrane carelessly.

Permissions checked

We tell you before you order what the community and council allow.

Made to measure

Fitted to your terrace.

Warranty

On the structure and the motor.

Prices

What awnings and pergolas cost.

Supplied and fitted, VAT excluded.

What awnings and pergolas cost — Indicative prices · VAT not included
TypeWhat it coversIndicative range (€)
Motorised awningStandard finishes, practical solution600 – 2,500 €
Bioclimatic pergolaPremium materials and high-end interior designFrom 3,500 €
Indicative prices · VAT not included. The price depends on type, size and extras — motorisation, sensors, lighting, side screens. A motorised awning is the most economical; a bioclimatic pergola is the most complete, with adjustable shade and protection from rain. Everything is itemised.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Full renovation · functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

By type

What it costs by type.

Indicative ranges, VAT excluded.

AwningArm, cassette, vertical600 – 2,500 €

Simple and effective shade for a terrace, balcony or window.

Fabric pergolaFixed structureFrom 2,000 €

A structure with a stretched or sliding canopy over a seating area.

Bioclimatic pergolaAdjustable louvresFrom 3,500 €

Louvres you adjust and close; tailored shade and rain protection.

Side screensWind barriersAsk us

Glass curtains or side panels to use the pergola all year.

A pergola above a habitable room puts load on the structure and the waterproofing. We check the deck and fix through, or around, the membrane in a way that keeps it watertight.

No small print

What is included and what is not.

The scope of an awning or pergola job, and what is separate.

✓ Included in the price

  • Survey and measurement
  • Made-to-measure structure and fabric
  • Fixings and installation
  • Motorisation
  • Wind and sun sensors, where chosen
  • Remote control
  • A written warranty

✕ Not included — quoted separately

  • Lighting and heaters, unless itemised
  • Side screens, unless itemised
  • Council fees and licences
  • Works needing the owners’ association’s consent
  • Waterproofing of the terrace beneath
  • Electrical supply to the motor, unless itemised

VAT is shown as its own line — 10% or 21% depending on your case.

Where we work

Where we fit awnings and pergolas.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about shade.

What is a bioclimatic pergola?

A pergola whose roof is made of adjustable louvres. Angled, they shade and ventilate; closed, they keep out the rain and carry the water away through the frame. It is the most versatile way to use a terrace in all weathers, and it can carry lighting and sensors. It costs considerably more than an awning.

Awning or pergola?

An awning is cheaper and simple, and right for a balcony or a terrace wall. A pergola is a structure that makes a defined outdoor room and works away from walls. If you want rain protection too, a bioclimatic pergola is the option. We show you what each does on your terrace.

Do they retract in the wind?

Yes, if you fit a wind sensor, and you should. It retracts the awning or closes the louvres when the wind rises, which protects the fabric and the structure. A sun sensor deploys it when it is needed.

Do I need permission?

It depends on the size, whether it is fixed, and whether it is visible from the street. Some need a council licence and, in a block of flats, the owners’ association’s agreement. We check before we fit.

How much does it cost?

Roughly 600 to 2,500 € for a motorised awning, from 2,000 € for a fabric pergola and from 3,500 € for a bioclimatic one, excluding VAT.

How is it paid for?

In stages: a deposit when the order is placed, the balance on completion.

Free quote

Get a quote for your terrace.

Free survey anywhere in Catalonia. Options at different budgets, priced side by side.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →